Cable and Service Installation David Warner Colorado State University May 11, 2009.

Slides:



Advertisements
Similar presentations
Engineering Services Planning Limited
Advertisements

Geothermal Vaults and HDPE Structures. What is a Structure? Valve Vault Manhole Pump Station Catch Basin Junction Box Wet Well Sump Knock Out Pot Valve.
HFT Technical Overview September 26, HFT 2013 TPC FGT 2011 STAR Detectors Fast and Full azimuthal particle identification EMC+EEMC+FMS (-1 ≤ 
Wine Cellar Split System Basics. Definitions Split System – A cooling unit that “splits” the cooling coil and the condenser apart into two remote pieces.
NuMI Radiation and Environmental Protection NBI th International workshop on Neutrino Beams and Instrumentation September 5-9, 2006 Mike Martens.
OU’s 454 reagent cooling system To extend the life of the GS20 reagents for longer than 42 flows, we found it necessary to develop an apparatus for reagent.
G2P Target installation and Beyond. Schedule Pivot before.
RACKS AND CABLES Peter Kim SLAC LST Install Readiness Review May 5, 2004.
The LHCf experiment Measurement of Photons and Neutral Pions in the Very Forward Region of LHC Letter Of Intent: May 2004 Technical report: September 2005.
CPR2 Optical Cables Joey Huston Michigan State University …taking optical signals from edge of CPR/crack detectors to PMT boxes mounted on back of wedges.
MICE Target Status Chris Booth Sheffield 10 th May 2006.
High Power Hg Target Conceptual Design Review Design Requirements, Interfaces, and Schedule P.T. Spampinato V.B. Graves T.A. Gabriel Oak Ridge National.
PEP-II Overview & Ramp Down Plan J. Seeman DOE PEP-II Ramp Down-D&D Review August 6-7, 2007.
Mercury Chamber Considerations V. Graves IDS-NF Target Studies July 2011.
USC 55 Layout w/Rack Wizard View from the front of the racks, crate arrangement is necessary for sharing of e/  data on cables. To GCT Spare Rack.
Target Design Meeting Nozzle & Hg Collection Tests, Design Requirements, Instrumentation, Containment, Windows, Diagnostics, Controls, Base Support Structure,
RD51 Common Test Beam: Status RD51 collaboration week Kolymbari, June 2009 Yorgos Tsipolitis NTUA.
Experimental Area Meeting V. Bobillier1 Good connection to earth (in many points) of every metallic parts to be installed in the cavern is very.
Warm magnets and the remote handling system in the J-PARCν beam line E. Hirose, K. H. Tanaka, Beam Channel Group.
LBT Q Engineering Review PSPI: PEPSI installation preparation, includes all of the pier modifications.
ANU Shutdown Status AEM meeting Cons Gattuso 6/3/2012.
The MINER A Operations Report All Experimenters Meeting Howard Budd, University of Rochester Jun 4, 2012.
Integration GlueX Detector Integration Mission: To ensure systems meet or exceed physics driven goals To ensure that detectors are designed in a sensible.
HCAL Fall meeting Oct 11 to 13, 2004 HF assembly, commissioning and integration Ianos schmidt The University of Iowa.
CMS FPIX Reinstallation/Commissioning Lorenzo Uplegger 4/20/091.
NUMI NuMI Review of the Infrastructure – W, G & V 20 July 2001 WBS Page 1 1 Infrastructure Review - W.B.S Water Systems Water Systems –Upstream.
The LHCf experiment Measurement of Photons and Neutral Pions in the Very Forward Region of LHC Letter Of Intent: May 2004 Technical report: September 2005.
NOvA APD Cooling Water Update William Gilbert University of Minnesota.
Utilities 14 October 2008 Martin Nordby, Gordon Bowden.
1 5 December 2012 Laurent Roy Infrastructure / Electronics Upgrade -Cabling (long distance) -Rack and Crate (space, electrical distribution, cooling) -Detector.
LBT Q Engineering Review PSPI: PEPSI installation preparation, includes all of the pier modifications.
July LEReC Review July 2014 Low Energy RHIC electron Cooling Al Pendzick LEReC Civil Construction.
11 SSD Power and Cooling on the Cone STAR Integration Workshop Howard Matis May 16, 2008 STAR Integration Workshop Howard Matis May 16, 2008.
ALICE Collaboration Meeting Heidelberg Services Update  Progress on services Detector cabling Gas systems Cooling systems  Rack footprint  Primary electrical.
UPDATE at SBU (Feb 24, 2009) 1 st Water Target SuperP0Dule (DaveF, Kevin, Scott) last week spent setting up hoses, pipes, water tank. Problem with unfiltered.
Claudio Bortolin. Drilling: – tungsten carbide tip welded on twisted ss cable – drill to operate the rotation – counter-flow at 200 mbar w/manometer to.
IoP HEPP Lancaster 31/03 – 02/04/08 Gavin Davies Dr. Athanasios Hatzikoutelis Dr. Laura Kormos Lancaster University T2K UK Collaboration  DS-Ecal Design.
MINU GPP WBS 1. Main Injector Neutrino Upgrades - Infrastructure Project Dixon Bogert APD Department Report – March 7, 2007 Russ Alber - FESS Engineering.
HBD electronics status All the ADC and XMIT boards are installed. –Top 3 crates are for the ADC, XMIT boards –Bottom crate is for test pulse boards/future.
Paolo Guglielmini - TS / CV LHCb Install Meeting - 20/04/2005 LHCb Install Meeting 20/04/05 TS / CV / Detector Cooling Installations.
M. Brooks DC Meeting, 15-Sep-00 MuTr Mechanics Status SOUTH ARM: Chambers fabrication complete Stations 2+3 installed Station 1 test-installed will be.
Transversity Readiness and Timeline Xiaodong Jiang, March 17th, This document specifies the overall readiness for Hall A experiments E06-010/E
E.Guschin (INR) 21 November 2003Integration EDR PRS/SPD static envelop, assembly and installation Detector layout Static envelop along the beam Detector.
8/31/05DR Lynch1 HBD Preparations in the IR Don Lynch.
A2-A5: The drawing has been revised (minor changes), the bid has been approved by INFN management and the invitation letter to the companies will be sent.
GlueX Collaboration May05 C. Cuevas 1 Topics: Infrastructure Update New Developments EECAD & Modeling Tools Flash ADC VXS – Crates GlueX Electronics Workshop.
1 hcal installation and commissioning status pawel de barbaro, vitali smirnov, june 11, 2007.
Chris BoothUniversity of Sheffield 1 Target Status & Progress 1 st February 2006 Disappointingly slow progress over last 2 months. However, progress is.
1 BNL LHC Hi-Lumi QXF Vertical Test Facility Status Update M. Anerella, H. Hocker, P. Joshi, P. Kovach, A. Marone September 25, 2015.
DCal-ALICE integration and installation plan and status A. Tauro.
Baby MIND Scintillator modules 11 November 2015 Revision E. Noah.
1 CFS Utilities – What’s included in RDR for IR July CFS Utilities – IRENG WG C WATER COOLING: none. Unknown loads on IR. Only have water plants.
Updates on Vertex Detector NA61/SHINE Collaboration meeting, Wrocław Oct. 8, 2013.
MVD COOLING STATUS COOLING PLANT: -UPDATE of THE HYDRAULIC SYSTEM -INTEGRATION OF THE MVD COOLING CIRCUIT PATHS INSIDE THE PANDA AREA -DEFINITION OF THE.
Kitakami Side AHCAL Assembly or anywhere in any detector.
6.5 Recommended Velocity Of Flow In Pipe And Tubing.
Planning for Proto-DUNE PD Installation and Cabling at CERN
- Condensate pump and feed pump trip!
Update of MVD services and requests
Francois and Lau EATM 17 July 2012
Cooling pipes and Space for Services
Integration – preliminary ideas on routing and tests
Integration issues at IHEP
SIT AND FTD DESIGN FOR ILD
LST Module Installation
Question & Suggestions March 17th
OT Survey & Adjustment Outline: Survey technique at present
- Condensate pump and feed pump trip!
Status and Prospects of Tracker Services Hans Postema (CERN)
Polarized He3 Target Upgrade (Stage I) for A1n/d2n
Presentation transcript:

Cable and Service Installation David Warner Colorado State University May 11, 2009

Basket in ND-280 Hall Beam P0D EndWater Target Tank Chilled Water System

P0D Cable Tray– Readout Side P0D B1-SS Hole Magnet Slot 1

Table of Utilities Installation

Cables to be routed (by system) Detector Readout System – Power: 4 bundles of 6 cables each, total cross-section of 1.5” X 3.25” each – Readout: 12 Optical fibers (in 1.5” plastic conduit) Electronics Cooling system – 12 tubes 1” OD (2 per electronics ladder) LI system – Misc. control and voltage cables, all fitting within four 1” OD plastic conduits Water Target System – 2 Bundles of 3/8” Polyflow tubing (1 bundle of 52 tubes, 1 bundle of 48 tubes) – 2 Emergency drain tubes (2” OD ABS Pipe) – (Unknown) backup slow control cables MUST SPECIFY SOON! Miscellaneous – Six ½” OD dry air feeds MUST SPECIFY AIR SOURCE LOCATION SOON – Other??? MUST SPECIFY SOON!

General Notes: All cable lengths include approximately 10% spare length Cable and pipe routing is currently being inserted into the ND-280 utilities solid model Basket-mounted P0D cable trays are currently being designed, to be ready to ship to J-PARC by June 15 (arrival by June 22) Water target drip trays will install from LI-side of detector, so will not impact other utilities’ installation schedule.

Other Concerns Water source for target system? Main drain for target system to sump – Tentative route identified – 3.5” OD ABS pipe satisfactory? – We need to establish the maximum allowed flow rate the sump pumps can handle. Trigger Cable routing – Path (to top of magnet?) must be defined – Disconnect plan for opening magnet must be defined.