Presented to Vermont ASQ Section 112 21 Sep 2011 David Russo, CMQ/OE, CQA QMS Manager GE Healthcare.

Slides:



Advertisements
Similar presentations
Building a Cradle-to-Grave Approach with Your Design Documentation and Data Denise D. Dion, EduQuest, Inc. and Gina To, Breathe Technologies, Inc.
Advertisements

Accident and Incident Investigation
EMS Checklist (ISO model)
Checking & Corrective Action
LGC Future Leaders Network Monday, 19 th March 2012 Trevor Holden Chief Executive Luton Borough Council.
Three Mile Island (TMI-2)
Facility Authorization Basis at BNL Safety Photos of the Week Collider-Accelerator Department Take 5 for Safety.
In the Language Of The RAILS This Is Known As A HOT BOX !!!!!! The Good news: It was a normal day in Sharon Springs, KS when a Union Pacific crew boarded.
Accident Investigation Root Cause Analysis
NERC Lessons Learned Summary December NERC lessons learned published in December 2014 Three NERC lessons learned (LL) were published in December.
ISO 9001 : 2000.
Supplier SQM Participation. 2 | MDT Confidential What is SQM? Stands for Supplier Quality Managment –Formally referred to as SPACE and SPICE Is a system.
Corrective & Preventive Action Programme l Corrective and preventive action managed by one programme l Closely linked to the internal audit programme l.
Chapter 8: Quality Management Project Quality Management
Effective CAPA Program, a Valuable Tool in Quality Improvement Dharmi Trivedi.
ISO 9000 Certification ISO 9001 and ISO
ISO Standard is based on the management model of plan – do - check – act. Today we all be discussing the elements of the standard that deal with.
4. Quality Management System (QMS)
Five Star Quality Consultants Implementing ISO 9001 Corrective and Preventive Action.
© 2009 Michigan State University licensed under CC-BY-SA, original at Corrective Action.
Managing Project Quality
QUALITY MANAGEMENT SYSTEM ACCORDING TO ISO
Project Quality Management
The Role of the Internal Auditor for Maintaining System Compliance and Promoting Continuous Improvement Wayne M. Uttke
WHAT’S WRONG WITH THIS PICTURE???? Environmental Trainers, Inc. 101 South Jennings, Suite 211 Fort Worth, Texas Prepared for the North.
Basics of OHSAS Occupational Health & Safety Management System
Top 10 Medical Device Citations
1 Accreditation and Certification: Definition  Certification: Procedures by which a third party gives written assurance that a product, process or service.
ISO 9001:2000 QUALITY MANAGEMENT SYSTEM REQUIREMENTS
Creating a Risk-Based CAPA Process
ERT 312 SAFETY & LOSS PREVENTION IN BIOPROCESS RISK ASSESSMENT Prepared by: Miss Hairul Nazirah Abdul Halim.
ERT 322 SAFETY AND LOSS PREVENTION RISK ASSESSMENT
Nuclear Power as a High Risk System And the Accident at Three Mile Island Discussing Perrow Chapters 1 and 2 Presented by Gus Scheidt Friday the Thirteenth.
By Matt Douglass.  The Three Mile Island accident was a partial nuclear meltdown which occurred in one of the two Three Mile Island nuclear reactors.
Hazards Identification and Risk Assessment
ISO NON-CONFORMANCE, CORRECTIVE AND PREVENTIVE ACTION.
Measure : SPC Dedy Sugiarto.
Palabon, Pangatungan, Aloyodan and Eblamo October 14, 2014 Safety Management.
Project quality management. Introduction Project quality management includes the process required to ensure that the project satisfies the needs for which.
ISO DOCUMENTATION. ISO Environmental Management Systems2 Lesson Learning Goals At the end of this lesson you should be able to:  Name.
It was a normal day in Sharon Springs, Kansas when a Union Pacific crew boarded a loaded coal train for the long trek back to Salina. Just a few kilometres.
Software Quality Assurance SOFTWARE DEFECT. Defect Repair Defect Repair is a process of repairing the defective part or replacing it, as needed. For example,
1 Beth Staub and Joseph Sapiente FDA Case for Quality.
Traditional Economic Model of Quality of Conformance
Checking and Corrective Action EPA Regions 9 & 10 and The Federal Network for Sustainability 2005.
Ta’Juan Dutrieuille November 4, 2009 Period 1
Corrective and Preventive Action
GMP Regulatory Perspective Dr. Pooja Mahadev Shirodkar Wallace Pharmaceuticals Pvt. Ltd. Date:
OHSAS Occupational health and safety management system.
WORKSHOP ON ACCREDITATION OF BODIES CERTIFYING MEDICAL DEVICES INT MARKET TOPIC 9 CH 8 ISO MEASUREMENT, ANALYSIS AND IMPROVEMENT INTERNAL AUDITS.
QSB Quality System Basics & Q7 tools in practice
Supplier Corrective Action Request (SCAR) Supplier Training
WORKSHOP ON ACCREDITATION OF BODIES CERTIFYING MEDICAL DEVICES INT MARKET TOPIC 6 CH 5 ISO MANAGEMENT RESPONSIBILITY Philippe Bauwin Medical.
Process Safety Management Soft Skills Programme Nexus Alliance Ltd.
Version 1.0, May 2015 BASIC PROFESSIONAL TRAINING COURSE Module XX Regulatory control Case Study This material was prepared by the IAEA and co-funded by.
Root Cause Analysis Roger Brauninger
8.1 Plan Quality Management
Software Quality Assurance
Quality Risk Management
OPS/571 Operations Management
KMCO CAPA System Training
Director, Quality and Accreditation
DMAIC Analyze, Improve, Control
DMAIC STANDARD WORK TEMPLATE
DMAIC STANDARD WORK TEMPLATE
BASIC PROFESSIONAL TRAINING COURSE Module XX Regulatory control Case Study Version 1.0, May 2015 This material was prepared by the IAEA and.
CAPA, Root Cause Analysis, and Risk Management
Supplier Corrective ACTION RESPONSE REVIEW TRAINING
Presentation transcript:

Presented to Vermont ASQ Section Sep 2011 David Russo, CMQ/OE, CQA QMS Manager GE Healthcare

ISO 9001 (13485): “The organization shall take action to eliminate the cause of nonconformities in order to prevent recurrence.” CFR: 21 CFR (Medical Device) “(a) Each manufacturer shall establish and maintain procedures for implementing corrective and preventive action”

Unexpected, unwanted events with a Quality System. ASQ: The result of a nonfulfillment of a specified requirement.

A mature CAPA system can serve as a useful tool for analyzing past events, correcting existing non conformities and preventing future events. A mature CAPA system goes beyond regulatory compliance to positively impact our customers by increasing the value of our products and services.

Event-chain based NC investigation typically looks back at a series of adverse events to "assign blame" to a person or device Example; Three Mile Island (1979) Summary of Events The accident began about 4:00 a.m. on March 28, 1979, when the plant experienced a failure in the secondary, non ‑ nuclear section of the plant. The main feed water pumps stopped running, caused by either a mechanical or electrical failure, which prevented the steam generators from removing heat. First the turbine, then the reactor automatically shut down. Immediately, the pressure in the primary system (the nuclear portion of the plant) began to increase. In order to prevent that pressure from becoming excessive, the pilot- operated relief valve (a valve located at the top of the pressurizer) opened. The valve should have closed when the pressure decreased by a certain amount, but it did not. Signals available to the operator failed to show that the valve was still open. As a result, cooling water poured out of the stuck-open valve and caused the core of the reactor to overheat.

What happens when the system is at fault? Example: Consider an example of a industrial accident that occurred in a batch chemical reactor in England The computer was responsible for controlling the flow of catalyst into the reactor and also the flow of water into the reflux condenser to cool off the reaction. Additionally, sensor inputs to the computer were supposed to warn of any problems in various parts of the plant. The programmers were told that if a fault occurred in the plant, they were to leave all controlled variables as they were and to sound an alarm. On one occasion, the computer received a signal indicating a low oil level in a gearbox. The computer reacted as its requirements specified: It sounded an alarm and left the controls as they were. By coincidence, a catalyst had been added to the reactor, but the computer had just started to increase the cooling-water flow to the reflux condenser; the flow was therefore kept at a low rate. The reactor overheated, the relief valve lifted, and the contents of the reactor were discharged into the atmosphere Leveson, Nancy G. A New Accident Model for Engineering Safer Systems. SafetyScience, 42(4), April 2004, pp. 237–270)

CAPA Process - structured, formalized way to investigate NC and determine appropriate corrections, corrective actions and preventative actions and measure their effectiveness. (With records)

Each step can use quality tools to standardize the approach and document the outcomes. ISO and QSR require records of each step

QMS has systems to detect NC Customer Complaints Equipment Monitoring Production Sampling Auditing Inspection Trending Accident Report Etc… Output = Specific Problem Statement

Where, Who, Risk, Compliance? Is/Is Not Contradiction Matrix Expert Interviews Data/Trends Data/Records Timeline Evaluation rubric may be defined by your QMS (severity, probability of harm, $$ exposure) Keep records

Determine what happened, how it happened, extent, identify true root cause(s) Seven classic quality tools (ASQ) Flowchart Checksheet Cause/Effect diagram (Ishikawa, fishbone) Pareto chart Control chart Histogram Scatter Diagram More tools 5-whys Is/Is-not Contradiction matrix Keep Records

Lists corrective and preventive actions (if applicable)Clearly addresses root causes Commensurate with the risk of the issue Where effectiveness checks are defined Identification of task owners and task due dates Implementation due date Keep records

Action (Plastic part had air content over spec limit)C, CA, PA Rewrite procedure for mold setupCA Rewrite procedure for inspection processCA Poke yoke process for ensuring proper ratio mixCA Containment: identify potentially affected products and recallC Error-proof the monitoring processCA Design new products to not need air in the mold processPA

Implementing a verified solution Testing during formation of action plan Validate Tracking (where, how many, who) Keep records

Monitor performance indicators à compare “before” and “after” Achieve specific targets -- achieving a pre-determined PPM level Statistical Data Analysis-- Performance must lie within a set of statistically derived control limits Emphasis should primarily be on identifying the most effective fix Verification and validation are completed prior to implementing the action Keep records

17 miles east of Sharon Springs, Kansas a loaded coal train from Denver to Chicago. A wheel bearing became overheated and melted off letting the truck support drop down and grind on top of the rail creating white hot molten metal droppings that spewed down onto the rails. The alert crew noticed a small amount of smoke halfway back in the train and immediately stopped the train in compliance with the rules.