Gantt Charts Trisha Cummings. The History Henry Laurence Gantt's legacy to management is the Gantt chart. Henry Laurence Gantt (1861-1919) was a mechanical.

Slides:



Advertisements
Similar presentations
©2003 Rolls-Royce plc The information in this document is the property of Rolls-Royce plc and may not be copied or communicated to a third party, or used.
Advertisements

Budget Management. 57 Budget Management Budget Development Good scheduling skills and abilities Understanding of the project scope Well developed WBS.
1 What Is It ? Why Do I Need It ? How Do I Do It? Earned Value Analysis.
Planning & Scheduling Systems: From Design to Fabrication.
Project Cost Management Estimation Budget Cost Control
Project Plans CSCI102 - Systems ITCS905 - Systems MCS Systems.
Dr. L. K. Gaafar The American University in Cairo
Monitoring and Control Earned Value Management (EVM)
CSSE Oct.2008 Monitoring and reporting project status Chapter 10, pages
Applied Software Project Management Andrew Stellman & Jennifer Greene Applied Software Project Management Applied Software.
BlueVisoins Management Pty Ltd
Irwin/McGraw-Hill ©The McGraw-Hill Companies, 2000 Chapter 13 Progress and Performance Measurement and Evaluation.
Chapter 10: Monitoring and Controlling Change
Chapter 3: The Project Management Process Groups
Engineering Design Development. Turner College and Career High School.
ANSI/EIA -748 EVMS 32 Guidelines National Aeronautics and Space Administration.
Project Management and Scheduling
Chapter 10 Project Monitoring and Control
Project Management Software Tools Cheryl A. Wilhelmsen Lee Ostrom.
GANTT Charts. What is a GANTT chart? A Gantt chart is a type of bar chart that illustrates a project schedule. Gantt charts illustrate the start and finish.
EARNED VALUE MANAGEMENT SYSTEM A Project Performance Tool
PowerPoint Presentation by Charlie Cook THE MANAGERIAL PROCESS Clifford F. Gray Eric W. Larson Progress and Performance Measurement and Evaluation Chapter.
Project Management Methodology Project monitoring and control.
Progress and Performance Measurement and Evaluation CHAPTER THIRTEEN Student Version Copyright © 2011 by The McGraw-Hill Companies, Inc. All rights reserved.
Chapter 13: Progress and Performance Measurement and Evaluation
© 2006 ITT Educational Services Inc. System Analysis for Software Engineers: Unit 5 Slide 1 Chapter 3 Managing the Information Systems Project.
Chapter 3 : Managing the Information Systems Project.
After Lesson 6 next is Lesson 13 to fit topic on Software Development SOFTWARE PROJECT MANAGEMENT.
Open Workbench By Wilmer Arellano Spring Statement Of Work (SOW) A statement of work (SOW) is a document used in the Project Development Life Cycle.
Project Management Skills & Tools Michelle Sced Research Development Coordinator Division Research Skills Day – 9 March 2007.
Chapter 4 INFORMATION SYSTEM PROJECT MANAGEMENT PREPARED BY : DIYANA BINTI KAMARRUDIN FARAH IZZATI BINTI MOHAMMAD NOR RAIHAN BINTI MD JOHARI.
Chapter 9 Project Communication, Tracking, and Reporting Copyright 2012 John Wiley & Sons, Inc. 9-1.
Recap from last week Understand organizations, including the four frames, organizational structures. Explain why stakeholder management and top management.
Statement of the Work SOW By: Wilmer Arellano FIU Fall 2007.
PowerPoint Presentation by Charlie Cook Copyright © 2006 The McGraw-Hill Companies. All rights reserved. THE MANAGERIAL PROCESS Clifford F. Gray Eric W.
Software Project Management Lecture # 7. What are we studying today? Chapter 24 - Project Scheduling  Effort distribution  Defining task set for the.
Earned Value Management Tutorial Module 5: EVMS Concepts and Methods Prepared by:
Gantt Chart Heba Iqbal. What is a Gantt chart? Developed by Henry Gantt Were considered revolutionary when first introduced Type of bar chart Illustrates.
Ch. 41 Project control. Ch. 42 Work Breakdown Structure WBS describes a break down of project goal into intermediate goals Each in turn broken down in.
10/19/ :26 AM 1 Project Cost Control. 10/19/ :26 AM 2  Controlling involves making sure that the results achieved are in line with the planned.
Project Management Part 6 Project Control. Part 6 - Project Control2 Topic Outline: Project Control Project control steps Measuring and monitoring system.
1 Lecture 4.3b: Earned Value as the Cost and Schedule Metric (SEF Ch 14) Dr. John MacCarthy UMBC CMSC 615 Fall, 2006.
Management & Development of Complex Projects Course Code MS Project Management Earned Value Concepts Lecture # 19.
1 Alternative EVM Applications Not a One-Size-Fits-All.
Project Management “Project Planning & Scheduling”
I n t e g r i t y - S e r v i c e - E x c e l l e n c e Business & Enterprise Systems The Integrated Master Plan (IMP) and the Integrated Master Schedule.
Applied Software Project Management PROJECT SCHEDULES Applied Software Project Management 2:16:07 AM 1.
PowerPoint Presentation by Charlie Cook Copyright © 2006 The McGraw-Hill Companies. All rights reserved. THE MANAGERIAL PROCESS Clifford F. Gray Eric W.
Information System Project Management.  Some problems that org faced with IS dev efforts include schedule delays, cost overrun, less functionality than.
Felix Sanchez and Don Cole
Introduction To Earned Value November 14, Definition Earned Value is a method for measuring project performance. It compares the amount of work.
Where Module 04 : Knowing Where the Project Is 1.
SOFTWARE PROJECT MANAGEMENT
Gantt Chart Design “The best laid schemes of mice and men Often go awry, And leave us nothing but grief and pain, Instead of promised joy!” Robert Burns.
EARNED VALUE  Earned Value Management Systems  Earned Value Analysis.
WEEK 3 Project Planning.
The Project Management Process Groups
Project Cost Con trol. 1.To identify those work types having excessive costs and to give an indication of how serious those overruns are. 2.To forecast.
Agenda ‒ Cost Management ‒ Cost Budgeting ‒ Cost Control Learning Goals 1.Cost Control 2.Earned Value Management.
Measuring Progress HNC Project Management. Measuring Schedule Performance Break project tasks up into small work units. Work units that are too large.
Project Monitoring
TOPIC-8B- PROJECT COST CONTROL
CHAPTER:7 Project Cost Management
Earned Value Management
Project Cost Management
ENGINEERING MANAGEMENT (GE 404)
ENGINEERING MANAGEMENT (GE 404)
فرآيند كنترل پروژه.
MGT 605: CH-13 Progress and Performance Measurement and Evaluation
Project Management Life Cycle
Presentation transcript:

Gantt Charts Trisha Cummings

The History Henry Laurence Gantt's legacy to management is the Gantt chart. Henry Laurence Gantt ( ) was a mechanical engineer, management consultant and industry advisor. Henry Laurence Gantt developed Gantt charts in the second decade of the 20th century. Gantt charts were used as a visual tool to show scheduled and actual progress of projects. Accepted as a commonplace project management tool today, it was an innovation of world-wide importance in the 1920s. Gantt charts were used on large construction projects like the Hoover Dam started in 1931 and the interstate highway network started in 1956.

ABOUT GANTT CHARTS The chart is a graphical representation of the duration of tasks against the progression of time. The chart is a useful tool for planning and scheduling projects. The chart is helpful when monitoring a project's progress.

Planning and Scheduling This chart allows you to assess how long a project should take. This chart lays out the order in which tasks need to be carried out. This chart helps manage the dependencies between tasks.

Monitoring A Project Here the chart allows you to see immediately what should have been achieved at a point in time. Also the chart allows you to see how remedial action may bring the project back on course.

Buzz Word and Their Meanings Actual Cost for Work Performed (AC) - Total amount spent on a task up to the current date.(AC) Budget At Completion (BAC) - Overall approved budget for a task.(BAC) Budget - A fiscal plan of operations for a given time period. Burden - Overhead expenses allocated for a project's direct labor or material.

Cost/Schedule Control System Criteria (C/SCSC) - A set of 35 defined standards. Since 1967, these standards have been used to ensure the government that contracts are managed properly. In December of 1996, these 35 standards were superseded by 32 earned value management standards. Cost Variance - The difference between the BCWP (earned value) and the ACWP (actual costs) Cost Performance Report (CPR) - A cost report, generated monthly by the contractor to show cost and schedule information. Cost/Schedule Status Report (C/SSR) - A report used for smaller value contracts which don't warrant the full C/SCSC, showing cost and schedule.

Demonstration Review (DR) - The first formal review of a contractor's control system to determine whether the system meets C/SCSC requirements. Earned Value (EV) - Earned value is synonymous with the term BCWP (Budget Cost for Work Performed). The actual measured performance; the value of the completed work. (EV) Estimate at Completion (EAC) - A value which represents the expected cost of the project at completion. EAC shows the actual costs to date plus the estimated cost for completing the project.

Estimate to Completion (ETC) - Represents the value of the work required to finish a task. Extended Subsequent Applications Review (ESAR) - Performed instead of a C/SCSC review when contractor conditions have changed. (contractor moves, work moves into a new phase, or when other changes occur) Level of Effort (LOE) - Work which doesn't yield a final product. Examples: coordination, follow-up and other support activities.

Milestone - An important event. Organizational Breakdown Structure (OBS) - A structure which shows work responsibilities. The top level shows top management and the structure is detailed downward to the lower levels of management. Statement of Work (SOW) - A document describing the work to be done on the contract. Work Breakdown Structure (WBS) - A tree-like representation of the work to be done on a project. The WBS graphically shows the division of work.

Software And Credits htmlhttp:// html