USING MS PROJECT Project management software programs such as Microsoft Project can be used for developing the project schedule We demonstrate the use.

Slides:



Advertisements
Similar presentations
PROJECT MANAGEMENT Chu Eu Ho Dept. of Civil and Environmental Engineering Massachusetts Institute of Technology.
Advertisements

OPMA 5364 Project Management Part 5 Project Scheduling
WBS: Lowest level OBS: Lowest level
USING MS PROJECT Project management software programs such as Microsoft Project can be used to compute the earliest and latest start and finish times and.
CIS 480 Systems Analysis and Design
Project Scheduling: PERT-CPM
PRJ566 Project Planning and Management Lecture: Network Diagrams.
PRJ566 Project Planning and Management Lecture: Dependencies and Network Diagrams.
PLANNING ENGINEERING AND PROJECT MANAGEMENT
Chapter 3 Project Management.
MS Project Tutorial EMEN. Entering Project Properties Choose File Properties Click the Summary tab You can now enter general information about the project.
Microsoft Project Tutorial for Chapters 4 & 5 This Tutorial explains how to: Build a MSP Project Network Build a Probabilistic MSP Network Use the Calendar.
1 Lecture by Junaid Arshad Department of Engineering Management Abridged and adapted by A. M. Al-Araki, sept WBS: Lowest level OBS: Lowest level.
CSSE Sep.2008 Constructing and Analyzing the Project Network Diagram Chapter 6.
Gantt Chart Graph or bar chart with a bar for each project activity that shows passage of time Provides visual display of project schedule Slack amount.
CSSE 372 Week 6 Day 2 Constructing and Analyzing the Project Network Diagram  PERT Chart PERT was invented for the Nautilus submarine project. Ok, maybe.
Tutorial 2 Project Management Activity Charts (PERT Charts)
PREPARED BY : NOR AZAH BINTI AZIZ KOLEJ MATRIKULASI TEKNIKAL KEDAH PROJECT NETWORK DIAGRAM.
MGMT 483 Week 8 Scheduling.
McGraw-Hill/Irwin © The McGraw-Hill Companies, All Rights Reserved Creating Gantt Charts With Microsoft Project Technology Plug-In T12.
Construction Planning and Scheduling A G E NG 520 Schedule Computations Part #2 1. Definition and Computation of Total and Free Floats: Total Float : The.
Project Management (2) Chapter 16, Part 2. EJR 2006 Review of Project Management, Part 1 What is a project? Examples of projects Project performance expectations.
Projmgmt-1/18 DePaul University Evaluating Schedule In MicroSoft Project Instructor: David A. Lash.
Project Plan Optimization Lesson 13. Skills Matrix SkillsMatrix Skill Make time and date adjustments Adjust fiscal year settings within Microsoft Project.
Using MS Project To draw a Network diagram. Add tasks Add the 8 tasks listed for making a cup of tea. Add the duration of each –Note: MS Project doesn’t.
EMGT 501 HW #2 Answer. 020/3 X 3 05/601-1/62/3050/3 X 6 0-5/300-2/3-1/3180/3 (c).3/230with )3/80,0,0,3/50,3/20,0(*)*, ( solution Optimal   Z.
EMGT 501 HW #2 Solutions Chapter 6 - SELF TEST 21 Chapter 6 - SELF TEST 22.
OPSM 639, C. Akkan1 OPSM 639 Project Management Introduction to Microsoft Project - Part 2: Developing a Network Plan.
Microsoft Project Presentation By Corey Johnson 10/11/00.
Project Management Chapter 3 BUSI 2106 – Operations Management.
Copyright © Software Process Group 1 Software Process Group Microsoft Project Tutorial Steve Meyers
Project Time Management J. S. Chou, P.E., Ph.D.. 2 Activity Sequencing  Involves reviewing activities and determining dependencies.  A dependency or.
USING MS PROJECT 2010 Project management software programs such as Microsoft Project 2010 can be used for developing the project schedule and budget, and.
Chapter 6 Introduction to Microsoft Project
ERT461 BIOSYSTEMS ENGINEERING DESIGN 1 ERT424 BIOPROCESS PLANT DESIGN 1.
PROJECT MANAGEMENT Outline What is project mean? Examples of projects… Project Planning and Control Project Life Cycle Gantt Chart PERT/CPM.
1 Microsoft Project 2010 Demo Part 1. 2 Project: Initial Screen To start click Project/Project Information. Add start date.
Project Time Management J. S. Chou, P.E., Ph.D.. 2 Activity Sequencing  Involves reviewing activities and determining dependencies.  A dependency or.
TA. MARAM AL-KHAYYAL NET481 MS Project Overview. Outline Introduction to project management.  Project 2007 can help you manage project time, resources,
Microsoft Project Tutorial for Chapters 4 & 5 This Tutorial explains how to: Build a MSP Project Network Build a Probabilistic MSP Network Use the Calendar.
Fourth R Inc. 1 WELCOME TO MICROSOFT OFFICE PROJECT 2003 INTRODUCTORY COURSE.
Microsoft ® Office Project 2007 Training Linking Project tasks [Your company name] presents:
Project Management Part 5 Project Scheduling. Topic Outline: Project Scheduling Identifying relationships among activities Project network diagrams Identifying.
Copyright 2006 John Wiley & Sons, Inc. Beni Asllani University of Tennessee at Chattanooga Project Management Operations Management - 5 th Edition Chapter.
Copyright 2012 John Wiley & Sons, Inc. Chapter 8 Scheduling.
Chapter 6: Project Time Management Information Technology Project Management, Fourth Edition Using Critical Path and MS Project 2003 Tuesday, February.
A tutorial on MS Project James Burns. 22 Learning Objectives  Entering Tasks in the Gantt View  Task subordination  Linking of Tasks  Setting start.
DECISION MODELING WITH MICROSOFT EXCEL Chapter 14 Copyright 2001 Prentice Hall Publishers and Ardith E. Baker Part 3 andand PERT CPM.
Dependencies and Network Diagrams. Agenda Dependencies Milestones The Network Early/Late Start/End dates Slack/Float Critical Path.
Microsoft Project 2010 ® Tutorial 1: Planning a Project.
Software Project Scheduling By: Sohaib Ejaz Introduction A Gantt chart is a graphical representation of the duration of tasks against the progression.
Project Management – Part 1. Overview What is a project? Project management techniques Activity lists Network diagrams Critical path analysis Gant charts.
Scheduling Scheduling : is the process of converting a project action plan into an operating time table. Why scheduling ? To answer the following questions:
CE 332 – Construction Engineering and Management
MICROSOFT PROJECT MODULE 2 - BUILD A HOUSE.
UNIT II Scheduling Procedures & Techniques FLOAT
Time Planning and Control Activity on Node Network (AON)
Hospital Establishment
Project Scheduling Chapter 14.
A tutorial on MS Project
Project Time Management.
Introduction to Project Planning & Scheduling Software Microsoft Project Prepared by; Emedya Murniwaty Samsudin emedya murniwaty samsudin_msp2013 sem 2.
Time Planning and Control Activity on Node Network (AON)
תזמון פרויקטים.
Time Planning and Control Activity on Node Network (AON)
Microsoft Project 2007 Demo Part 1
General Foundry Example of PERT/CPM
In-Class Scheduling Exercise
Exercise – A small building.
Presentation transcript:

USING MS PROJECT Project management software programs such as Microsoft Project can be used for developing the project schedule We demonstrate the use of MS Project for a sample project Complete model found in construction.mpp M. J. Liberatore DIT 1141

Example Project Table 1: Task, Duration, and Immediate Predecessor Information for Construction Project IMMEDIATE DURATION TASKDESCRIPTION PREDECESSORS(WEEKS) 1START --0 2Excavate and Pour Footers 13 3Pour Concrete Foundation 21 4Erect Rough Wall & Roof 34 5Install Siding 46 6Install Plumbing 43 7Install Electrical 44 8Install Wallboard 6,75 9Lay Flooring 86 10Do Interior Painting 83 11Install Interior Fixtures 9,103 12Install Gutters & Downspouts 52 13Do Grading & Landscaping FINISH 11,130

MS Project Setup Launch MS Project, click on New, OK Click on Project, Project Information, select 10/1/01 as the start date, OK Click on Save icon, type in project name, OK

MS Project Setup

Use Tools, Change Working Time, to make necessary adjustments Tools, Options, click on “Schedule” tab select “weeks” in Duration is entered in make sure New tasks are effort driven is not checked default task type is “fixed duration” Click Set as Default, OK

MS Project Setup Tools, Options, Schedule

Entering Task Information Gantt Chart is the default view, Entry table on left, chart on right Type in task name in the field, tab over to enter duration ( w for weeks) Enter predecessor task numbers in the “Predecessors” field Can use link and unlink icons MS Project automatically gives start and finish dates based on critical path analysis (to be discussed) The Task Information icon can be used to access information about a particular task

Entering Task Information

Drawing AON Network Construction example

Networks in MS Project The Gantt Chart view shows task linkages Change view to Network Diagram by clicking on the icon on the panel on the extreme left Use “zoom” to focus in as desired

Gantt Charts in MS Project

Summary Tasks In Ms Project 2000 Summary tasks can be used to better organize a project Returning to construction.mpp we add three tasks with 0 duration: Structure, Interior, and Exterior Structure includes current tasks 2 – 4, Interior includes 6 – 11, Exterior includes 5, 12, 13 The tasks that are included in each of the summary tasks are moved under them and are indented (thick arrow point to the right)

The summary tasks are outdented (thick arrow point to the left) and appear in bold See constructionS.mpp for the revised project Summary Tasks In Ms Project 2000

Figure 17.10: Gantt Chart View Using Summary Tasks Summary Tasks In Ms Project 2000

Critical Path Analysis MS Project automatically computes the critical path and the earliest and latest start and finish times and slack Project, Project Information, Statistics shows the critical path is 26 weeks in our project

Critical Path Analysis

Critical path tasks can be identified as those have zero total slack (TS) or float TS = LF – EF = LS – ES The TS of only 1 task can be used if we want to be certain about not delaying the project Free slack (FS) of a task is the difference between the smallest of the ES’s of the task’s immediate successors and the task’s EF. Using FS does not affect the start times of a task’s successors FS <= TS FS of of multiple tasks can be used without delaying the project

Critical Path Analysis in MS Project To display the results just shown in MS Project, in the Gantt Chart view, click Views, select Table: Entry, and click on Schedule