Content Overview Objectives OIA Technology Needs & Requirements

Slides:



Advertisements
Similar presentations
1. 2 August Recommendation 9.1 of the Strategic Information Technology Advisory Committee (SITAC) report initiated the effort to create an Administrative.
Advertisements

Program Management Office (PMO) Design
Roadmap for Sourcing Decision Review Board (DRB)
State of Indiana Business One Stop (BOS) Program Roadmap Updated June 6, 2013 RFI ATTACHMENT D.
Test Automation Success: Choosing the Right People & Process
November 19, 2013 Preparing a Successful RFP to get Desired Results.
Robert D. Walla, Larry A. Hacker, Ph.D. Astrix Technology Group 1090 King Georges Post Rd Edison, NJ LIMS Selection In A Forensic Toxicology Laboratory.
Software Engineering Institute Carnegie Mellon University Pittsburgh, PA Sponsored by the U.S. Department of Defense © 1998 by Carnegie Mellon.
ECM RFP 101 Presented by: Carol Mitchell C.M. Mitchell Consulting.
Sarbanes-Oxley Compliance Process Automation
Panorama Consulting Group LLC ERP Assessment, Selection, and Planning SAMPLE APPROACH.
Pertemuan Matakuliah: A0214/Audit Sistem Informasi Tahun: 2007.
Michael S. Zachowski, Robert D. Walla Astrix Technology Group 1090 King Georges Post Rd Edison, NJ A Successful Approach to a LIMS Upgrade In A Public.
Procurement Transformation State of North Carolina
Chapter 3 Project Initiation. The stages of a project  Project concept  Project proposal request  Project proposal  Project green light  Project.
SDLC Phase 2: Selection Dania Bilal IS 582 Spring 2009.
Enterprise Architecture
Conducting the IT Audit
Internal Auditing and Outsourcing
What is Business Analysis Planning & Monitoring?
S/W Project Management
CHAPTER 5 Infrastructure Components PART I. 2 ESGD5125 SEM II 2009/2010 Dr. Samy Abu Naser 2 Learning Objectives: To discuss: The need for SQA procedures.
BTS730 Communications Management Chapter 10, Information Technology Management, 5ed.
1 Our Expertise and Commitment – Driving your Success An Introduction to Transformation Offering November 18, 2013 Offices in Boston, New York and Northern.
Supporting tools in an IT Project & Portfolio Management environment Ann Van Belle -
Moving into Design SYSTEMS ANALYSIS AND DESIGN, 6 TH EDITION DENNIS, WIXOM, AND ROTH © 2015 JOHN WILEY & SONS. ALL RIGHTS RESERVED. 1 Roberta M. Roth.
Enterprise Product Implementation Process. Components of a Successful Implementation  A detailed Scope Document for customer review and signoff  Creation.
 2008, The Code Works, Inc., The Non-Technical Buyer’s Guide to Staffing Software 111 North Market Street Suite 888 | San Jose, CA | TEL:
Do it pro bono. Strategic Scorecard Service Grant The Strategy Management Practice is presented by Wells Fargo. The design of the Strategic Scorecard Service.
Campaign Readiness Project Overview Enabling a structured, scalable approach to customer-centric campaigns.
Demystifying the Business Analysis Body of Knowledge Central Iowa IIBA Chapter December 7, 2005.
ITX TCM Project Proposal SWEN670. Meet Team: “iTX TCM” Name: Eric Everson Angie Chock Thomas Andersen Thomas Stewart Role: Team Lead/PM Documentation.
State of Maine NASACT Presentation “Using the Business Case to Guide a Transformation Procurement” 1 Using the Business Case to Guide a Transformation.
EARTO – working group on quality issues – 2 nd session Anneli Karttunen, Quality Manager VTT Technical Research Centre of Finland This presentation.
Marina Signore Head of Service “Audit for Quality Istat Assessing Quality through Auditing and Self-Assessment Signore M., Carbini R., D’Orazio M., Brancato.
GBA IT Project Management Final Project - Establishment of a Project Management Management Office 10 July, 2003.
Module N° 8 – SSP implementation plan. SSP – A structured approach Module 2 Basic safety management concepts Module 2 Basic safety management concepts.
December 14, 2011/Office of the NIH CIO Operational Analysis – What Does It Mean To The Project Manager? NIH Project Management Community of Excellence.
CERTIFICATION In the Electronics Recycling Industry © 2007 IAER Web Site - -
© 2006 Cisco Systems, Inc. All rights reserved.Cisco Public 1 Version 4.0 Gathering Network Requirements Designing and Supporting Computer Networks – Chapter.
What is a Business Analyst? A Business Analyst is someone who works as a liaison among stakeholders in order to elicit, analyze, communicate and validate.
Product Documentation Chapter 5. Required Medical Device Documentation  Business proposal  Product specification  Design specification  Software.
Presented by: Masoud Shams Ahmadi February 2007 Enterprise Resource Planning (ERP) Selection Presented by: Masoud Shams Ahmadi
PUBLIC PURCHASING IN FLORIDA ROLES IN THE PURCHASING PROCESS (rev. 05/27/2008)
AREVA T&D Security Focus Group - 09/14/091 Security Focus Group A Vendor & Customer Collaboration EMS Users Conference September 14, 2009 Rich White AREVA.
1 Designing Effective Programs: –Introduction to Program Design Steps –Organizational Strategic Planning –Approaches and Models –Evaluation, scheduling,
TBPC Brown Bag Presentation Texas State Government
Circuit Rider Training Program (CRTP) Circuit Rider Professional Association Annual General Meeting and Conference August 30, 2012.
Project Kick-off Meeting Presented By: > > > > Office of the Chief Information Officer.
Solutions Within Reach
Evaluate Phase Pertemuan Matakuliah: A0774/Information Technology Capital Budgeting Tahun: 2009.
Proposed Preliminary Statewide Full Service Partnership Classification System BASED ON STAKEHOLDER FEEDBACK THIS REPORT IS THE MENTAL HEALTH SERVICES OVERSIGHT.
Company: Cincinnati Insurance Company Position: IT Governance Risk & Compliance Service Manager Location: Fairfield, OH About the Company : The Cincinnati.
U.S. Department of Agriculture eGovernment Program eDeployment Kickoff August 26, 2003.
CYSSC - Cluster 2.0 Partner Management Final Deliverable High Sensitivity Sep 2, 2011 Cluster 2.0 Project Team.
Company LOGO. Company LOGO PE, PMP, PgMP, PME, MCT, PRINCE2 Practitioner.
6/6/ SOFTWARE LIFE CYCLE OVERVIEW Professor Ron Kenett Tel Aviv University School of Engineering.
ICAJ/PAB - Improving Compliance with International Standards on Auditing Planning an audit of financial statements 19 July 2014.
Preparing & Evaluating RFPs The PMO Role Kim Brain Senior Project Manager, Brain Works Consulting, LLC.
CMMI Certification - By Global Certification Consultancy.
AUDIT STAFF TRAINING WORKSHOP 13 TH – 14 TH NOVEMBER 2014, HILTON HOTEL NAIROBI AUDIT PLANNING 1.
Sourcing Evaluation Life Cycle Go/No Go decision points Competition Alignment Discovery Con tract Modification Project Initiation Vendor Capabilities Contract.
BANKING INFORMATION SYSTEMS
Software Configuration Management
2 Selecting a Healthcare Information System.
Description of Revision
By Jeff Burklo, Director
X-DIS/XBRL Phase 2 Kick-Off
{Project Name} Organizational Chart, Roles and Responsibilities
Presentation transcript:

OIA Tools & Technology Evaluation Methodology Prepared for State of Ohio, Office of Budget & Management Deloitte Consulting April 18, 2008

Content Overview Objectives OIA Technology Needs & Requirements Current Vendor & Tools Landscape Software Selection Methodology Next Steps

Objectives Identify high level Office of Internal Audit (OIA) business needs, and technical and functional requirements for software tools Perform high level review of existing software tools and functionality related to the OIA’s needs and requirements Develop a software evaluation methodology, to include a criteria evaluation approach that could be used in drafting a Request for Information (RFI) to software vendors

OIA Technology Needs & Requirements

Current Needs & Requirements Per discussion with key stakeholders within OBM, OIT, and the HB166 Advisory Committee, the following high level business and technology needs and requirements were identified for OIA: Needs: Tools to support the management of OIA, to include time reporting, accountability, reporting and billing Tools to support the management, maintenance, and retention of audit workpapers Tools to support the risk assessment and audit universe maintenance function Tools to organize and drive governance, risk, and compliance initiatives (e.g. CSA’s by IT Departments) Tools to support the auditing of key financial and operational controls for critical application systems Process mapping capabilities for documentation and education purposes Continuous and automated monitoring of controls Requirements: Solutions must be able to support a large and distributed workforce (approx 125 auditors in various locations w/ remote capability (web-based), custom reporting, & centralized QA monitoring needs) Solutions must be cost effective Solutions would benefit by incorporating existing OIA tools and technology (e.g. Sharepoint, web architecture, etc.) Solutions must have adequate security measures to safeguard audit evidence Web-based for customer usage (e.g. comment tracking) and improved transparency for the public (e.g. final reports) Facilitates record retention requirements & timely public record requests Software vendor must have stability & provide adequate training/support

Current Vendor & Tools Landscape

Current Situation Analysis Internal audit departments have growing pressure for increased oversight and assurance With mounting pressure and increased workloads, internal audits are overwhelmed with manual and decentralized processes Organizations are now looking to reduce the cost and improve efficiency associated with their internal audit departments Focus has shifted from reliance on “error-prone” manual controls to automating and monitoring the execution of those controls Interim solutions provide adequate controls repository functionality but offer little in improving the approach Tools are able to assist with enterprise wide risk assessment, compliance, planning, scheduling, control automation, control monitoring, review, report generation, trend analysis, and storage. Flexibility of the software allows OIA to customize and scale the tool according to their business or changes in IT infrastructure and platforms Tools help assess various risks (financial, environmental, health & safety, IS) under a consistent risk methodology

Decisions to Consider Organizations are assessing the value/cost of implementing a tools solution to help with internal audit processes Focus on a broader Governance, Risk and Compliance (GRC) program Understand your current process & issues and focus on improvement Timing, cost and level of effort to implement, to include initial and ongoing training needs, software licensing, and maintenance How best to enhance the existing audit program into a more sustainable, repeatable process Improve documentation version control Consider self-assessment procedures Improve efficiency of the process (i.e. workflow) Enhance reporting features to improve effectiveness Understanding the vendor landscape for the next generation of audit technologies Find the tool that best fits your needs GRC is the “hot” label today Many boutique vendors in this space today to address cost concerns and unique needs

Software Vendors In the past, there was a clear definition between Internal Audit software and GRC software for controls auditing. Presently, these competencies are merging in new releases of software products from numerous vendors Internal Audit Software Focus on audit procedures and maintenance Workpaper creation and maintenance, management signoff, audit planning and scheduling, audit budget Centralized data repository, online checkout functionality, best practice/knowledgebase repository Compliance with SOX GRC Software Focus on governance, risk, and compliance initiatives Policy management, incident management, asset management Risk assessment, threat management, risk dashboards Internal audit components incorporated

Market Trend – Internal Auditor Software Survey Survey respondents: 21% Government industry Majority of respondents from small audit shops (reason for Excel’s stronghold) Large departments rely on specialty products (TeamMate, AutoAudit) Software related concerns noted: #1 – Ability to find software that meets the department’s specific needs #2 – Cost Source: Grey, Glen. “An Array of Technology Tools.” Internal Auditor August 2006: 56-62.

Market Trend – Internal Auditor Software Survey Among companies who use a risk management analysis tool (beyond Excel), TeamMate (6%) and AutoAudit (3%) showed largest market share. 70% of Government agencies use audit management and risk management software tools Source: Grey, Glen. “An Array of Technology Tools.” Internal Auditor August 2006: 56-62. 10

Software Selection Methodology

Selection Methodology A three phased approach is recommended for effectively selecting a software solution: Phase I Planning and Requirements Definition Phase I will begin by defining the scope for OBM’s tool selection process, to include business needs and requirements and setting a timeline for the process. Next, an extensive list of requirements will be reviewed and weighted according to the specific needs of OIA. A preliminary list of potential vendors will be gathered. Phase II Request for Proposal Development and Execution During this phase of the selection process, the project team will take the information learned during phase I and trim the vendor list to only the most viable candidates. A request for information (RFI) will be sent to each vendor, responses will be compiled and analyzed and a demo list of 2-3 vendors will be created. Phase II will be completed by facilitating the vendor demonstration process, scoring and compiling of results. Phase III Final Analysis and Recommendation During the final phase of the selection process, the project team finalizes the selection process, presents the compliance system recommendation to executive management and facilitates next steps toward solution implementation.

Sample Timeline / Milestones

Selection Process – Phase I Tasks Initiate Project and Establish Team Roles and Responsibilities Establish project objectives, scope, priorities, and determine key milestones. Assist OIA in identifying project team members, formalize team structure and reporting responsibilities, and develop detailed project work plan. Identify Unique Functional and Technical Requirements Develop the unique business and system requirements for the software tools. These requirements will be used in Phase II as a basis for determining which tool provides OIA the best fit to their requirements. Establish Critical Success Factors Meetings focused on communicating and affirming issues and critical success factors, understanding specific project expectations, and identifying how these will impact OIA’s organization and the selection project. Functional and technical requirements coupled with the critical success factors will serve as a detailed checklist to guide and facilitate vendor demonstrations. Tool Selection Process Phase III Final Analysis and Recommendation Phase II Request for Proposal Development and Execution Phase I Planning and Requirements Definition Key Deliverables Detailed Project Work Plan Defined and Weighted Functional and Technical Requirements List

Requirements Weight business and technical requirements according to OIA’s needs

Selection Process – Phase II Tasks Develop Short List of Vendor Candidates Gather knowledge within the marketplace to identify a short list of 4-5 potential candidates. Phase III Final Analysis and Recommendation Phase I Planning and Requirements Definition Tool Selection Process Phase II Request for Proposal Development and Execution Develop RFI/Scorecard and Solicit Vendor Bids The Request for Information (RFI) will require each vendor to provide a sample implementation schedule, pricing, warranty, references and other pertinent guidelines for the bidders to follow. OIA to populate the vendor scorecard. Vendors will be contacted and bids solicited from them. Facilitate Comparative Analysis of RFI Responses Review requirements and institute a ranking system to evaluate the vendor proposals. Collect vendor RFI responses and prepare a comparative analysis report. Utilize comparative analysis report to further condense candidate list to 2-3 vendors for demonstration. Facilitate Vendor Demonstration Sessions Invite top candidates to OIA to present their system and to answer/clarify specific questions related to their RFI response. Develop demo scripts to evaluate vendors Key Deliverables Short List of Vendor Candidates Request for Information (RFI) Vendor Scorecard Comparative Analysis Report

Request for Information Sections: Company (OIA) background and overview, description of desired solution, benefits sought Response directions - OIA contact information, response due date, target demo dates Vendor information – company profile and tool, including financial solvency & market share Requirements – customized questions according to OIA requirements, response from vendor limited to 500 characters. Customer references – list of customers of similar size/requirements Disclaimer – RFI solely for informational and planning purposes

Selection Process – Phase III Tasks Facilitate Vendor Reference Checks Utilize a customized questionnaire to evaluate each vendor’s performance at comparable clients. The questionnaire will be customized to OIA’s specific requirements and interests. Prepare Final Selection & Recommendation Report The project team will work together to put the finishing touches on the selection report. Provide guidance for executive-level presentation. Select the Best Internal Audit Tool (or Tools) Conduct a detailed review session to reach agreement that OIA’s requirements are met by the chosen vendors and solutions. Finalize Selection & Recommendation Report Provide recommendation report template for OIA to complete and present. Support OIA in Vendor Contract Negotiations Present OIA with applicable rate and licensing information based on existing vendor relationships. Phase II Request for Proposal Development and Execution Phase I Planning and Requirements Definition Tool Selection Process Phase III Final Analysis and Recommendation Key Deliverables Reference Check Summary Final Business Case Sample System Requirements