TIME FOR SAFETY Guidance on Safety Day For Supervisors & SWE’s.

Slides:



Advertisements
Similar presentations
1. Manage Yourself Read the PDO House Rules and PDO HSE Golden Rules
Advertisements

Safety In The Workplace CREATED BY: CHELSEA JEAN.
HSSE Policy Z Contractor HSSE Induction V2. HSSE Policy Z Contractor HSSE Induction V2.
2007 Awareness of Safety using Swiss Cheese concept 2011 Reinforcing Life Saving Rules 2008 Small change make Big difference, Pledge made by all 2012.
Risk Tolerance Review Strategies for Understanding and Addressing.
SHE Training Series, Atul Limited1 AN INTRODUCTION TO Zero Injury Program.
4. Move the load 3. Plan the move 2. Check the hoist 1. Prepare for hazards QUITQUIT EASY GUIDES AUSTRALIA PTY LTD Quiz 5. Shut down.
Our Journey To Zero Harm L.A.P.A. - NZ Napier November 2014
Great Lakes Dredge & Dock Company, LLC Improving Safety & Health
1 Hand and Finger Injuries 2004 WORKING AS A TEAM TO PREVENT HANDS AND FINGER INJURIES.
Accident Prevention Programs What Will We Talk About? What is an accident? What is an accident prevention program? Basic elements of a program Where.
Accident Investigations
Understanding the management of risks to health and safety on the premises of a retail business Unit 352.
1 – Electrical Hazard Recognition EFCOG Electrical Safety Subgroup May 2015 Electrical Safety Month 2015.
Workplace Safety and Health Program
Bureau of Workers’ Comp PA Training for Health & Safety (PATHS)
WORKSITE HSE Tools & BEHAVIOUR
1 There are many activities in Well Engineering that involve Working at Height ! An unprotected Fall from a height as low as 1.5 meters can beFATAL.
Risk Management (Safe Work Method Statements)
Risk Assessment – An Essential Standard
International Health and Safety at Work
Safety Meeting Policies, Commitment & Culture January 2010 EDM Services, Inc.
Safety & Health Programs.
Job Hazard Analysis Proactive Planning to Prevent Incidents Also known as: Task Safety Analysis, Job Safety Analysis Pre-requisites: None Course Goals:
TWM STOP 5/02 Slide 1 To date in 2002 there has been, To date in 2002 there has been, 6 Lost Time Incidents & 55 injuries in Well Engineering (6 LTI’s.
Introduction Research indicates benefits to companies who establish effective worker safety and health programs: –Reduction in the extent and severity.
Main contractor name – LTI# - Date of incident Workplace Safety Engagement Pack Volume 2014 Edition 1 Working at Heights.
Nearmiss Presentation
Time to STOP for Safety AGAIN 19/Nov/011 Work Stoppage 19 November 2001 Time to for Safety AGAIN ! AGAIN !.
Job Safety Analysis.
EliminationSubstitutionEngineeringAdministrationPPE Incident Reporting.
WEEKLY SAFETY MEETING September 22 nd, OGEC RIG RR 600 JOBI-4.
Our Journey To Zero Harm Illawarra Retirement Trust November 2013.
Safety Day 2013, 19 June Safety Day – 19 June 2013 By: (Insert your Name, Position & Company) 1 Themes: Take Time for Safety Tell a Friend Campaign.
EFFECTIVE ACCIDENT/INCIDENT INVESTIGATION 15 FEBRUARY 2013 PHILIPPINE ASSOCIATION OF SAFETY ENGINEERS -QATAR- -QATAR- COMMITTEE ON SAFETY EDUCATION 2013.
MNM Fatal Slip or Fall of Person Slip or Fall of Person August 21, 2004 (Oregon) August 21, 2004 (Oregon) Sand & Gravel Operation Sand & Gravel.
Toolbox Meetings What is a toolbox meeting? An informal 5 to 15 minute meeting held by supervisors used to promote safety.
Working at Height Safety Theme March Working at Height Working at height has been formally classified as a high-risk activity, all workers involved.
MNM Fatal Slip or Fall of Person (Indiana) Slip or Fall of Person (Indiana) February 26, 2004 February 26, 2004 Crushed Stone Operation Crushed.
GATE SAFETY WEEK TH OCTOBER GUIDANCE FOR HOMEOWNERS AND THE PUBLIC KEEPING THE NATION SAFE A guide to keeping you safe around powered gates.
Situational Awareness Airport Safety Week Case Study Situational Awareness – Case Study Location: Ramp Area Scenario  A staff member walked behind.
Focus on What's Important
HSE Leadership On The Front Line
Safety Leadership for Front Line Supervisors (FLS)
Always ensure travelling block is stationary during DM changeover
PDO Safety Advice Date: Injury: Fractured finger
Comply with Safe Operating Procedures
Workplace Safety and Health Training for Selet Hulling PLC
Always stay out of the line of fire
High Potential Near Miss
يوم السلامة 2012 اقتطع وقتا للسلامة.
Do not work at height without fall protection
Reporting Incidents and Hazards Accident Prevention
SAFETY LEADERSHIP FOR FRONTLINE SUPERVISORS
Please read this before using presentation
HSE LEARNING INCIDENT:
Ensure cat line are under tension before removing elevator bolts
Learning from Incidents Engagement Pack
PDO Second Alert Use Hands Free Lifting Aids What happened?
Always report Near Misses
Keep your hands in a safe position
PDO Second Alert Date: Incident title: HiPo What happened?
Always ensure “no go” zone are in place
Effective communication prevents incidents
Always ensure MOC is used when making changes to equipment setup
Always adhere to Red/No Go zones
CLICK TO SHOW ANIMATION
Theme : The basics - Comply
Theme : The basics - Comply
Presentation transcript:

TIME FOR SAFETY Guidance on Safety Day For Supervisors & SWE’s

TIME FOR SAFETY Roles & Responsibilities Staff (PDO & Contractors)  Look for ways to make time for safety in your role and at your location;  protect your colleagues by helping them to take time for safety;  participate in Safety Day events and challenge your leaders to prepare an effective Safety Day.  Support in spreading the news on upcoming launch of "Tell a friend" Campaign nationwide Senior Well Engineers  Hold Safety Day Session on their units after the Campaign is rolled out in Muscat Office.  All the units should be covered within 3 weeks from the roll out of the Safety Day in Muscat(06/06/2012) .

TIME FOR SAFETY Senior Well Engineers contd.  Should ensure the units have submitted the best Hazard Hunt & TRIC cards done on the day of the Safety day on respective location  Should Effectively execute Safety Days at their respective units( eg: Rigs / Hoists / CWI’s / Workshops etc) and provide feedback to UWD leadership. Supervisors  Supervisor to ensure all Staff are briefed Roles & Responsibilities….

TIME FOR SAFETY About the Safety Day theme-”Time for Safety”  Focuses on the element of “Time”, which is fundamental to our lives and to our business.  Our safety performance relies on all of us taking Time to do things safely.  We encourage you and your team to think about how we all can take Time to do the right thing.  Time to share ideas and concerns on safety.  Time to properly plan to work safely.  Time to intervene.  Even in today’s challenging business environment we should always take Time to do things safely.

TIME FOR SAFETY How to disseminate the information in the slides? Take Time for Safety  Discuss in groups  Share HSE Learning's and good practice (Use the SafetyDay Presentation & Video)  Discuss on How people can contribute to making the workplace safer( eg: No more taking shortcuts, following procedures,doing risk assessments etc  Discuss risks / Hazards around you and how to mitigate them( Discuss TRIC & Hazard Hunts)  Discuss risk associated with upcoming Ramadhan and summer months.

TIME FOR SAFETY 2012 SAFETY DAY “TIME FOR SAFETY”

TIME FOR SAFETY Safety Day - History 2007 : Awareness of Safety using Swiss Cheese concept 2008: Small change make Big Difference, Pledge made by all 2009: Launching of Life Saving Rules 2010: Fatigue Management 2011: Reinforcing Life Saving Rules 2012: Take Time for Safety & Commit Tell a friend Campaign 7

TIME FOR SAFETY SO WHY “TIME FOR SAFETY” WELL………

TIME FOR SAFETY IN THE LAST FEW MONTHS….. We dropped 3 travelling blocks narrowly missing personnel on the Rig floor…… We dropped a Kelly & a casing joint where 5 people could have been killed…… We ignored the danger signs resulting in a floorman falling 9 meters, he is lucky to be alive….. We bled off high pressure using the wrong procedures nearly killing 3 people…..

TIME FOR SAFETY What is worrying this year? Compared to previous years the number of HiPo’s has increased. We have already had 24 HiPo’s in the first five months of operation The severity of the HiPo’s has increased, a number of incidents could have resulted in multiple fatalities The HiPo’s show an increasing trend.

TIME FOR SAFETY What is an HiPo? An unplanned HSE event (incident or near miss) which has the potential severity to cause permanent disablement or death. It means we were lucky not to kill or permanently harm anyone!

TIME FOR SAFETY Lets look at some of the HiPo’s we had Incident & Causes Whilst lowering the mast, when it was at approximately 35 degrees, the substructure suddenly moved upward causing the mast to fall onto the carrier support causing damage to the mast and substructure. Cause: 1.Not Following Procedures 2.Inadequate Hazard Identification Afetr the CTU had stimulated the well with Acid and Nitrogen, the Wire line operation was in progress to open the SSD.While attempting to bleed off well bore pressure through choke manifold, the bleed off line slid out of anchors and moved backwards in an uncontrolled manner resulting into hurting three persons. Cause: 1.Inadequate Procedure 2.Inadequate supervision

TIME FOR SAFETY Lets look at some of the HiPo’s Incident & Causes While running in the 74th stand, AD disengaged the hydromatic brake. The Draw work’s brake failed to control the travelling block, which descended from a height of approx 2m coming to rest on the hoist work floor 2 Floormen escaped down the main stairs without injury Cause: 1.Failure to report Unsafe condition 2.Failure to follow Procedures While POOH 3rd joint of milling assembly with power swivel on the driller lost control on brake, both block and swivel started to come down. Driller attempted to control the descent with the brake with no success. Rig Manager observed this & shouted to the persons to escape from floor, Power swivel landed inside the Hydrill and the T/Block landed on the floor. Cause: 1.Inadequate Risk Assessment 2.Inadequate Competency

TIME FOR SAFETY Incident & Causes While slipping drill line, due to abrupt movement of the drill line one of the rig floor cover plate lifted and dropped down 9.3 m into the sub-base along with a Floorman who was standing on the backend of the floor plate. IP sustained multiple injuries and X-Ray revealed fracture of both lower jaws. Cause Inadequate risk assesment Inadequate Supervision Inadequate Procedures Failure In management of change While picking a joint of 9-5/8” casing, the Travelling Block swung and hit the Swivel of the Kelly which was secured in the Mast. This caused the Mounting Pin of the Kelly Racking Arm to shear. The pin weighing 12 kg fell to the ground beyond the Dog. The impact caused the Kelly to come off its stand and it descended through the opening of the mud bucket hole and landed on the drain edge of the Cellar. The Racking Arm Assembly (800 kg) fell on the Rig Floor towards the V Door.The Elevator sling parted and the casing joint fell back through the V Door to rest on the ground ( pin end resting on the ground ). The elevator (15 kg) fell between the Rotary and the Drillers’ Console At the time of the incident 5 crew members were working on the drill floor, the six crew member, the Derrick Man was stationed at the stabbing board. He sustained a bruise to his right knee.(FAC) Cause 1.Inadequate Supervision 2.Inadequate Risk Assessment Lets look at some of the HiPo’s

TIME FOR SAFETY Are you comfortable in such a workplace?

TIME FOR SAFETY Incident after incident We continue to see HiPo’s –They seem to be so unexpected… –Barriers… multiple barriers… are defeated … –Systems… multiple systems… are defeated … What can we do..? 16 June 2012

TIME FOR SAFETY What are the common causes of these incidents? Inadequate Risk Assessment Inadequate Supervision of the job Not reporting Unsafe Conditions Failure to follow Procedures Poor Management of Change

TIME FOR SAFETY How can you overcome this? Inadequate supervision  Supervisors must ensure that the crew members identify the hazards of the job and the implement precautions to be taken..  Supervisors should supervise the job and should not carry out the task themselves.  Supervisors must also follow procedures Do you TAKE TIME to Supervise Safely……….

TIME FOR SAFETY Inadequate risk assessment  Ensure job specific procedures and JSA’s are used where and when available.  Involve the crew in assessing the risks of their area.  Ensure TRIC cards are correctly completed and address all the relevant risks involved.  E nsure TRIC is used as it is supposed to be used and not a paper exercise Do you TAKE TIME to do your Risk Assessment……….

TIME FOR SAFETY Not reporting unsafe condition/acts prevailing in the area of work  Some of the HiPos could have been prevented had the crew decided to report and take action against the unsafe conditions prevailing in their work place.  All are empowered to STOP the job if the conditions are unsafe! Do you TAKE TIME to STOP and correct Unsafe Conditions….

TIME FOR SAFETY Failure to follow Procedures  Procedures should be made available and followed at you worksite.  Procedure must be followed to get the job done safely and efficiently.  Not following procedures simply means your are taking a shortcut. Do you TAKE TIME to follow the Procedures…

TIME FOR SAFETY Poor Management of Change  Do you STOP the job when there is deviation from the original plan/procedure?  Do you reassess the risks when there is a change in the job conditions? Do you TAKE TIME to STOP when the situation changes…..

TIME FOR SAFETY Incident after incident In many of the HiPo’s… Both Supervisor or Crew members had the chance to Stop The Job… BUT DIDN’T..! 23 June 2012 Will YOU take TIME for SAFETY?

TIME FOR SAFETY Safety Day Competition Best Safety Day TRIC card Best Safety Day Hazard Hunt. for each of the 3 categories: Rigs, Hoists and Others

TIME FOR SAFETY Hazard Hunt Conduct a Hazard Hunt in Teams on one of the following categories mentioned below on your location and submit the same to your SWE When looking for hazards think about the following sources of energy: Gravity: what can fall Pressure: what can burst or come free Electrical: What is exposed, can cause a shock Motion: what can swing or suddenly move Biological: Food and water poinsinig Radiation: Logging sources, NORM Heat: burns, fire Chemical: As dust or fluids

TIME FOR SAFETY DID YOU TAKE

TIME FOR SAFETY “Tell a Friend” Campaign

TIME FOR SAFETY Commitment  Plan to launch ”Tell a Friend” Campaign on Road Safety across Oman in October.  All stakeholders invited to join in e.g. insurance companies, road safety NGO etc. What is “Tell a Friend” ?  A campaign to raise awareness and knowledge through spreading “word-of- mouth” among colleagues, friends and relatives Why Road Safety?  Is a high risk and painful area : See following viewgraphs on statistics, causes of incidents and impact Prepare to Support “Tell a Friend” Campaign 28

TIME FOR SAFETY Road Safety Statistics World Road Safety Statistics 1.5 million people die on roads every year around the globe Oman Road Safety Statistics 2010:7571 accidents causing 820 lives lost and injuries 2011:7719 accidents causing 1056 lives lost and injuries PDO Road Safety Statistics 2010:93 accidents causing 4 work related fatalities and 8 LTI’s 2011:93 accidents causing 0 work related fatalities and 12 LTI’s 29

TIME FOR SAFETY Key Causes of Road Accidents Speeding Using mobile phones while driving Not fastening seatbelts Fatigue Alcohol Bad Weather (Fog, dust) 30

TIME FOR SAFETY Impact of the Road Accidents Pain,Grief - Families losing loved ones Financial loss Damage to vehicles Medical treatment Family income 31

TIME FOR SAFETY Your contribution: Be prepared and start to: Tell your colleagues, friends & family about road safety Spread the message using different communication tools ( mobile phones, s, word-of-mouth) Educate your children on road safety Be a role model (use seatbelts, do not use mobile phones while driving) 32