TECH 50800 Project Measure Phase QC Throughput Rate Improvement.

Slides:



Advertisements
Similar presentations
TECH PROJECT COMPANY X DOCUMENTATION PLAN ANALYZE PHASE November 13, 2013 Stephanie Sachs & Shane Hatchett.
Advertisements

City of Englewood Work Order Software Project TECH Project Analyze Phase Date: 11/13/2013 Michael Hogan.
Reducing False Failures in Metrology TECH 581: Measure Phase John R. Ulrich Fall 2013.
Patient Admission from ED to Acute Care Tech 581: Analyze Presentation November 11, 2008 xxxxxx Sound Removed.
Thomas A. Crane 2010Page 1 Product and/or Process Transfers The goal is uninterrupted customer service.
TECH Project Healthcare IT Asset Management Analyze Phase Date: 11/13/2013 Team members: Angela Hutson.
Real Estate Hurricane Response Tech 581 Analyze Presentation Laban Zurowski November 13, 2013.
TECH Project Title Payroll Fund Measure Phase Date:20 Oct, 2013 Team members: Matt Unger.
QC Throughput Rate Improvement TECH Project Champion/Define Phase.
Statistical Analysis with Excel
TECH581 Fall 2013 Measure Presentation October 23, 2013 Alex Garcia.
Improve the Data Management at The Caring Center Tech 581: Champion/Define Presentation Date: October 2013 LSA Team members: Escobar, Luis Johansen, Shahpar.
Your Catapult Team Do the following:
TECH581 Fall 2013 Measure Presentation November 11, 2013 Alex Garcia.
TECH Project Title: Customer Service management in automotive Industries Champion/Define Phase Date: 10/1/2014 Team member: Ponnappa Bheemaiah.
TECH Project Title : Customer service management in automotive industries Measure Phase Date:29/10/2014 Team member: Ponnappa Bheemaiah.
TECH Project Design and Manufacturing Control Process for Formula SAE Analyze Phase Date: 11/19/2014 Team members: Chris Lawrence.
QC Throughput Rate Improvement Increase productivity from 55 units/8 hrs/person to 60 units/8 hrs/person On time delivery Decrease in unit cost Improved.
Tech 50800: Champion/Define Presentation Summary of project  Sycamore companies are collecting information on cars from three different locations to.
Improving Patient Bed Wait time in Healthcare
Improve the Data Management at The Caring Center Tech 581: Champion/Define Presentation Date: November 2013 LSA Team members: Escobar, Luis Johansen, Shahpar.
TECH Project Change Management Process Improvement Analyze Phase Date:11/7/2014 Team members: Matt Kirchhoff.
TECH Project Title:Customer Service management in automotive industries Improve Phase Date: Team member: Ponnappa Bheemaiah.
Intro to LSS1 LSSG Green Belt Training Introduction to Lean Six Sigma.
1 Software Quality Engineering CS410 Class 5 Seven Basic Quality Tools.
1 Russ Albright, Director. 2 Overview Vision and motivation What is Six Sigma?
Quality Tools.
Patient Admission from ED to Acute Care Tech 581: Improve/Control Presentation December 9, 2008 xxxxx Sound Removed.
1 King Fahd University of Petroleum & Minerals Department of Construction Engineering & Management CEM 515: Project Quality Management Case study of 8-phases.
TECH Project Bank Card Procurement Process Analyze Phase Date: 11/19/2014 Dave Shoffner.
Black Belt Project Storyboard Template
Chapter 7 – Developing Audit Trails 1 Process Approach Auditing 5-February-2009 Developing Audit Trails that Make a Difference.
Examples for the midterm. data = {4,3,6,3,9,6,3,2,6,9} Example 1 Mode = Median = Mean = Standard deviation = Variance = Z scores =
TECH581 Fall 2008 Measure Presentation Date: 10/24/08 Team members: xxxxx Sound Removed.
Improving Patient Bed Wait time in Healthcare DATE: 19 NOVEMBER 2014 TEAM MEMBERS: PRIYANKA PRIYANKA. AHMAD ALMATROOD. TECH Analyze Phase.
Define Tollgate Checklist
1 Quality Tools. 2 3 A philosophy that involves everyone in an organization in a continual effort to improve quality and achieve customer satisfaction.
Aim: How to plot or graph data Dow Now: What are the steps to the Scientific Method. HOMEWORK: ON SEPARATE SHEET OF PAPER OF DATA FROM THE BACK PAGE OF.
Process Characteristics
Normal Curves Often good representation of real data Often good approximations of chance outcomes.
CASE STUDY PRESENTATION FORMAT It can be shared with all. Use this format for giving Case Study presentation at 3 rd Lean Kaizen Mela Gemba Owners 20 th.
Statistical analysis and graphical representation In Psychology, the data we have collected (raw data) does not really tell us anything therefore we need.
Statistical Analysis with Excel. Learning Objectives Be able to use the Dial Caliper to measure Be able to use Microsoft Excel to –Calculate mean, median,
Probability and Statistics 12/11/2015. Statistics Review/ Excel: Objectives Be able to find the mean, median, mode and standard deviation for a set of.
Overview of System or Process Design and Improvement 1.
Black Belt Project Storyboard Template Can be used in combination with Black Belt Storyboard Submission Guide Visit GoLeanSixSigma.com for more Lean Six.
TECH Project Title: Improving operation of Goodwill retail store Managers and abiding FLSA(Fair labor Standard Acts) for Over Time. Analyze Phase.
TECH Project Title: Improving operation of Goodwill retail store Managers and abiding FLSA(Fair labor Standard Acts) for Over Time. Measure Phase.
DEC. 11, 2015 DAVID SCHIPPNICK TECH PROJECT STREAMLINE ORDERING IMPROVE/CONTROL.
OCT. 26, 2015 DAVID SCHIPPNICK TECH PROJECT STREAMLINE ORDERING MEASURE PHASE.
Tech 50800: Champion/Define Phases DATE: PRESENTER: DARON SAUNDERS.
Accounting Cycle.
TM 720: Statistical Process Control DMAIC Problem Solving
Practical Assessment Project Template
The DMAIC Method
Six Sigma Approach.
Applications Using Visio
Practical Assessment Project Template
Quicken Support Phone Number More info :
© T Madas.
DMAIC Project Template
 HP Printer Support Phone Number  HP Printer Technical Support Phone Number  HP Printer Technical Support Service Number  HP Support Phone Number.
Certification Project Template
Standard Deviation.
Notes Over 7.7 Finding Measures of Central Tendency
Averages and range from a list of data: Increase, decrease, same?
Title: “How Much Do We Deviate”
CPI Event / Project Tollgate Template
Lean-Green belt six sigma program
Presentation transcript:

TECH Project Measure Phase QC Throughput Rate Improvement

Project Review  Productivity is the KPI at our facility. So if productivity is increased the cost decreases.  No project has been done for the AWCC Quality productivity (KPI). Since the repair department is being transferred to another facility, need is to understand the productivity expectations.

SIPOC

CTQ Tree QC’d Phone Labelers Kitters Final QC check Associates Overall repaired phone Manpower Functional test Components ICE Customers CTQ KPOV KPIVs

Process Map

 Process observation worksheet  Check sheets  Spaghetti diagram

Data Collection Plan Historical data Process owner Excel file attached with the presentation

Graphical Representation

Graphical Representation (haroldo)

Graphical Representation (gloria)

Mean, Median, Mode, Standard deviation, Range

SWOT StrengthsWeakness  Dedicated manpower  Equipment  55 units/8 hours/person OpportunitiesThreats  Increase production to 60 units/8 hrs/person  Increased customer satisfaction  Increase in soft savings  Associates reluctant to change  Might not understand LSS approach

Tollgate Review I Concur that the Measure phase was successfully completed on 10/22/2013 I concur the project is ready to proceed to next phase: Analyze Anil Nair Champion/MBB Greg Malone Process Owner

Thank You