1 ASSET DEVELOPMENT APRIL 2006
Service Notification GR: 443969,239711 SITE ADDRESS: Broughton Road Banbury OX16 9QR WPA: 131 WPZ: ZBRETT01 DTS: 46988 DMA: BRETCH TOWER Parent Main Material CI SIZE: 6” Proposed Main Material PAGE 1 OF 4 POE on page 4 HPPE SIZE: 90mm Water Demand Information Water Storage (Volume or daily percentage) litres Details Lay approx 500m of 90mm HPPE main extension of existing 6”CI main to allow service supply connection to serve 40 new build houses. Our site field engineer has confirmed on 09/02/16 water pressure. The 6”CI main that we are planning to connect to (option2) have 6 bar pressure. ASSET DEVELOPMENT APRIL 2006 S:\Network Coordination\Templates & Technical\New Demand Spreadsheet Templates

2 Site KEY FOR NEW SERVICE CONNECTIONS Service Connection 2-Port
Manifold 4-Port Manifold 6-Port Manifold Revenue meter Valve Site

3 Easement strip for the Existing 24” SI /610mm SI

4 Option 1 P4 P3 P1 90mm HPPE P2 90mm HPPE 90mm HPPE P1 Option 2 P1

5 Our site field engineer has confirmed
today 09/02/16 water pressure. The 6”CI main that we are planning to connect to (option2) have 6 bar pressure. 6 Bar pressure 6 Bar pressure 2 Bar pressure