An LHCb general-purpose acquisition board for beam and background monitoring at the LHC F. Alessio, R. Jacobsson, CERN, Switzerland Z. Guzik, IPJ Swierk,

Slides:



Advertisements
Similar presentations
ATLAS Tile Calorimeter Performance Henric Wilkens (CERN), on behalf of the ATLAS collaboration.
Advertisements

Federico Alessio Supervisors Diego Gamba, Angelo Rivetti Richard Jacobsson A complete system for controlling and monitoring the timing of the LHCb experiment.
Experimental set-up at E.S.R.F. L. Farvacque. 1/04/2004L. Farvacque - E.S.R.F.2 Experimental set-up Hardware Kickers Bpms Software Data acquisition processing.
The EMMA Turn-by-Turn BPM System A. Kalinin ASTeC Daresbury Laboratory STFC EMMA Commissioning Workshop Daresbury Laboratory, 21 May 2009.
J. Leonard, U. Wisconsin 1 Commissioning the Trigger of the CMS Experiment at the CERN Large Hadron Collider Jessica L. Leonard Real-Time Conference Lisbon,
28 August 2002Paul Dauncey1 Readout electronics for the CALICE ECAL and tile HCAL Paul Dauncey Imperial College, University of London, UK For the CALICE-UK.
Y. Karadzhov MICE Video Conference Thu April 9 Slide 1 Absolute Time Calibration Method General description of the TOF DAQ setup For the TOF Data Acquisition.
Luminosity Monitors MICE Video Conference 7 May 2009 Paul Soler.
Beam Loss Analysis Tool for the CTF3 PETS Tank M. Velasco, T. Lefevre, R. Scheidegger, M. Wood, J. Hebden, G. Simpson Northwestern University, Evanston,
Design and test of a high-speed beam monitor for hardon therapy H. Pernegger on behalf of Erich Griesmayer Fachhochschule Wr. Neustadt/Fotec Austria (H.
Various Topics Related to FEB Liang Han, Ge Jin University of Science and Technology of China Dec.21,2013.
3/7/05A. Semenov Batch-by-Batch Intensity Monitor 1 Two-Channel Batch by Batch Intensity Monitor for Main Injector BBI.
Electronics for PS and LHC transformers Grzegorz Kasprowicz Supervisor: David Belohrad AB-BDI-PI Technical student report.
K.C.RAVINDRAN,GRAPES-3 EXPERIMENT,OOTY 1 Development of fast electronics for the GRAPES-3 experiment at Ooty K.C. RAVINDRAN On Behalf of GRAPES-3 Collaboration.
Beam phase and intensity measurement Grzegorz Kasprowicz Richard Jacobsson.
Status of the Beam Phase and Intensity Monitor for LHCb Richard Jacobsson Zbigniew Guzik Federico Alessio TFC Team: Motivation Aims Overview of the board.
CERN Real Time conference, Montreal May 18 – 23, 2003 Richard Jacobsson 1 Driving the LHCb Front-End Readout TFC Team: Arek Chlopik, IPJ, Poland Zbigniew.
S. De Santis “Measurement of the Beam Longitudinal Profile in a Storage Ring by Non-Linear Laser Mixing” - BIW 2004 May, 5th Measurement of the Beam Longitudinal.
1 ALICE T0 detector W.H.Trzaska (on behalf of T0 Group) LHCC Comprehensive Review, March 2003.
BI day 2011 T Bogey CERN BE/BI. Overview to the TTpos system Proposed technical solution Performance of the system Lab test Beam test Planning for 2012.
Measurement opportunities with the LHC transverse damper W. Hofle, D. Valuch.
14/6/2000 End Cap Muon Trigger Review at CERN 1 Muon Track Trigger Processing on Slave and Hi-pT Boards C.Fukunaga/Tokyo Metropolitan University TGC electronics.
Management of the LHCb DAQ Network Guoming Liu * †, Niko Neufeld * * CERN, Switzerland † University of Ferrara, Italy.
1 VeLo L1 Read Out Guido Haefeli VeLo Comprehensive Review 27/28 January 2003.
COGGING MEETING Cogging Semi-Fine Adjust without collisions? Fine Adjust When? Cogging Meeting – Sophie BARON.
January 31, MICE DAQ MICE and ISIS Introduction MICE Detector Front End Electronics Software and MICE DAQ Architecture MICE Triggers Status and Schedule.
Update on final LAV front-end M. Raggi, T. Spadaro, P. Valente & G. Corradi, C. Paglia, D. Tagnani.
Beam Line BPM Filter Module Nathan Eddy May 31, 2005.
PSD upgrade: concept and plans - Why the PSD upgrade is necessary? - Concept and status of the PSD temperature control - Concept of the PSD analog part.
Real time performance estimates of the LHC BPM and BLM system SL/BI.
Bunch by bunch feedback systems for KEKB Makoto Tobiyama KEK Accelerator Laboratory.
1 Calorimeters LED control LHCb CALO meeting Anatoli Konoplyannikov /ITEP/ Status of the calorimeters LV power supply and ECS control Status of.
Status of the PSD upgrade - Problems with PSD in Be runs - Modification of cooling system - New temperature control - Upgrade of HV control system - MAPD.
A Super-TFC for a Super-LHCb (II) 1. S-TFC on xTCA – Mapping TFC on Marseille hardware 2. ECS+TFC relay in FE Interface 3. Protocol and commands for FE/BE.
CERN LECC 2006, September, Valencia, Spain Acknowledgements: Eva Calvo Giraldo, AB/BI Rhodri Jones, AB/BI Greg Kasprowicz, AB/BI Thilo Pauly, ATLAS.
PhD Student, Federico Alessio Directeur de thèse, Renaud Le Gac Superviseur de thèse, Richard Jacobsson, CERN Beam and Background Monitoring and the Upgrade.
1 Electronics Status Trigger and DAQ run successfully in RUN2006 for the first time Trigger communication to DRS boards via trigger bus Trigger firmware.
CHIPP meeting Appenberg, 24 Aug 2009 Preparation for LHC beam, Jeroen van Tilburg 1/15 Jeroen van Tilburg (Universität Zürich) LHCb: Preparation for LHC.
Time and amplitude calibration of the Baikal-GVD neutrino telescope Vladimir Aynutdinov, Bair Shaybonov for Baikal collaboration S Vladimir Aynutdinov,
Luminosity Monitor Design MICE Collaboration Meeting 31 May 2009 Paul Soler.
VME64x Digital Acquisition Board (TRIUMF-DAB) Designed to handle 2 channels of 12-bit 40MHz Data Will be used for both the LTI & LHC beam position system.
Bunch Numbering P. Baudrenghien AB/RF for the LHC/RF team.
Status of the PSD upgrade - Status of the PSD cooling and temperature stabilization system - MAPD gain monitoring system - PSD readout upgrade F.Guber,
PSD upgrade: concept and plans - Why the PSD upgrade is necessary? - Concept of the PSD temperature stabilization and control - Upgrade of HV control system.
Filling Schemes for the 2010 Heavy Ion Run Updated (3 rd iteration) version of BCWG presentation initially on 28 September, updated after discussions with.
18/05/2000Richard Jacobsson1 - Readout Supervisor - Outline Readout Supervisor role and design philosophy Trigger distribution Throttling and buffer control.
Tracking at the Fermilab Test Beam Facility Matthew Jones, Lorenzo Uplegger April 29 th Infieri Workshop.
Beam time structures 1 At any particular instance of time there will be only one kind of beam in the MI. It will be either protons or anti-protons. The.
VMM Update Front End ASIC for the ATLAS Muon Upgrade V. Polychronakos BNL RD51 - V. Polychronakos, BNL10/15/131.
Rutherford Appleton Laboratory September 1999Fifth Workshop on Electronics for LHC Presented by S. Quinton.
1 Timing of the calorimeter monitoring signals 1.Introduction 2.LED trigger signal timing * propagation delay of the broadcast calibration command * calibration.
RF Commissioning D. Jacquet and M. Gruwé. November 8 th 2007D. Jacquet and M. Gruwé2 RF systems in a few words (I) A transverse dampers system ACCELERATING.
Trigger system for setup 2016 V. Rogov, V. Yurevich,D.Bogoslovski, S.Sergeev, O.Batenkov* LHEP JINR *V. G. Khlopin Radium Institute, St. Petersburg.
BRAN at IR2 and IR8: status, commissioning and operation Enrico Bravin AB-BI Joint LHC Machine-Experiments Workshop on Very Forward Detectors 25 January.
The LHCb Online Framework for Global Operational Control and Experiment Protection F. Alessio, R. Jacobsson, CERN, Switzerland S. Schleich, TU Dortmund,
Bunch by bunch feedback systems for KEKB Makoto Tobiyama KEK Accelerator Laboratory.
Results achieved so far to improve the RPC rate capability
Injectors BLM system: PS Ring installation at EYETS
Status of the Beam Phase and Intensity Monitor for LHCb
Luminosity Monitor Status
Summary: Workshop on CMS Beam Conditions, Radiation Monitoring and Luminosity Systems Oliver Stein, May 2013, CERN.
Update on ALICE-LHC interfaces & BCM
The digital read-out for the CSC system of the TOTEM experiment at LHC
BESIII EMC electronics
Limits on damping times
The digital read-out for the CSC system of the TOTEM experiment at LHC
Commissioning of the Beam Conditions Monitor of the LHCb Experiment at CERN Ch. Ilgner, October 23, 2008 on behalf of the LHCb BCM group at TU Dortmund:
The LHCb Front-end Electronics System Status and Future Development
Beam instrumentation and background monitoring
Beam Phase and Intensity Monitor for LHCb
Presentation transcript:

An LHCb general-purpose acquisition board for beam and background monitoring at the LHC F. Alessio, R. Jacobsson, CERN, Switzerland Z. Guzik, IPJ Swierk, Poland Topical Workshop on Electronics for Particle Physics Aachen, Germany, 24 September 2010

TWEPP2010, Aachen, Germany, 24/09/10 F. Alessio, CERN Intro: Beam and Background LHCb 2 Complete study framework which involves:  Background monitoring Beam Condition Monitor Metal-foil based Radiation Monitoring System Active Radiation Monitors Beam Loss Scintillator VELO/PUS SPD  Beam monitoring VELO/PUS (and indirectly also the others above) Beam Phase and Intensity Monitor

TWEPP2010, Aachen, Germany, 24/09/10 F. Alessio, CERN LHCb BPIM-BPTX system It is of extreme importance that the phase of the LHC clock remains stable with respect to the bunch arrival times at the location of the LHCb detector Monitoring performed using two Beam Pick-Up Timing Experiments (BPTXs) dedicated to LHCb and located along the LHC ring: formed by 4 electrostatic button electrodes producing a bipolar signal which is the representation of the beam (bunch-by-bunch) inside the beam pipe 3

TWEPP2010, Aachen, Germany, 24/09/10 F. Alessio, CERN LHCb BLS system Scintillator 3x4x4 cm 3 wrapped in TYVEK PMT1HM R ”diam, multi-mesh PMT2EMI 9839A 2”diam, pan-type LEDred-light, fast Shielded against stray magnetic field  Installed in front of LHCb VeLo on the horizontal plane of the beam pipe: ~12cm away from beam pipe  Very inexpensive detector (non rad-hard) 4

TWEPP2010, Aachen, Germany, 24/09/10 F. Alessio, CERN LHCb BLS system  Pulses from both scintillators with real pilot beam injected through LHCb: width of ~2 clock cycles 10-15ns rise time Train of bunches injected (and stopped before going through LHCb) at a spacing of 25ns (test on June 2009)  5

TWEPP2010, Aachen, Germany, 24/09/10 F. Alessio, CERN BPIM-BPTX Beam intensity: independent LHCb measurement of total beam intensity and bunch-by-bunch intensity to be used for offline analysis and luminosity correction Bunch structure: so-called LHC filling scheme Beam phase with respect to sampling clock edge: keep the LHCb detector within +/- 0.5ns from optimal sampling point BLS: Beam losses: Losses during injection: LHCb under the fire of showers at injection Losses during circulating beams: beam Halo, fast losses due to scraping, losses due to beam movements, increasing background, beam-beam effects, etc... Abort gap monitoring: look for ghost bunches, beam debunching due to RF, wrong filled bunches LHCb independent luminosity measurement: cross-check with official LHCb luminosities measurement (from L0CALO trigger rate) and substitute LHCb official measurement whenever not available (detector not running or not ready during collisions). Bunch by bunch luminosity. Both: Live feedbacks to LHCb control room and LHC control room for shifters: automation, alarms, archiving! Beam and Background LHCb 6 General purpose custom-made electronics LHCb board

TWEPP2010, Aachen, Germany, 24/09/10 F. Alessio, CERN  Initial spec: custom-made acquisition board 6U VME. LHC orbit and bunch clock inputs. Online analysis of a bipolar pulse: FWHM 1 ns at 40 MHz, ±5Vmax processing amplitude (onboard attenuator for higher pulses) Measure time between bunch arrivals and LHC bunch clock locally Bunch-by-bunch for a full LHC turn filled in FIFO Triggered via controls interface <100 ps precision and averaging phase as a function of bunch crossing (TDC-GPX, 27ps) Measure continuously bunch intensities bunch-by-bunch 12-bit resolution by integrating pulse per bunch (pipelined ADC) Output intensity on front-panel at 40 MHz (8/4-bit resolution) Triggered via controls interface, fill in FIFO with intensities for full turn Intensity per bunch as a function of bunch crossing Readout and control via Experiment Control System, CCPC based interface (VME alternatively). Glue logic for interfacing protocols. Interfaced directly to LHCb Timing and Fast Control system, 3 outputs Data processing on FPGA (ALTERA EP20K200, with 8000 LEs), two 16bx16b FIFOs for storage, EEPROM for firmware storage and load Initially only developed for BPTX system A common electronics board: “BPIM” 7

TWEPP2010, Aachen, Germany, 24/09/10 F. Alessio, CERN  September 2006, first conceptual presentation by R. Jacobsson at 12 th LECC in Valencia: PSPICE simulations, first PCB draft  February 2007, first PCB produced, mounting started, lots of debugging and fixing in first prototype  May 2007, second prototype produced and mounted, tests in lab  September 2007, tests in SPS as readout board on a real BPTX:  January 2008, production of a batch of 8 boards  September 2008, BPIM sees first beam reading out first BPTX pulse Some adaptation neede because performances of BPTX different from signal generator  January 2009, 3 BPIMs go to ALICE (waiting for beam...)  July 2009, 2 BPIMs installed in BLS readout (waiting for beam...)  October 2009, all BPIMs see beam again  May 2010, commissioning with LHCb detector, LHCb timing adjusted, BLS was first detector to signal 3.5 TeV collisions in point 8  Continuous monitoring and analysis of data BPIM timeline 8

TWEPP2010, Aachen, Germany, 24/09/10 F. Alessio, CERN General overview of the board 6 logical blocks: - Intensity measurement chain - Phase measurement chain - Clock distribution - Digital processing and data accumulation - I/O interfaces - Board control via ECS 9

TWEPP2010, Aachen, Germany, 24/09/10 F. Alessio, CERN In depth: analog chain Analog chain for the intensity measurement, involving current amplifiers, buffers and integrator Very fast current amplifier used for the inverters stages  slew rate 10 V/ns (THS3201D, BW 1.8GHz) Very careful layout 10

TWEPP2010, Aachen, Germany, 24/09/10 F. Alessio, CERN Performances with real LHC beam 1. Keeping the LHCb experiment on time …  LHCb experienced a drift of about 2.3ns over a period of about 1 month (March – May 2010) Phase of the sampling clock edge drifted because of temperature drift (via fibres)  Same drift was observed by two detectors in LHCb equipped with TDCs (Outer Tracker and MUONs stations) Commissioning phase of BPIM and calibration with LHCb detectors Realignment of the phase 11  For LHCb a positive shift (+) corresponds to a delay of the clock edge with respect to the beam passage the beam is earlier with respect to our optimal sampling point

TWEPP2010, Aachen, Germany, 24/09/10 F. Alessio, CERN Performances with real LHC beam  LHC Fill 1222 Temperature drifted by 8 °C in 5 hours Beam1 and beam2 clock phase shifted by ~100ps  90 days running period Temperature drifted by 15 °C Clock edge phases drifted by ~4.5ns Average of 260ps/deg over the 13km of fibres from RF4 to LHCb 12

TWEPP2010, Aachen, Germany, 24/09/10 F. Alessio, CERN Performances with real LHC beam 2. Resolution of phase measurement …  Data taken from a stable period (no drift was observed) in LHC Fill ps resolution for single bunch phase measurement 17ps resolution for deltaT measurement (not taking into account uncertainties on cable lengths, compatible with statistical error) 13

TWEPP2010, Aachen, Germany, 24/09/10 F. Alessio, CERN Performances with real LHC beam 3. Dependance on beam intensity …  Strong non-linearities Correction curves, difficult to reproduce (only few cases). Need more system calibration! 14 Intensity resolution: (data taken from LHC Fill 1250)  For BPIM01: 1 ADC = * 10^8 ppb  For BPIM02: 1 ADC = * 10^8 ppb Due to baseline subtraction (~20ADC counts above baseline), the minimum intensity measurable by the system is ~4*10^9 ppb. Reflections in the cables when high intensity beam: raise threshold above baseline

TWEPP2010, Aachen, Germany, 24/09/10 F. Alessio, CERN Performances with real LHC beam 4. Commissioning of the injection transfer lines and TDI settings …  Possible to “calibrate” the position of the collimators with “desired” losses  Whole range of losses is covered by BLS and BCM BLS more sensitive than BCM BLS saturates at 10% of threshold BCM 15

TWEPP2010, Aachen, Germany, 24/09/10 F. Alessio, CERN Performances with real LHC beam 5. Luminosity measurements…  Different behaviour according to different machine modes losses to be studied systematically and accurately  Need more calibration: scintillators are already ageing because non rad-hard, source of background are well described by simulation and in agreement, translate ADC in # of MIPs. 16

TWEPP2010, Aachen, Germany, 24/09/10 F. Alessio, CERN BPIM in ALICE  Ready for Ion runs in ALICE: extremely important to have the system ready since day 1  The boards have proven to be working in a radiation environment without being affected by it  “Bunch masking” Coincidence of two BPIMs (per beam) == collisions Part of the “ALICE SMAQ” plot (0BPA and 0BPB): quickest trigger in ALICE!  Modification in order to see also pilot bunches Amplification modified by factor ~4  Efficiency 100%: never missed a trigger! 17

TWEPP2010, Aachen, Germany, 24/09/10 F. Alessio, CERN Control, monitoring and data presentation  Based on Credit Card-sized PC with Ethernet running a strip- down version of Linux Access board resource via PCI bus converted to native hardware busses by glue logic Server based on the same generic protocol on top of DIM allows the PVSS- based control system to configure and monitor the electronics  System allow for generic subscription to monitoring information for continuous archiving and permanent display in the LHCb control room 18

TWEPP2010, Aachen, Germany, 24/09/10 F. Alessio, CERN Control, monitoring and data presentation 19

TWEPP2010, Aachen, Germany, 24/09/10 F. Alessio, CERN Conclusions  LHCb has developed, produced and put in operation an extremely flexible, reliable and automated multi-purpose high performance acquisition board  Proven its great performance with first real LHC beam First resource in LHCb for monitoring timing First resource in LHCb for monitoring LHC filling scheme and possible ghost bunches First resource in LHCb for bunch-by-bunch dedicated measurements (intensity, phase, instantaneous and specific luminosity per bunch) Readout card for a LHCb scintillators system dedicated to beam and background monitoring Part of the ALICE trigger chain  Future plans: Make a second production batch Expand BLS with more scintillators (rad-hard) Finally put a front panel... 20