Status Report, ENTM 02/11/2010 BEAM INTERCEPTING DEVICES FOR LINAC 4.

Slides:



Advertisements
Similar presentations
RAL Front End Test Stand Overview, Status and Plans RAL 12 th January 2005 Alan Letchford, ISIS Injector Group.
Advertisements

Internal H0/H- dump Cesare Maglioni, Melanie Delonca Thanks to: R. Chamizo, R. Versaci, O. Aberle, J. Borburgh.
PSB extraction and transfer kickers 01/10/2014 LIU-PS ABT review1 L. Ducimetière, L. Sermeus.
Session 8 - Long Shutdown 2 Strategy and Preparation LIU Planned Activities Reference : RLIUP Oct.2013 (indico) “Work Effort in the LHC Injector Complex,
BI SW for LINAC4 On behalf of BE/BI/SW BI software development process Specifications List of BI Systems – Not covered: PSB ring systems Conclusions Lars.
Linac 4 PSB BI LTB LT L4T m from PIMS to foil: m new line (to BHZ20) m present Linac2 line Active elements : 4+2bendings; quads,
LINAC4 STATUS Alessandra M. Lombardi for the LINAC4 team 1.Motivation and goals 2.Status of Linac4 2 years after official start of the project ( )
Chopping Simulations Results M. Garcia Tudela, JB. Lallement, PA. Posocco, A. Lombardi, G.Bellodi, M. Eshraqi, E. Sargsyan, L. Hein 1 17/06/2010.
LINAC 4 Project L4T/L4Z Design Status J.Humbert / B.Riffaud on behalf of EN-MME design team 1 st September 2011 LINAC4 – BEAM COORDINATION COMMITTEE B.Riffaud.
MedAustron Beam Intercepting Devices BID Workpackage Review 15 March R. Folch EN/STI - BID Workpackage Review - March 2012 Speakers: Ramon.
Beam load estimates for the PS2 Beam Dump Systems T. Kramer, M. Benedikt, B. Goddard.
Laser Stripping and H 0 monitor systems 10/18/2011B.Cheymol, E. Bravin, U. Raich, F. Roncarolo BE/BI1.
Linac4 FBCT’s 18/ L4 BI BCT review Lars Søby On the behalf of: M. Andersen, D. Belohrad, L. Jensen, Franco Lenardon and J. C. Allica Santamaria.
NUFACT August 2014 E. Wildner, CERN 13/03/14Nufact14, Glasgow, E. Wildner 2 Accumulator Ring for the ESS Neutrino Super Beam.
1 1. Some recent views ( ) 2 Linac tunnel
S. Belogurov, ITEP, Moscow CBM Collaboration meeting, Split, CBM beam pipe and integration inside the Magnet Status report Sergey Belogurov,
New injection region 1L1 Engineering Change Request PSB-L-EC-0001 EDMS Wim Weterings PLI Meeting Wednesday 14 th January 2015.
F. Regis, LINAC4 – LBS & LBE LINES DUMP DESIGN.
E. GschwendtnerMDI, 18 Feb Post-Collision Line and Dumps Working Group The PCLD Working Group shall co-ordinate the design and experimental work.
The Stripping Foil Test Stand in the Linac4 Transfer Line
Internal H0/H- dump M. Delonca, C. Maglioni On behalf of EN/STI Thanks to: A. Christov, S. Mathot, C. Pasquino, A. Patapenka.
STATUS OF H0/H- DUMPS M. Delonca – LIU meeting 29/11/2012 Thanks to: C. Maglioni, A. Patapenka, C. Pasquino, A. Perez, N. Mariani.
Status of Radiation Protection Studies for the Linac4 beam dumps Joachim Vollaire DGS/RP.
Status of MAMI C Hans-Jürgen Arends CB-Meeting, Basel October 4-6, 2006.
Linac4 Status 1 M. Vretenar sLHC public event
Beam Stoppers for LINAC 4
SBS Magnet and Infrastructure Status Robin Wines July 2015.
Presentation at BBC, Linac 4 Commissioning Dump at 50 and 100MeV 1 Øyvind Dahle Lauten, EN-STI.
Thermosiphon project management and quality assurance EN/CV/DC Presentation done by Elena Perez Rodriguez For further information contact
LIU Day – 11 th april 2014 ALESSANDRA LOMBARDI LINAC4 COMMISSIONING OVERVIEW.
Ch. Vuitton – BE/BI Presented by R. Veness – BE/BI 18th October
1 1.Summary of H- source review 2.Options for connection to the PS Booster 1.Summary of H- source review 2.Options for connection to the PS Booster.
TBTS Test Program & Schedule G. Riddone
PS/SPS Days Roberto Losito/Oliver Aberle 13th January 2004
R. A. Barlow, LIU-PSB review, 20 Nov BI.DIS Pulse generators controls R.A.Barlow, LIU-PSB review, 20 Nov
LIU-PSB BIS presentation / Christophe Martin TE-MPE-EP 28/02/ Beam Interlock System for Transfer Lines & PS Booster Christophe Martin TE/MPE/EP.
Radiation Protection studies for the Linac4 / Linac2 interface Joachim Vollaire, DGS-RP 28/09/2015 Linac4 Coordination Meeting.
PSB H- injection concept J.Borburgh, C.Bracco, C.Carli, B.Goddard, M.Hourican, B.Mikulec, W.Weterings,
L4 BCC – 1 Sep 2011 F. Roncarolo, U. Raich L.Soby, J.Tan, C.Zamantzas, F. Lenardon, C.Vuitton, G-J.Focker.
CERN, 29.January 2009Uli Raich AB/BI 3 MeV instrumentation commissioning U. Raich Linac-4 Beam Coordination Committee
Agenda I.Workpackage overview – R. Folch (25’ + 5’) II.Functional requirements of the BIDs – R. Folch (5’ + 5’) III.FLUKA simulations - A. Christov (15’
Linac4 Project Meeting 1/2011 3/3/2011 M. Vretenar Update on schedule and structure 1.
Transverse Emittance Measurement in the Linac4 Dump Line and the LBE Measurement Line K. Hanke T. Hermanns B. Mikulec With many thanks for discussions.
Linac4 status and long-term schedule M. Vretenar, Project Meeting  status  timeline  open issues  status  timeline  open issues.
Linac4 MAC 29 th January 2008 Thomas Zickler AT/MCS/MNC/tz 1 Magnets for Linac4 Th. Zickler CERN Linac4 Machine Advisory Committee 28 th - 30 th January.
LIU EL-FC ACTIVITIES Georgi Minchev Georgiev EN-EL-FC EDMS
PXIE Beam Instrumentation Status Update – Preparing for MEBT 1.1 Beam Vic Scarpine Feb. 9, 2016.
Proton Driver Keith Gollwitzer Accelerator Division Fermilab MAP Collaboration Meeting June 20, 2013.
Linac4 BCC 14/10/2010 Linac4 Measurement and Dump Lines BCC on the Linac4 Transfer Line Status.
LIU-PSB Working Group meeting: 25/06/2015, Markus Zerlauth Consolidation of magnet interlocks in the PS complex – Warm magnet Interlock System (WIC) R.Mompo,
1. Baseline – from LMC  Presentation by F. Bordry at LHC Machine Committee 5.10 on LS1 Organisation: 1. Linac4 is not going to be connected.
23/06/2011 Linac4 BCC meeting. 23/06/2011 Linac4 BCC meeting Watchdog = Machine protection element whose function is to cut the beam if losses exceed.
M. Munoz April 2, 2014 Beam Commissioning at ESS.
Internal H0/H- dump M. Delonca On behalf of EN/STI Thanks to: A. Christov, C. Maglioni, S. Mathot, C. Pasquino, A. Patapenka.
LIU Configuration Management EDMS Documentation, Layout and ECRs This presentation follows the LIU-PSB specific presentation done on 9 th October 2014.
Cost and schedule for ELENA Beam Transfer Systems W. Bartmann, J. Borburgh, E. Carlier, L. Ducimetiere, T. Fowler, M. Hourican, R. Ostojic, L. Sermeus.
ESS Front End diagnostic
AFC 2017 (and 2018) AFC timeline:
LINAC4 ADVISORY COMMITTEE
LINAC4 50 MeV phase BIS STATUS
BE-BI Software for LINAC4
F. Zocca, F. Roncarolo, B. Cheymol, A. Ravni,
Target and Horn status report
Update on the PSB Transfer Lines
Linac4-PSB 160 MeV connection readiness review ( TE/VSC )
Linac 4 Devices Controls and Monitoring Status
LINAC4 commissioning plans etc.
Advanced Research Electron Accelerator Laboratory
commissioning and measurements
(Beam) Commissioning Plan
Presentation transcript:

Status Report, ENTM 02/11/2010 BEAM INTERCEPTING DEVICES FOR LINAC 4

Overview  Beam stoppers for source/LEBT and for Linac4 transfer line  Chopper line collimator  Beam dumps for the movable bench (C. Maglioni)  MeV measurements bench dump  Beam dumps for LBE/LBS lines and LBS slit  Head, tail, H 0 /H - internal dumps for the PSB injection region (R. Chamizo)  Linac4 main dump (R. Chamizo) 2 O. Aberle, EN-STI, Linac4 Beam Coordination Committee - Meeting 20

3 LINAC 4 layout

 Beam stoppers for source/LEBT 4 O. Aberle, EN-STI, Linac4 Beam Coordination Committee - Meeting 20  Beam dumps for the movable bench (C. Maglioni)  Linac4 main dump (R. Chamizo)  MeV measurements bench dump  Chopper line collimator

Beam stoppers for source/LEBT 5 O. Aberle, EN-STI, Linac4 Beam Coordination Committee - Meeting 20 LINAC4 Project Document No. L4-T-ES-0001 EDMS Document No Racetrack flanges are housing the beamstopper. Two flanges facing each other (180°) 3MeVL4-Nom Maximum H- Current40 mA80 mA Pulse Length150µs400µs Max Rep-Rate2Hz Beam Energy45 keV  Beam parameters

Beam stoppers for source/LEBT  Design finished  Production started  Ready by the end of the year  One unit with Iris to produce a pencil beam 6 O. Aberle, EN-STI, Linac4 Beam Coordination Committee - Meeting 20

 Produced and installed 7 O. Aberle, EN-STI, Linac4 Beam Coordination Committee - Meeting 20 Chopper line collimator (3MeV)

Beam stopper for Linac4 transfer line  Slit LBS  Slits LBE  Fast beam stopper  Sieve (removed)  Beam stopper 8 O. Aberle, EN-STI, Linac4 Beam Coordination Committee - Meeting 20

Beam stopper for Linac4 transfer line  Intension to reuse the existing stopper tank (layout dimensions and functionality)  Simulations for the material to be done  Cooling to be foreseen (additional piping) 9 O. Aberle, EN-STI, Linac4 Beam Coordination Committee - Meeting 20

Beam dumps for LBE/LBS lines and LBS slit  SPECIFICATIONS FOR BEAM DUMPS IN LINAC4 DUMP LINE, LBE AND LBS LINES  F. Regis will work on that  LBE dump  LBS dump, feasibility study for integration done  LBS slit  Start with the 3-12 MeV slit design  Go towards a stripping foil with a dedicated dump (below the spectro- meter magnet?  Have a thick slit, absorb most, but less clean beam? 10 O. Aberle, EN-STI, Linac4 Beam Coordination Committee - Meeting 20 LINAC4 Project Document No. L4-B-ES-0001 v.1.0 EDMS Document No v.1.0

MeV measurements bench dump  USER SPECIFICATIONS FOR LINAC4 COMMISSIONING DUMP AT 50 AND 100 MEV  To be treated together with the main dump (160MeV)  Two solutions:  A “movable“ version for 50 and 100 MeV  Use a stationary dump for 160 MeV 11 O. Aberle, EN-STI, Linac4 Beam Coordination Committee - Meeting 20 LINAC4 Project Document No. L4-T-EP-0004 v.0.2 EDMS Document No v.0.2

MeV measurements bench dump 12 O. Aberle, EN-STI, Linac4 Beam Coordination Committee - Meeting MeV 100 MeV

 Chopper collimator done  Source stopper ready in January 2011  Dumps for the measurement bench April 2011  50/100 MeV dump – 160 MeV main dump for the end of 2012  LBE/LBS and slit from 2013 onwards  TL beam stopper for 2014  Head and tail /H 0 /H - for O. Aberle, EN-STI, Linac4 Beam Coordination Committee - Meeting 20 Planning

EVM / Planning 14 O. Aberle, EN-STI, Linac4 Beam Coordination Committee - Meeting 20 wuv1.0Generated:28-oct :48 cmdwuWU IDBaselineStatusDescriptionWBSHolders Start DateFinish DateComments cmdPxx# Skill[Missing] or ProfileOrg Code [Recharging]DurationUnit (M.WK, %)Start DateFinish DateComments cmdde# WeightDeliverable descriptionActual QtyTotal QtyUnitStart DateFinish DateComments wu48032 Baseline 2PLTL StopperLINAC4 date MSP10Materials & machining CHF MIS.S20FSU support CHF MSP30Design office CHF de1026Materials and oders0100%1-Jun Jul-2011delayed de206Electric parts0100%1-Jun Jul-2011delayed de3013Machining0100%1-Aug Sep-2011delayed de400Parts manufactured0100%1-Aug Sep-2011delayed de450 Technical specification & validation01U1-Nov Feb-2011new date de500Beam stoppers assembled01U30-Sep Dec-2011delayed de600Stopper fully tested01U1-Dec Feb-2012delayed de7025Stopper execution drawings0100%1-Mar Jun-2011delayed de800dump installed01U1-Mar Mar-2012 wu48028 Baseline 2ACStopper Ion sourceLINAC4 modified MSP10Materials & machining CHF MIS.S20FSU support CHF MSP30Design office CHF de1035Materials and oders60100%1-Nov Sep-2010modified de2014Electric parts40100%1-Nov Oct-2010modified de3021Machining25100%1-Nov Sep-2010production de400Parts manufactured25100%1-Nov Sep-2010production de4525Stopper execution drawings100 %30-Nov May-2010Design finished de500Beam stoppers assembled02U1-Feb Oct-2010Date modified de600Stopper fully tested02U31-Oct Nov-2010Date modified de700Stopper installed02U1-Dec Jan-2011Renaming wu48038 Baseline 2ACDump conceptual designLINAC4 de101 Technical specification & validation0.61U1-Apr Oct-2010 Checking new operation scenarios wu48034 Baseline 2AC Ho/H-,head & tail dumps - conceptual designLINAC4 on going de101Technical specification ready0.81U1-Jan Oct-2010

EVM / Planning 15 O. Aberle, EN-STI, Linac4 Beam Coordination Committee - Meeting 20  EVM to be created for:  3-12 MeV measurement bench  LBE/LBS dumps and LBS slit  And the 50/100 MeV dump

16 O. Aberle, EN-STI, Linac4 Beam Coordination Committee - Meeting 20 Reserve slides

17 O. Aberle, EN-STI, Linac4 Beam Coordination Committee - Meeting 20 Reserve