Richard Hislop FAC 24 - 28 October 2005 1 Construction Safety Richard Hislop.

Slides:



Advertisements
Similar presentations
Health and Safety Executive Health and Safety Executive CDM 2007 Training Package Session 5 – Principal contractors & contractors Version: September 2007.
Advertisements

1 Integration of EMS and ISMS at the Idaho Cleanup Project Kliss McNeel November 1, 2006.
Richard Hislop Construction April 7, CONSTRUCTION SAFETY Richard Hislop.
MOL GROUP CONTRACTOR HSE MANAGEMENT New Elements of Contractor Safety BÉLA CSEH – MOL Group HSE Director Supplier Forum - Budapest, 14 th November 2007.
Contractor Oversight Inside and Outside of VPP 16 th Annual Safety Professional Development Conference Jim Boom Directorate of Cooperative and State Programs.
21st Annual Joint Safety and Occupational Health Professional Development Conference (PDC) - Contractor Oversight - Outside & Inside VPP March 8, 2013.
THE CONSTRUCTION INDUSTRY CONSTRUCTION REGULATIONS 2003.
Michael Scharfenstein FAC June 17, ES&H Status of Construction and Technical System Installations Michael Scharfenstein.
Richard Hislop FAC April 20-21, 2006 CONSTRUCTION SAFETY Richard Hislop LCLS Construction Safety Coordinator.
1 Michael Scharfenstein 1 Environment, Safety and Health CXI Final Instrument Design Review, June Mike Scharfenstein ES&H.
Javier A. Sevilla MMF FAC Review October 27, Magnetic Measuring Facility (MMF) Outline Summary of Facility Requirements.
Michael Scharfenstein FAC October LCLS Environment, Safety & Health Michael Scharfenstein ES&H Coordinator.
Bob Law FAC Review April 14, 2007 LCLS Conventional Facilities Construction Field Change Orders Bob Law.
1 Jess Albino 1 Conventional Facilities Status FAC Review – Breakout Session CONVENTIONAL FACILITIES STATUS Jess Albino – Associate.
Jess Albino Facility Advisory October 30, 2007 FACILITY ADVISORY COMMITTEE BREAKOUT SESSION 5 TURNER CONTRACT OVERVIEW.
Michael Scharfenstein FAC April 7, 2005 LCLS ES&H Process and Documentation.
Jo Beth Folger FAC - CF Breakout – Sector April 8, Sector 20 Project Overview Sector 20 Site Plan Description Schedule.
Bob Law FAC Oct 24, Sector 20 Project Overview Sector 20 Site Plan Description Organizational Chart Schedule Cost.
SLAC ES&H Overview Craig Ferguson March Operating Model ES&H Mission Critical Issues Challenges Path forward Topics October 2008.
Mike Scharfenstein FAC Review - November 11, 2008 SLAC National Accelerator Laboratory 1 Environment Safety & Health Status.
Michael Scharfenstein FAC April 16, 2007 LCLS CONSTRUCTION SAFETY Michael Scharfenstein.
Michael Scharfenstein FAC October 30, LCLS CONSTRUCTION SAFETY Michael Scharfenstein.
Mike Scharfenstein CF Breakout - 12 November 2008 SLAC National Accelerator Laboratory 1 ES&H Status of Construction and Technical.
Jose Chan FAC Review- LTU-DUMP Installation Status & 11/11/08 1 LTU-Dump Installation Status & Schedule.
M. Scharfenstein FAC April 20-21, PROJECT SAFETY Michael Scharfenstein LCLS ES&H Coordinator.
Javier A. Sevilla April 5, Magnetic Measuring Facility (MMF) Outline Organizational Chart Facility Design Criteria,
CHAPTER 2 – ROLES OF CONSTRUCTION PERSONNEL IN SAFETY AND HEALTH
WHS Management Plans.
1 BROOKHAVEN SCIENCE ASSOCIATES Construction Safety W. R. Casey NSLS-II ESH Manager CFAC 5/8/08.
M. Scharfenstein - ES&H Coordinator 8 June 2009
David McGiven FAC: Construction April 2006 Facility Advisory Committee (FAC) Construction Procurement David.
DOE-HSS Review of LBNL Science Divisions 10/23/08.
ISM Workshop 1 Independent Oversight Perspectives Michael A. Kilpatrick Deputy Director Office of Security and Safety Performance Assurance.
1 Lori Plummer 1 LCLS Office Space FAC Review – Breakout Session CONVENTIONAL FACILITIES LCLS Office Space Lori Plummer, PMP,
10 CFR 851 Worker Safety and Health Program Overview.
1 DOE IMPLEMENTATION WORKSHOP ASSESSING MY EMS Steven R. Woodbury
Copyright  Progressive Business Publications 1 After an Accident: The First 24 Hours.
1 Safety & Health Management. One of the most important factors that should be taken in consideration in the site, (from engineering point view), is the.
Thomas Otto (TE DSO), Safety Officer in Charge of LS1. 37th LSC, Thomas Otto, Safety Officer in charge of LS11.
Canadian Edition [Insert cover image] Copyright © 2007 Pearson Education Canada22-1 Practical Law of Architecture, Engineering, and Geoscience Chapter.
Using ISMS Principles and Functions in Developing an ARRA Readiness Review Process Presented by Linda K. Rogers Assessments & Readiness Programs Manager.
ISM at the Savannah River Site Department of Energy Best Practices Workshop Facility Evaluation Board Steve Johnson, Manager Operations Evaluation Department.
Understanding the EHS Management System Development Process David Downs President EHS Management Partners,Inc.
Do Work Safely DOE Hanford Site Recovery Act Support to New Workers Ted Giltz Hanford Site Recovery Act Project Manager
David Saenz Readiness for Oct 12, 2006 # Meeting of the LCLS Facilities Advisory Committee LCLS Conventional Facilities.
Office of the Under Secretary 1 CENTRAL TECHNICAL AUTHORITY A SYSTEMATIC APPROACH TO NUCLEAR SAFETY Dr. Tim Arcano Deputy Chief of Nuclear Safety Office.
Pre-Construction Activities to include: - Provide effective overlap period and oversight of effort - Estimates during - CPM Schedule - Identify lead-time.
Monitoring the Long-Term Effectiveness of Integrated Safety Management System (ISMS) Implementation Through Use of a Performance Dash Board Process Mike.
Independent Oversight Status Report on Workplace Exposure Monitoring ISM Workshop 2007.
Chapter 12 – Fire/Life Safety Rick C. Erickson February 13, 2013 Hot Work Permits.
Department of Defense Voluntary Protection Programs Center of Excellence Development, Validation, Implementation and Enhancement for a Voluntary Protection.
1 Service Coordinator Orientation FN R. CollESH SectionX8518.
A Compilation of Cases for Forestry. Case Origins Employer reports Complaints Referrals Programmed inspections.
DoD Lead Agent: Office of the Assistant Secretary of the Army (Installations and Environment) Department of Defense Voluntary Protection Programs Center.
LCLS-II ES&H Requirements: Subcontractors
Preview of Access Processes for Working at SURF
CHAPTER 2 – ROLES OF CONSTRUCTION PERSONNEL IN SAFETY AND HEALTH
MGT 3035 Enthusiastic Studysnaptutorial.com
The Federal Oversight and Contractor Assurance System Directives Safety Culture Improvement Panel Meeting September 7, 2016 Patricia.
Meeting of the LCLS Facilities Advisory Committee
Conventional & Experimental Facilities Dept.
CONVENTIONAL FACILITIES STATUS
M. Scharfenstein - ES&H Coordinator 14 May 2009
Ian Evans SSRL Safety Office
Integrated Safety and Environmental Management
Michael Scharfenstein Project ES&H Coordinator
CONVENTIONAL FACILITIES
Richard Hislop Construction Safety Coordinator
DOE Review of the LCLS Project October 2006
PROJECT SAFETY Richard Hislop.
Presentation transcript:

Richard Hislop FAC October Construction Safety Richard Hislop

FAC October Successful Safety Program Define Expectations of Performance Establish Roles and Responsibilities Identify Uncontrolled Hazards Effective Work Controls Oversight and Monitoring Enforcement

Richard Hislop FAC October Work in Progress XL Construction Sector 20 demolition Magnet Measurement Facility FFTB Harris Construction Sector 24 Staircase

Richard Hislop FAC October

Richard Hislop FAC October

Richard Hislop FAC October Construction Safety Project Environment, Safety & Health Plan Contractor Selection Criteria Safety Training Hazards Identification and Work Planning Field Oversight

Richard Hislop FAC October LCLS Safety Plan Modeled after SNS ISMS Criteria DOE Order 440.1A Worker Protection Management ANSI A10.33 Safety and Health Program Requirements for Multi- Employer Projects

Richard Hislop FAC October Contractor Selection Criteria EMR Rate equal/less than 0.81 Corporate Safety Plan Interview Key Personnel Job Hazards Analysis & Safety Training References from previous clients Site visits

Richard Hislop FAC October Safety Training LCLS Contractor Safety Orientation Outline provided to SLAC ES&H Division Examples of other project orientations Power Point Show (Contractor Supplement) Conventional Facilities Group Meetings Meetings with Contractor Mgt & Safety Staff LCLS Staff Safety Orientation ( in development )

Richard Hislop FAC October

Richard Hislop FAC October Field Oversight Contractor Field Safety Personnel Conventional Facilities PM/UTR SLAC ES&H Division Oversight SLAC Building and Area Managers Scheduled Senior Management Walks Stanford Site Office Oversight

Richard Hislop FAC October Conclusion Supportive LCLS Conventional Facilities Staff Effective work planning and execution Responsive subcontractors Job Safety & Area Hazards Analysis improving Turner’s staff is enthusiastic