2 BUILDING PERMIT PROCESSING

3 RATIONALE ( Lease Agreement, article on Miscellaneous – Improvements) “ The LESSEE shall not make any structural changes, alterations, additions or improvements on the Leased Properties without the prior written consent of the LESSOR…”

4 New Construction/Renovation Permit Demolition Permit Excavation, Ground Preparation or Soil Investigation Permit Fencing Permit Repair/Repainting Permit Occupancy Permit TYPES OF PERMIT

5

6

7

8

9

10

11 PRE-REQUISITE TO ISSUANCE OF BUILDING PERMIT Contract of Lease/Authority to Construct Zoning and Land Use Clearance from P.D.O. Compliance to Ecology Center’s Environmental Requirements Compliance to Technical Requirements from other Departments

12 EXEMPTIONS Sheds, children’s playhouses and the like, not exceeding 6 sq.m. Open terraces or patios not exceeding 20 sq.m. Installation of window grilles Replacement of deteriorated roofing sheets, tiles, gutters, etc. Repair of any interior partition not involving addition or alteration Repair and replacement of plumbing and electrical line and fixtures

13 Application of Permit Building Permit Section Project Development Division Engineering Department Rm. 220, Bldg. 255 Barryman Road, SBFZ Tel. No. 252 4015

14 Building Permit Process

15 START Submit Documents to Eng’g Dept. Applicant Housing – SBIP Construction? Submit to LADD Housing Office / SBDMC Eng’g. Applicant 1 Yes No

16 1 Complete ? No Yes 2 Return Documents To Applicant Engineering Department END

17 2 Receive Documents Engineering Department Recording Engineering Department 3

18 3 Review Plans & Documents Engineering Department Ecology Center Fire Department Utilities Department Land & Asset Devt. Dept. Public Health & Safety Dept. Subic Water. Co. Planning & Development Office Law Enforcement Department Subic Telecom Coastal Petroleum Port Engineering 4

19 4 Complied ? Summarize Findings Write to Locator Engineering Department No END 5 Yes

20 5 Building Permit Fee Assessment Engineering Department D.A. ‘s Approval? 6 No

21 6 Summarize Findings Write to Locator Engineering Department END

22 5 Building Permit Fee Assessment Engineering Department D.A. ‘s Approval? 6 7 No Yes

23 7 Payment of Building Permit Fee Treasury Department Release Building Permit / Recording Engineering Department END

24 Time Frame 15 DAYS