BUILDING PERMITS. WHY DO YOU NEED PERMITS? Building permits allow your municipality to protect the interests of both individuals and the community as.

Slides:



Advertisements
Similar presentations
Golf Course Construction Planning TRF 250 Golf/Sports Field Construction.
Advertisements

Building Code II ARC313. Building Code sets out technical requirements for the construction, renovation and demolition of buildings sets out technical.
Historic flooding in Otter Tail County. Overview  Extent of flooding  Options investigated  Proposed solution.
As presented by: Rodger Schuldt TCEQ Installer II License # OS19898 TCEQ Maintenance Provider License # MP00545 TCEQ Site Evaluator License # OS20270.
Central Massachusetts Regional Stormwater Coalition Part 2 Sump Pump Discharge Policy September 26, 2013 Community Innovation Challenge Grant 2013.
KELLY HART & HALLMAN LLP MATRIX OF LEGAL AUTHORITIES Home Rule Cities (Austin; Kyle) General Law Cities (Dripping Springs; Bee Caves; Rollingwood; Buda;
By: Jenna Hart, Jill Meltzer, Madison Herling, Ben Miller.
Cairo University Faculty of Engineering Petrochemicals Engineering Plant Layout May 2010.
Deborah Gore Division of Water Resources. G.S C (a1) Report Discharge of Untreated Wastewater to the Department Permit issued under this Part.
BUILDING PERMIT PROCESSING RATIONALE ( Lease Agreement, article on Miscellaneous – Improvements) “ The LESSEE shall not make any structural changes,
Overview the local, state, and federal regulatory authorities which affect the interim housing mission Identify vital stakeholders with regulatory authority.
Lakeshore Development Guidelines A Primer Charlie Lake Conservation Society September 2007.
Department of Water Resources Urban Streams Restoration Program Working Together To: Restore Watersheds Reduce Property Damages Renovate Town Centers.
Permits. The Process Plans are developed by an Architect or Engineer and presented to the Municipality – State Environmental Quality Review (SEQR) declaration.
Connecticut Department of Energy and Environmental Protection.
NON-RENEWABLE POWER RESOURCES: Fossil fuels. Non-renewable Power Resources  Most important power resources in the world at present  Heavy reliance on.
Land Use and Restrictions.  The municipal government is the main source of land use control  Why is the main source of land use control the municipal.
1 Sustainability & Environmental Management System (SEMS) Contract Specialist Focus Wednesday, July 18, 2012 Colorado Room Call-In #: ______________ Passcode.
Residential Construction Unit 1 Mr. Todzia.  Definition-Legal requirements designed to protect the public by providing guidelines for structural, electrical,
1 Implementing the Municipal Plan. 2 Overview The plan is a vision that must be implemented Many methods of implementation Communities must work to find.
BUILDING STRONG ® 1 Regional General Permit (RGP) 31 Interagency Meeting June 11, 2015.
McCoy Field Proposed Keith Middle School Site EPA Proposes Approval of McCoy Field Cleanup Plan.
RIPDES Storm Water Program: Large and Small Construction.
© OnCourse Learning Chapter 25 : Land-Use Control.
Team Tech meeting May 22, 2006 State Traffic Commission & DEP Storm Water Permitting State Traffic Commission Permitting & Storm Water Permitting State.
Sanitary Engineering Lecture 11. Storm Water Runoff Storm water runoff is the precipitation which seeps into the ground if precipitation occurs faster.
What does PWD do for our City?. Administrative Services Engineering Operations.
Mr. Brad Dearing 108 University High School Normal, IL (309) Architectural Design.
Department of Public Works Public Buildings Division Joey Duncan, P.E., Director.
Building Permits for Solar Domestic Hot Water Systems Ted Van Vliet Toronto Building October 1 st, 2008 Presented at Solar Neighbourhoods Contractor Workshop.
Renewable Energy at Closed Landfills Workshop: Landfill Post Closure Use Permitting Guidelines June 17, 2009 Mark Dakers, Environmental Analyst Massachusetts.
Code Officials and the Code Process.  To design the interior of the building in conjunction with codes, standards and federal regulations required in.
The ABC ’ s of the Development Review Process: Navigating the Bureaucratic Maze 2007 GPA Fall Conference.
Environmental Toolbox. Technical Module Introduction.
©2011 Cengage Learning. Chapter 15 ©2011 Cengage Learning REQUIRED GOVERNMENT REPORTS.
FME: The Catalyst for a Multi- Participant Hazardous Spills Database for Peel Region Doug Seaborn Project Lead: Enterprise GIS Development & Deployment.
Cumberland Park CCB Project Virginia Department of Environmental Quality October 9, 2007.
Environmental Legislation & Regulations Ecology and the Environment Mr. Corsini - NWHS.
INFORMATIONAL MEETING AGGREGATE OPERATION PROPOSAL Add picture.
Kentucky Growth Readiness for Water Quality Does your water quality matter?
Prof Ralph V. Locurcio, PE CON 2001 CVE Sequence Single Family House - 3,000 square feet Duration 1 General Conditions 21 2 Apply for Permits.
3/20/11 ALCPG11 Global Design Effort 1 CFS Detector Hall Considerations Tom Lackowski.
SECOND UNITS IN BRAMPTON BREB BUSINESS BREAKFAST October 8, 2015.
Cassidy Elementary – Renovation Architect: Tate.Hill.Jacobs: Architects General Contractor: D.W. Wilburn, Inc. Substantial Completion Date:August, 2010.
IT’S THE 11 TH HOUR And General Engineering is … HOLDING US UP!
Primary Considerations Site Considerations The community “Planned community” or no thought? Price range? Socio-economic category? Alive or dying community?
Code Officials and the Code Process.  Concentrates on the code process as a whole.  Different type of code officials  Various steps that are taken.
Hillsborough Building & Planning. Green Building 101  Efficiency of buildings and responsible use of water, and construction materials  Reducing building.
Permit Process & Application Guide
What is Stormwater? Direct result of rainfall Recharges groundwater by infiltration Produces “runoff” (excess rainfall after infiltration) May be concentrated.
Fundamental Concepts for Design of Special Hazard and Fire Alarm Systems Chapter 1.
Local Development (San Diego)  Development Services is responsible for managing the majority of the construction and development project review services.
2015 Annual Financial Report December 31, Total Revenue $13,068,887Total Expenditure $14,006,870 Revenue Budget $14,957,884Expenditure Budget $15,669,564.
Regulation of land use and building activities
How to Protect the Local Environment
Major Steps In Building a SFR
Construction Documents
St. Croix County Board of Adjustment
Design of a Commercial Shopping Center
ET 494: Senior Design Design of a New Hammond Head Start Center
Global Connections Day Building Safety Service Provider
Canyons Golf Hole 12 Comfort Station Special Exception
FLOODPLAIN MANAGEMENT FEMA and the Florida Building Code
Regional Inspection services
Regulation Amendment AM April 3, 2018.
Understanding Construction Codes
CONSTRUCTION REGULATIONS AND CODES
WPVAR (Greenview HOA) Washoe County Board of Adjustment March 7, 2019.
10 Feet Cistern, clear water drain
Council Orientation October 24, 2017
Presentation transcript:

BUILDING PERMITS

WHY DO YOU NEED PERMITS? Building permits allow your municipality to protect the interests of both individuals and the community as a whole. Interests such as: Proposed building meets health and safety, fire, accessibility and resource conservation Zoning by-laws are kept Other applicable legislation : Environmental Protection Act (EPA)

When do you need to apply for a permit? Structure is more than 10 m 2 or 100 square feet. Renovations or repairs Excavate or construct a foundation Construct a seasonal building (greenhouse)

What inspections are required to comply with my building permit? 1.Storm and sanitary sewer connections/waterline OR septic system/weeping bed prior to backfill (separate permit required) 2.Footing (prior to pouring concrete) 3.Foundation (prior to backfilling) 4.Underground plumbing 5.Framing 6.Rough-in plumbing 7.Heating, Venting and Air Conditioning (HVAC) 8.Insulation and Vapour Barrier 9.Fire separations, Access routes, Protection systems 10.Inspection of solid fuel fireplaces, woodstoves 11.Occupancy permit (include final plumbing and septic inspections) 12.Final inspection

What other permits do you need? Electrical Safety Authority (ESA)Electrical Safety Authority (ESA) - enforces electrical safety and requires electrical permits on projects where new, renovation, or maintenance work is being done on electrical systems. Entrance permit – depending on location of site, road access must be completed and passed.

Permit continued: Conservation Authority – if you are building near water (lake, river, creek, or drains) you will need approval and permits from the local conservation authority for flood/fill line. Unrestricted development within a floodplain can result in flood damage to buildings and threaten public safety. Development can also affect neighbouring properties both upstream and downstream by changing the physical characteristics of the floodplain and the watercourse. Fill placed on a valley slope can aggravate existing erosion problems or create new ones.

What other approvals may you need? In addition to the planning approvals and building permit which are required for a building project, other permits and approvals may be required in particular circumstances, e.g., Conservation Authority and Ministry of Transportation approvals. These approvals are considered applicable law.

What about industrial/commercial/agricultural stuctures? The structures require special approvals or permits before or during construction of the project: 1.Pre-start health and safety review 2.Building health and safety inspections (sort of a secondary inspection of electrical, fire as well as health and safety during construction) 3.Technical safety inspections and approvals (ski lifts, amusement parks, elevators, fuels, boilers)