The pieces for offshore DC grids are almost in place. There are no technical barriers. Erik Koldby, ABB A/S, Bo Westman and Mats Hyttinen, ABB AB, EWEA.

Slides:



Advertisements
Similar presentations
CONDITIONS FOR SUCCESSFUL INTERRUPTION:
Advertisements

Electrical Infrastructure Design Considerations David Flood Head of Electrical Systems, Forewind Stakeholder Workshops, April 2010.
Study Committee Representatives Annual Report December, 2012
Tore Langeland, Yongtao Yang and Carl Öhlen Risk based approach for development of offshore HVDC transmission technologies EWEA 2012.
CIRCUIT BREAKER FIRST TRIP TESTING Michael McCraney.
During fault behavior of circuit breaker
WATERLOO ELECTRICAL AND COMPUTER ENGINEERING 60s: Power Engineering 1 WATERLOO ELECTRICAL AND COMPUTER ENGINEERING 60s Power Engineering Department of.
Protection notice / Copyright noticeFor presentation in EWEC 2010 HVDC Solution for Offshore Wind Park Comprising Turbines Equipped with Full-Range Converters.
INTRODUCTION TO SWITCHGEARS
CIRCUIT BREAKER.
Multi-function apparatus for secondary distribution
Disconnect Switches There are many purposes for disconnect switches in substations and power lines. They are used to isolate or deenergize equipment for.
INTERNATIONAL ELECTROTECHNICAL COMMISSION Report on SC 17A Activity HV switchgear & controlgear Denis Dufournet Anne Bosma A3-14 (AG 01 ) 013 IWD.
Standardization Aspects in UHV Networks New Delhi, January 2009 Denis Dufournet Chairman IEC TC17 Member CIGRE WG A3-22.
PRESENTATION ON SUBSTATION DESIGN
THE ELECTRIC SUB STATION
Offshore Wind and the European Supergrid Joe Corbett, Head of Technical Services Mainstream Renewable Power Representing: Friends of the Supergrid.
6/10/2003 – e.heineVLVnT facility-power1 EFNI H K Introduction Hypothesis Topology, technical constrains Redundancy, budget constrains Grounding Reliability.
THE TRES AMIGAS SUPERSTATION Southwest Renewable Energy Conference Santa Fe, NMSeptember 16 th 2010 UNITING THE NATION’S ELECTRIC POWER GRID.
Electrical Distribution Training
Domestic Wiring Two wires come from the power pole to the house. The ACTIVE wire is 240 V RMS. The NEUTRAL wire is 0 V and is connected to.
Assumption University Thailand EE4503 Electrical Systems Design Main Circuit 1.
1200 kV AC Substations - Products and Integrated Solutions International UHV Symposium New Delhi, 29. January 2009 Edelhard Kynast Siemens AG, Energy.
 Transmitting power at high voltage and in DC form instead of AC is a new technology proven to be economic and simple in operation which is HVDC transmission.
Medium Voltage Outdoor Apparatus Portfolio
Queensland University of Technology CRICOS No J Protection of distributed generation connected networks with coordination of overcurrent relays.
Protection & Switchgear
Submitted to: Submitted by:
A PRESENTATION OF PRACTICAL TRAINING ON “400KV GSS “ \
A Presentation On 132 KV GSS BEHROR
Submitted to: Submitted by:
© ABB Power Technologies :\PTP\GF-CC\Arbetsmaterial Jan-16 HVDC Light – ABB’s technology for invisible transmission Per Haugland Head of ABB Power.
Air Blast Circuit Breaker
ON 400 KV GSS RAISER JAIPUR ROAD ,BIKANER
Department of Electrical Engineering
A Training Presentation On 220 KV GSS CHOMU,JAIPUR
A Training Presentation On 132 KV GSS JAIPUR Submitted in partial fulfillment For the award of the degree of BACHELOR OF TECHNOLOGY Submitted To:- Submitted.
132KV GSS PIPAR CITY JODHPUR
A SEMINAR ON 400 KV GSS(RRVPNL) BIKANER.
Submitted To:- Submitted By:- Mr.
Disconnector Switches and Earth Switches
Frankfurt (Germany), 6-9 June 2011 Romanens – CH – S3 – 0220 Impact of Distributed Generation on Grid Protection BKW FMB Energie AG Switzerland Florian.
Presentation Topic: Circuit Breakers Represented to: Dr. M. Riaz Khan Represented by: M. Mujahid.
MCB Connor, Sunny, Kia. What does it do? A circuit breaker is an automatically operated electrical switch designed to protect an electrical circuit from.
April 7, 2015 Washington, D.C. Area Low-Voltage Event Operations Training Seminar 2016 Erik Johnson System Operations Training (ERCOT)
SYNERGY INSTITUTE OF ENGINEERING AND TECHNOLOGY
RECENT TRENDS IN POWER SYSTEMS
V Winnipeg 2015 / Aug. 31 – Sept. 02 CIGRE Canada 2015 Conference No. 680 W.K.HVDC Engineering INNOVATIVE TECHNOLOGIES FOR STABLE ACDC TRANSMISSION SYSTEMS.
HVDC TRANSMISSION Under Guidance Dr. Shahnaz Ayub Er.Kamini Prajapati Submitted By Mayank Kumar
 The figure below shows a protection system for a transmission line, consisting of a CT, PT, a relay and its associated circuit breaker.
Solid state protective devices(SSPDs) for Next Gen MVDC architecture Presented By: Vikas Singh Advisor: Proff. Rob Cuzner.
SEMINAR PRESENTATIon ON C IRCUIT B REAKER DEPT. OF ELECTRICAL ENGG. JALPAIGURI GOVT. ENGG. COLLEGE PRESENTED BY Madhusudan Mahato Malay Ghosh.
Automatic Transfer Switches
Sub Station.
Devices used for Grid scale AC-DC and DC-AC power conversion
HVDC LIGHT:- NEW TECHNOLOGY FOR A BETTER ENVIRONMENT
SUB-STATIONS.
Study Committee Representatives Annual Meeting October 18, 2010 Winnipeg SC B4 “HVDC and Power Electronics” Activity Report Presented by: John McNichol.
Local Intelligent Circuit Breakers – A New Concept for the Refurbishment of Existing Distribution Network Pavel Novak – Germany – Session 1.
LV Safe Powering from UPS to Clients
Transmission Solutions
Circuit Breakers & Reclosers
Jürgen Häfner, R&D Manager - Projects, Power Systems - HVDC
High Voltage Power Circuit Breakers
Novel Protection Schemes for HVDC System
Sami Repo Tampere University of Technology FINLAND
High Current Direct Current (HCDC) Superconductor Cable
CIRCUIT BREAKERS E. Chikuni. Circuit Breakers Mechanical Switches capable of making and breaking currents under normal circuit conditions and for a specified.
0 Air Blast Circuit Breaker under the guidance of:- Presented By:- Mr. B.R.Reddy Anuj Kumar Pandey EN-3 rd year Roll No Unrestricted.
Substation Equipment's
Presentation transcript:

The pieces for offshore DC grids are almost in place. There are no technical barriers. Erik Koldby, ABB A/S, Bo Westman and Mats Hyttinen, ABB AB, EWEA

The DC breaker is often seen as a barrier to DC grids But DC switches have been in service since the 1970’s! A typical mechanical DC circuit breaker (MRTB) 4000 A, 125 kV Breaking time 40 ms Transfer breakers developed for bipolar LCC Today the solution is standard SF 6 AC circuit breakers with a passive or an aktive parallel LC resonanse circuit Principle for an active resonance mechanical HVDC circuit breaker But the breaking time make these solutions insufficient for DC grids  U DC  Cigré

© ABB Group Slide 3 PowDoc id  Fast:Breaking times of less than 2ms  PowerfulCurrent breaking capability of 16kA  EfficientTransfer losses are less than 0.01%  Modular Easily adapted to actual voltage & current ratings  ReliableProtective current limitation, functional check while in service  ProvenPower electronic design similar to converter technology  DC breakers are no longer a showstopper for large HVDC grids Hybrid DC breaker is well suited for HVDC grids © ABB Group Slide 3 11MR0339

© ABB Group Slide 4 PowDoc id Hybrid DC Breaker Fast breaking within time delay of selective protection  Normal operation: Current flows in low-loss bypass  Proactive control: Load commutation switch transfer current into Main Breaker switch, the Ultra Fast Disconnector opens with very low voltage stress  Current limitation: Main Breaker switch commutates fault current into parts of the sectionalized arrester bank  Fault clearance: Main Breaker switch commutates fault current into arrester bank © ABB Group Slide 4 11MR0339

© ABB Group Slide 5 PowDoc id A possible development: First Regional HVDC grids Can be built today with proven technology  A typical regional DC grid is defined as a system that constitutes of one protection zone for DC earth faults.  To temporarily and rarely lose the whole HVDC system has a limited impact on the overall power system.  Fast restart of the faultless part of the system  HVDC breakers are not needed  Normally radial or star network configurations  Limited power rating Regional DC grid with optimized voltage level. © ABB Group Slide 5 11MR0339

© ABB Group Slide 6 PowDoc id Line fault handling in regional DC grid DC earth faults vs other faults  DC earth faults  All AC breakers (X) open  DC switches (-) open and isolate the faulty part  Start-up of none-faulty part  Faults in controls, auxiliaries etc cause a trip of the converter:  The rest of the system continues without interruption  In point-to-point transmission, regional HVDC grids and interregional HVDC grids One protection zone for DC earth faults = ~ = ~ = ~ P1P1 P2P2 x x x = ~ = ~ = ~ P1P1 P2P2 x x x Several protection zones for faults in controls, auxiliaries © ABB Group Slide 6 11MR0339

© ABB Group Slide 7 PowDoc id Later step: An interregional DC grid  An interregional HVDC grid is defined as a system that needs several protection zones for DC earth faults.  Developments focus:  HVDC breakers and fast protections  Grid Power flow control/Primary control: automatic control  Master control: start/stop, re- dispatching  On-going Cigré WG B4.52 ”HVDC Grid Feasibility study” © ABB Group Slide 7 11MR0339

Example: 420 kV circuit breakers 1960s: Air blast 1970s and 1980s: Minimum oil 1980s and 1990s: SF 6 You know there will be development – you just do not know how and when – but behave like they did in the 50’es: Act on what is available. Europe needs the new grids! The lack of a DC Circuit breaker is no longer a valid excuse What will the future bring? Inspiration: Look back on AC circuit breakers

© ABB Group Slide 9 PowDoc id © ABB Group Slide 9 11MR0339