Water Services Trust Fund The Urban Projects Concept (UPC) Implementation Workshop for WSPs and the Field Monitors Training Workshop Engineering Options.

Slides:



Advertisements
Similar presentations
Water Distribution Systems – Part 1
Advertisements

Assessing Capacity Through Sanitary Surveys. SDWA §1420 Capacity Development ~To receive their full Drinking Water State Revolving Fund allotment, States.
Watershed Approaches and Community Based Planning
How to Hit a Homerun Saving Energy and Updating Facilities Presented by Shirley McNutt.
TRAINING SOLUTIONS P R S M A R T. 2 WE PROVIDE TURNKEY TECHNICAL TRAINING SOLUTIONS Prosmart offers state of the art turnkey solutions for technical training.
Monroe L. Weber-Shirk S chool of Civil and Environmental Engineering Water Supply Engineers without Frontiers.
Water Services Trust Fund UBSUP & SafiSan Key Characteristics and Procedures Prepared by the UBSUP Team September UBSUP, SafiSan, plot & household.
Water Services Trust Fund Up-scaling Basic Sanitation for the Urban Poor Programme What is the SafiSan Project? 7/6/20151.
CE HYDRAULICS ENGINEERING
Water Services Trust Fund Training Workshop for Field Monitors Team Hierarchy, Communication within the Field Monitors Team & Communication with the WSTF.
Monitoring and Evaluation in Humanitarian Aid: Quality Procedures PROJECT – STRAND 1 – Training and Capacity Building.
Water Services Trust Fund The Urban Projects Concept (UPC) Fast-tracking & up scaling provision of water and sanitation services to the urban poor Eng.
Water Services Trust Fund The Urban Projects Concept (UPC) & Support Provided by the German Development Bank (KfW) Tuesday 18 th June 2013 Eng. Jacqueline.
Italian Ministry for the Environment, Land and Sea National Workshop: Developing Environmental Infrastructure Projects in the Waste Sector in Serbia Case.
Water Services Trust Fund Social Animators & Field Monitors Training Workshop The Water Services Trust Fund: Functions, Mandate, Urban Window, WSTF Support,
1 Framework Programme 7 Guide for Applicants
AASHTO Subcommittee on Construction 2010 Annual Meeting Summary of C&T Section Work Plan Surveys August 16–20, 2010 Summary of C&T Section Work Plan Surveys.
Lecture 1 Water Distribution Systems
Version 4.0. Objectives Describe how networks impact our daily lives. Describe the role of data networking in the human network. Identify the key components.
① Computer aided design (CAD) It have been associated with computer system design with the development of the concept of computer-graphics but the concept.
Water Services Trust Fund The Urban Projects Concept (UPC) Implementation Workshop Role and Responsibilities of Field Monitors David Njue, Investment.
WSNTG Annual Conference 8 th September 2005 WSNTG 9 th Annual Conference “Water Services Strategic Plans – Fact or Fiction”
Water Services Trust Fund Financial Support for Improved Access to Water and Sanitation Implementation of UPC Projects 1.
Mozambique Population: 20,530,714 habitants FIPAG : Assets Holding and Investment Fund Created in 1998 Responsible for 14 Urban Utilities managed by two.
Prepared by the UBSUP Team Phases Approach of the UBSUP Programme & SafiSan Projects Other Subsequent Phases Phase 2 Phase 1.
Water Services Trust Fund (WSTF) UBSUP & SafiSan Key Characteristics and Procedures Prepared by the UBSUP Team September UBSUP, SafiSan, plot &
Session 3: Project Development Agenda The Voice of a Technologist Utility Project Development Reliability Concepts Residential Project Development Homework.
BASICS IN IRRIGATION ENGINEERING 2.1. Planning Irrigation systems 2.2. soil-plant-water relation – over view 2.3. Crop water requirement 2.4. Base, delta.
Network Appurtenances Major operations within a water transport and distribution systems are: 1. Transmission. 2. Storage. 3. Pumping.
Active Transport Forum 15 th February 2007 Nick Bryan Transport Policy Analyst.
Institutionalizing Drinking Water Security: Making the Issues Real for Small System Capacity Development Joy Barrett Rural Community Assistance Partnership.
Annual Conference October 2011 Water Services Training Group 15 th Annual Conference Water Services in Ireland – Organisational modernisation and new challenges.
Flow Margin Assumptions for NTS Planning and Development Transmission Planning Code Workshop 3 5 th June 2008.
CIS meeting Budapest 3-4 July 2013 Christophe Duhamel the Global Strategy to Improve Rural and Agricultural Statistics 3 components of the plan.
Organization Name Presenter Name Presenter Title.
1 On-Farm Irrigation Project, Credit No KG On-Farm Irrigation Project, Credit No KG Presentation: On-Farm Irrigation Project Prepared by N.A.
Water Services Trust Fund Financial Support for Improved Access to Water and Sanitation Planning & Presence Operation of water supply schemes for the urban.
Water Services Trust Fund A presentation for Water Services Boards and Water Service Providers Eng. John Orwa 1  Support provided by the WSTF  Expectations.
Water Services Trust Fund Reaching the urban poor Water Services Trust Fund (WSTF) is a poverty – oriented basket fund Projects devloped in rural areas.
Aggregate Planning Intermediate-range capacity planning that typically covers a time horizon of 2~12 months – may extend to as much as 18 months. Product.
Chapter 9 Delivery ©McGraw-Hill Education. All rights reserved.
Water Services Trust Fund Official Signing of the 2 nd Call for Proposals Contracts Tuesday 30 th March, 2010 WSTF-Funded Projects: WSTF Support, Expectations.
Role of Consultants in Developing Sustainable Projects Pooja Kapoor Head (Business Development)
Components of Water Networks Eng. Mona Al-Gharbawi Eng. Ayman Al-Afifi
Review Group -140 Thoughts on additional information requirements.
UBSUP & SafiSan: Key Characteristics Prepared by the UBSUP Team 1 UBSUP, SafiSan, plot & household level sanitation, demand-driven approach, UDDTs, the.
Layout of the Front-End Test Stand Ajit Kurup UK Neutrino Factory Meeting 12 th January 2005.
Sufficiently Complex Connection Involving Pipeline Construction and/or System Reinforcement Project Sequence.
Default price-quality paths for gas pipeline services Briefing on the Commission’s final decision for financial market analysts 28 February 2013.
1 DIRECTORATE-GENERAL FOR ENERGY AND TRANSPORT Digital Tachograph : Information Seminar Budapest, 25-26/02/20009 Digitac.
Integrated policy frameworks
Lecture (11): Water Distribution Systems
Water Services Trust Fund Field Monitors Training Workshop
Common Learning Blocks
Construction of Schools in Missan and Thi-Qar
MERITS & DEMERITS OF CREDIT SALES. WORKSHOP ON SALES MANAGEMENTS.
Water Services Trust Fund Financial Support for Improved Access to Water and Sanitation Implementation of UPC Projects & the Roles and Responsibilities.
OUTCOME MEASUREMENT TRAINING
Traceability of Gas Pipeline Materials Research & Materials Manager
How can metros and municipalities operate to ensure that revenue generated from electricity sales is sustainable? by Dr Minnesh Bipath and Dr Willie de.
Water Services Trust Fund
ASSET DEVELOPMENT APRIL 2006
ديبــــاجــــــة: صادق الكنيست الإسرائيلي في تاريخ على اقتراح قانون دائرة أراضي إسرائيل (تعديل رقم7) – 2009 الذي يشكّل، عمليًا، خطة إصلاح شاملة.
Lector (Professor): Dr. Ir. Richard P. van Leeuwen
Johnny François Regional Office Manager, Les Cayes
EASTERN CAPE HOUSING DELIVERY
CYnergy Kick-Off Meeting
Next Steps for the NGEC Specification Development
Water Services Trust Fund Training Workshop for Field Monitors Role of Field Monitors within the Project Task Team Sheillah Karimi (2009, updated in.
Who needs to be engaged? And why?
Presentation transcript:

Water Services Trust Fund The Urban Projects Concept (UPC) Implementation Workshop for WSPs and the Field Monitors Training Workshop Engineering Options 1

Defining the Project Approach &Components Technical Approach (in context of the Objectives) In view of the present service levels in the project area, how do we improve the service level? Where do we intend to source our water supply from? In what quantities can we get our water supply? Is this supply sufficient to meet the water demand of the project area? If not are there other alternatives? Or how do we intend to address the inadequacy? 2

Defining the Project Approach &Components Technical Approach (in context of the Objectives) Are there (legal) requirements to fulfill before commencing the project? If yes, identify them and explain how you intend acquiring them? What resources (human and equipment) do you require implement the project? What do you estimate the project to cost? How long do you estimate the project to take? Etc. 3

Technical Project Component Off take (source) >> Please confirm: Adequacy Pressure heads Water quality Constraints Transmission Define the quantity to be transmitted Define the mode of transmission If a pipeline extension is required, please define the routing Acquire the way leaves as appropriate Provide route profiles and layout where necessary Design your pipelines 4

Defining the Project Approach & Components Technical Approach (in context of the Objectives) Incase where the off take and transmission exist think of the improvements required Balancing Storage: Is storage required? If yes, could you size the storage required? Outlets: Individual connections Water Kiosks (open, closed) Stand taps / Yard Taps Other (later the WSTF will include pre-paid metered taps) 5

Defining the Project Approach & Components Technical Approach Operation & Maintenance What management model do you intend to use? What role is the Company to play in O&M in these areas? Identify the incentives that will make you undertake above? 6

7