A fresh look at dual reticulation June 2014. A fresh look at dual reticulation An assessment of the performance and ongoing viability of dual reticulation.

Slides:



Advertisements
Similar presentations
March 2012 Ports and Cities Conference Newcastle Dorte Ekelund, Executive Director Major Cities Unit Department of Infrastructure and Transport
Advertisements

Blacktown as a Water Sensitive City
The Green Arc Vision “Bringing the Big Outdoors closer to everyone – by creating, linking and managing extensive and valued landscapes for people and.
The South East Queensland Drought Experience Lessons for Canadian Demand Management Practitioners Kirk Stinchcombe Manager, Operational Policy and Planning.
Regulatory Proposal December We provide distribution services to 1.4 million residential and business customers We deliver electricity to.
Drinking Water Through Recycling The benefits and costs of supplying direct to the distribution system Dr Stuart Khan School of Civil & Environmental Engineering,
FACILITATING RETURN ON ENVIRONMENTAL INVESTMENT - RESPONSIBLE AND PROFITABLE PORTS BUSINESS, UNINTERRUPTED! Dr Louis Celliers Safe and Sustainable Ports.
City of Farmersville, Texas Water and Wastewater Rate Study February 2011.
PricewaterhouseCoopers 26 July 2007 Page 1 ACCC Regulatory Conference 2007 ACCC Regulatory Conference 2007 Water market regulation, infrastructure access.
Water Too Much or Too Little? Or a Little of Both? URS Group Inc ASFPM National Conference May 2010.
NADAFA Program Forum Quarterly Meeting, Abu Dhabi Sustainability Group
Implementing ESD in Major Infrastructure Projects Jo Moss - Senior Principal.
Page 1© QR 2007 All Rights Reserved Unlocking Australia’s Export Supply Chain Bottlenecks Stephen Cantwell Group Executive General Manager, QR Freight.
Financing “Greenfield” Developments An Overview of Financing Options for a combined Water System Presentation to NARUC Water Committee July 2007 By Keith.
LA: To evaluate how water supply and demand can be managed sustainably By Adrijana, Stagg and Leon.
Optimum use of water in the domestic and industrial sectors JN Bhagwan.
Safe Use of Wastewater in Agriculture UN-Water at IFAT 2012 Water reuse in Agriculture in the Arab region Situation, needs and challenges Eng. Khaldon.
Municipal and Industrial Conservation and Water Reuse Workgroup Elizabeth Lovsted Sr. Civil Engineer Urban Water Institute Annual Water Policy Conference.
IAL Conference, June 2012 Irrigation Modernisation: A Partnership Approach in the SA Murray-Darling Basin Region Brenton Fenwick 1 and Michael Cutting.
Water Conservation Planning June 3, 2008 Lee Keck Division of Water Supply.
SUSTAINABILITY TEAM | May 19, 2010 Illinois APA, September 24, 2010.
Perspectives on Rainwater Harvesting: Past, Present and Future
EAST DON TRAIL ENVIRONMENTAL ASSESSMENT Project Overview Ward 31 Ravine Meeting November 4, :00 to 9:00 p.m. Presteign-Woodbine United Church.
2013 Annual Strategic Action Plan Evaluation. Overview Background Role of SAP Implementation Evaluation process Council feedback Enhancement of SAP.
City of Savannah Water, the Lifeline of the Community.
1 Sustainable Agricultural Economic benefits of reservoir scale expansion in Balkh Basin, Afghanistan Abdelaziz A. Gohar & Frank A. Ward New Mexico State.
NATIONAL EXECUTIVE FORUM ON PUBLIC PROPERTY April 30, 2004.
Australian Water Summit Sydney March 2006 Is privatisation of water infrastructure and services the answer? Phillip Mills Director of Water Services, Water.
Carbon, Water and Energy Implications of Rainwater Harvesting in Educational Buildings Hannah West, Dr. Defne Apul Department of Civil Engineering, University.
‘Improving Quality of Life and Enhancing Sustainable Economic Development’
Fraser Island – World heritage Site. Fraser Island – The year of inscription Fraser Island was one of 15 World Heritage places included in the National.
Jeff’s slides. Transportation Kitchener Transportation Master Plan Define and prioritize a transportation network that is supportive of all modes of.
“Overcoming the Challenges” BPAA Inc. National Conference Qld Trevor Hayes July/August 2015.
G21 - GEELONG REGION ALLIANCE STATE OF THE REGION – WIDE BAY BURNETT ELAINE CARBINES CHIEF EXECUTIVE OFFICER APRIL 2014.
The aim / learning outcome of this module is to understand how to gather and use data effectively to plan the development of recycling and composting.
ADELAIDE DARWIN MELBOURNE PERTH WHYALLA Page 1 Metropolitan Local Government Group Recycled Water Scheme For Metropolitan.
DGTS Model ADGF01 CEO Executive Approval 18/2011 Commercial Grey Water Treatment System “better managing your water needs” Save up to 86% of your water.
LADWP WATER CONSERVATION IEPR Workshop August
City of Renton, WA Water Use Efficiency Margaret Ales PNWS – AWWA CONFERENCE MAY 1, 2008 Copyright © 2008 by R. W. Beck, Inc. All Rights Reserved. Opportunities,
CSC 6 February 2008 The Don Catchment as an Opportunity Facilitating Answers to ICM Dr. Jonathan Hillman.
Short and Long Range Water Supply Planning and Aquifer Performance Test (APT)
1 Presentation to the Portfolio Committee: Water & Environment Presentation by Mr Trevor Balzer Programme Manager: Special Projects 16 – 17 March 2010.
Sustainable Asset Management Planning Tony Miguel 17 June 2005.
Alternative Water Supply - A Water Services PerspectivePortfolioCommittee 14 September 2005 DEPARTMENT: WATER AFFAIRS AND FORESTRY.
2008 Electricity Distribution Maintenance Summit Stream 3A: Funding, Investment and Financial issues 10 June 2008 Theo van Vuuren Divisional Executive.
Heat Network Partnership Workshop Glasgow 8 September 2015.
Maximizing Water Supply Sustainability for the Goleta Valley Ryan Drake Water Supply and Conservation Manager 2015 Central Coast Sustainability Summit.
Environment SPC 24 th June 2015 Draft Dublin City Development Plan
NATIONAL WATER RESOURCE STRATEGY SOUTH AFRICA’S WATER SITUATION AND STRATEGIES TO BALANCE SUPPLY AND DEMAND LOWER ORANGE WMA.
November 17, 2015 Charting the Future of Water Reuse for the City of Raleigh Sheryl D. Smith, P.E. – CDM Smith Eileen M. Navarrete, P.E., PMP – City of.
1 Strategic Plan | May Decisions on rates, budgets, investments, programs and services for six years ( ) The Strategic Plan.
Infrastructure Update RV Travel Park expansion 13 sites exist today Plans developed by Army for 40 site expansion Expansion can be supported by existing.
Department of Employment, Economic Development and Innovation Harnessing the Digital Economy “Setting the Strategic Context” 9 December 2011 Malcolm Letts.
QUARTERLY PERFORMANCE OF THE MUNICIPAL INFRASTRUCTURE GRANT (MIG) – 2005/06 AND 2006/07 FINANCIAL YEARS Presentation to the Select Committee On Finance.
Alternative Funding Scheme Tallaght Integrated Area Plan Mary Henchy.
PAS Peer Day 10 th February 2015 Zoe Willcox Service Director Planning Place Directorate Positive Planning: Delivering Housing Unblocking stalled sites.
Wind Prospect Experience and Practicalities of Wind Energy International Cooperation Forum for Energy Service Companies (ESCO’s) - Opportunities in China.
Council Improvement Plan Council Meeting 1 June
Community Solar Farm And Smart Metering Projects Community Solar Farm And Smart Metering Projects.
Do you know? By 2015, an estimated 40-48% of new non-residential construction by value will be green, equating to a $ billion.
Deryck Shaw, APR Consultants Ltd May 24, 2016 May 24, 2016 Rotorua Perspective: Economic Market Outlook
Recycled Water Salinity Reduction Policy Utilities Advisory Commission December 2, 2009.
Asset Degradation Modelling at Townsville Water
19th International Riversymposium New Delhi, India Dr. Ranvir Singh
Management of Nutrient Discharges
STATEWIDE DROUGHT RESPONSE: IMPACT TO SOUTH ORANGE COUNTY
Santos – upstream developments
Drought Planning Through Integrated Rate Design
The SWITCH Approach to Integrated Urban Water Management
Background Broward County currently operates a 10 MGD reuse facility located at the North Regional Wastewater Treatment Plant. Customers include commercial,
Presentation transcript:

A fresh look at dual reticulation June 2014

A fresh look at dual reticulation An assessment of the performance and ongoing viability of dual reticulation schemes on the Gold Coast, the assessment utilises the Australian Water Recycling Centre of Excellence’s Total Economic Value Framework. Irrigation Australia National Conference Presented by: Kathy Baker Executive Coordinator Integrated Water Cycle Planning Gold Coast Water June 2014

Slide 3 Background  Prior to 2006, GCW owned and operated its bulk water supply assets  Pimpama Coomera Waterfuture Master Plan (including Class A+ recycled water) adopted in 2004  By 2056, Class A+ predicted to contribute 20ML out of 366ML  Millennium drought effecting South East Qld  10 years since adoption – appropriate to review and consider the current and future costs and benefits

Slide 4 Map…

Slide 5 Map…

Slide 6 Map… Class A+ Uses:  Outdoor – garden irrigation, car washing  Indoor - toilet flushing  Fire fighting

Slide 7 Current situation  Class A+ to 6000 properties in the Pimpama Coomera region  Use 0.5% (0.8 ML/day) City’s total water demand  10 ML/day is supplied by Class B/C recycled water schemes  Class A+ usage rate much less then expected  Only 8 ML/day expected in 50 years (2.4%)

Slide 8 Key changes since adoption IssuesAssumptions/Outcomes Drought Millennium drought broke and water use behaviours have changed significantly in SEQ Bulk waterState Government took ownership Population projectionsGrowth rates have slowed from those projected for the PIP. Environmental dischargeNo Pimpama River release. Outdoor water use General outdoor water use has decreased by 65% compared with original assumptions. Household recycled water demand Actual recycled water demand per household is currently 75% less than that assumed for original demand projections. Scheme capital costs WOL (50yrs) capital costs for Class A+ recycled water, approx. double original estimate in the PCWF Master Plan. Scheme operating costs WOL O & M costs of Class A+ treatment & distribution system approx. 10 times greater than originally estimated.

Slide 9 Issues  Cross-connections – complicated pipework on-lot and off-lot  Household audits

Slide 10 Value and viability assessments  Not financially viable - cancelled future expansion of DR into the Stapylton, Yatala and Cabbage Tree Point areas  Detailed Value Assessment of Pimpama Coomera  Total economic value of recycling – financial, environmental and social factors  Australian Water Recycling Centre of Excellence

Slide 11 End of dual reticulation for City of Gold Coast  Council resolved in December 2013 to discontinue implementation of dual reticulation on the Gold Coast due to:  High cost of operating and maintaining the scheme  High cost of constructing new capital infrastructure  Low demand usage  Negative net “value” (costs outweigh benefits)  Significant regulatory monitoring and reporting requirements  Risk of cross connections  Estimated to save rate payers $3 million/year or $114 million over 40 years (in 2013 dollars)

Slide 12 Transition Plan to decommission Class A+ supply  Potable water to be supplied via both potable and recycled water networks  Initially operated as discreet systems (no mixing)  Class C return main from Pimpama STP to Coombabah STP  ‘Switch over’ estimated to occur by December 2016

Slide 13 Existing Recycled Water Scheme - Northern Supply Scheme - Southern Supply Scheme Class B/C - Approximately 50 fixed customers - Some 400 Recycled Water Carrier Customers - Total reuse for the past 5 years ranges from 16.5% % - Total irrigated area approximately 1700ha - Irrigation of Sporting Fields, Council owned Parks, Schools, Nurseries, STP wash-down, Municipal Irrigation and Industrial / Commercial Use

Slide 14 Where to from here? Release -Seaway -Ocean? Local Opportunities - Identified further open space irrigation Additional treatment Class C to Class A+ - Jupiter’s Casino - Potential Commonwealth Games venues

Slide 15 Where to from here? Potential Northern Recycled Water Scheme

PO Box 5042 Gold Coast MC QLD 9729 P 1300 GOLDCOAST E W cityofgoldcoast.com.au