National Water Investment Framework & Strategy Advanced Product 2 Steering Committee Meeting & Work Session 26 January 2012.

Slides:



Advertisements
Similar presentations
Review Municipal Infrastructure Grant Policy Framework Review
Advertisements

Regional Bulk Infrastructure Grant / Programme (RBIG) Grant and Policy
INITIATING THE PLANNING PROCESS. CONTENT Outputs from this stage Stage general description Obtaining government commitment Raising awareness Establishing.
OUTCOMES AND STRATEGIC ISSUES FROM THE MCC WSLG 19 November
SIP 18 WATER AND SANITATION MASTER PLAN Water and Sanitation Master Plan NDHS and DWA Water & Sanitation Master Plan.
1 Alignment to the Local Government Turn Around Strategy (LGTAS)
About Presentation About Rand Water Rand Water and MDGs Economic Policy and Implications Rand Water and its Role in Africa Conclusion.
National IWRM plans; links with Water Supply and Sanitation Palle Lindgaard Jørgensen Technical Secretariat Yerevan, 13 December 2006.
PRESENTATION TITLE Presented by: Name Surname Directorate Date Water Risks in South Africa, with a particular focus on the “Business Health” of Municipal.
Shaping the Future of Water Services
Tseliso Ntili Provincial Head: Department of
DEPARTMENT OF WATER AFFAIRS
Hearings on the FFC recommendations on the Division of Revenue 2010/2011 Presentation by Department of Water Affairs 19 August
National Investment in Water and Waste Water Infrastructure, Funding & Pricing Mid-West Regional Authority Annual Conference 2009.
Water sector leadership group 19 November 2009 progress report on the water security strategic task team (STT) Martin Ginster.
Municipal Infrastructure Grant Sport and Recreation 15 February 2005.
Challenges to purchase/release of Land & Buildings for Sustainable Human Settlements Presentation to the Portfolio Committee on Public Services 10 September.
IDP Conference 2004 “Developmental Governance in Action” SESSION 7: Integrated Governance: > Inter-Governmental Planning Framework (IGPF) – A National.
LOCAL GOVERNMENT INFRASTRUCTURE NEEDS vs DEVELOPMENT CHARGES.
Water Services Reform – the Durban experience : successes and challenges Neil Macleod Durban South Africa.
ECONOMIC GROWTH & ENHANCED LOCAL PARTICIPATION THROUGH INFRASTRUCTURE DEVELOPMENT INTEGRATING INFRASTRUCTURE DELIVERY TOWARDS 2030 CJ Venter 05 October.
Click to edit Master subtitle style 6/3/11 Presentation to the Select Committee: Land and Environment Presentation by Department of Water Affairs 31 May.
TOWARDS THE CITY OF CAPE TOWN INTEGRATED SUSTAINABLE HUMAN SETTLEMENT WESTERN CAPE SUSTAINABLE DEVELOPMENT CONFERENCE: 21 JUNE 2005 DIRECTOR: HUMAN SETTLEMENTS:
Institutional Development for Improved Water Quality | November 2010 Operation and Maintenance for Safe Drinking Water – Institutional development to achieve.
INITIATING THE PLANNING PROCESS. CONTENT Outputs from this stage Stage general description Obtaining government commitment Raising awareness Establishing.
Municipal Water Infrastructure Grant Standing Committee on Appropriations Presenters: Marissa Moore and Steven Kenyon | National Treasury | 5 March 2013.
5/12/10 Artist ’ s impression of De Hoop Dam Olifants River Water Resources Development Project (ORWRDP) 1 Presentation to the Standing Committee on Appropriations.
1 Presentation By: Mr.O. Aphane Acting Deputy Director General: Electricity, Nuclear and Clean Energy (on behalf of the Director General, Ms N Magubane)
1 Water Services to Schools and Clinics Programme 20 June 2007 Presentation to Select Committee on Education and Recreation By DWAF.
Click to edit Master subtitle style 11 Capacity Development and Deployment Siyenza Manje Programme Presentation to Select Committee on Finance DBSA 01.
Water Resource Management: Strategic Issues & Perspectives Fred Van Zyl Department of Water Affairs 30 April
1 Presentation to the Portfolio Committee: Water & Environment Presentation by Mr Trevor Balzer Programme Manager: Special Projects 16 – 17 March 2010.
Meeting the Challenges of the Changed Economic Environment Annual Conference September 2009 Water Services Training Group 13 th Annual Conference 10 th.
2008 Electricity Distribution Maintenance Summit Stream 3A: Funding, Investment and Financial issues 10 June 2008 Theo van Vuuren Divisional Executive.
1 PIDA in the Energy Sector AfDB/AUC Workshop 17th UPDEA Congress Tunisia, 29 May 2012 Interconnecting, Integrating, and Transforming a Continent.
DCoG Presentation to the Appropriations Committee HEARINGS ON THE MEDIUM TERM BUDGET POLICY STATEMENT 2 November 2010.
Overview: Budget Vote No.37 Presentation to the Select Committee on Land and Environmental Affairs (NCOP) Presentation by Ms N Ngele Director-General (Acting)
Consultant Advance Research Team. Outline UNDERSTANDING M&E DATA NEEDS PEOPLE, PARTNERSHIP AND PLANNING 1.Organizational structures with HIV M&E functions.
1 Presentation to the Portfolio Committee: Water & Environment Presentation by Mr Trevor Balzer Programme Manager: Special Projects 16 – 17 March 2010.
Presentation to Joint Budget Committee on: Urban Renewal and Rural development NATIONAL DEPARTMENT OF HOUSING.
Hearings on the LandCare Conditional Grant: 2010/2011 & 2011/2012 First Quarter Ms Nandi Mayathula-Khoza, MEC GAUTENG DEPARTMENT OF AGRICULTURE AND RURAL.
1 Response to Financial and Fiscal Commission Submission for The Division of Revenue 2010/2011 Presentation to Select Committee on Finance 06 August 2009.
STANDING COMMITTEE ON APPROPRIATIONS Presentation by Nthabiseng Fundakubi Acting Chief Operating Officer 11 February Challenges and Opportunities.
Tshepo Makhanye Information Section: Research Unit.
1 Local Government Budgets and Expenditure Review 2001/02 – 2007/08.
PROVINCIAL INFRASTRUCTURE GRANT NCOP 06 March 2006.
Water and the New Growth Path - DWA Response - 16 February 2011 Fred van Zyl.
Public Hearings on Division of Revenue Bill, 25 February 2009 Presentation by Department of Water Affairs and Forestry 1.
1 Select Committee on Economic Development Progress relating to the implementation of Integrated National Electrification Programme (INEP)
PRESENTATION TO THE PARLIAMENTARY PORTFOLIO COMMITTEE ON PUBLIC WORKS 18 Feb 2004 CAPE TOWN PRESENTATION TO THE PARLIAMENTARY PORTFOLIO COMMITTEE ON PUBLIC.
MHPP Forum James Shuttleworth Planning and Infrastructure Manager, MCC 9 December 2015 Greater Manchester Spatial Framework.
@ContentsExecutive Summary Annexures A M A J U B A Umkhandlu Wesifunda District Municipality Distrik
Presentation to the Portfolio Committee on Energy
Municipal Water Infrastructure Grant (MWIG)
Danube Water Conference 2017, Vienna
ELECTRICITY DISTRIBUTION INDUSTRY DECISION
RESTRUCTURING OF THE ELECTRICITY DISTRIBUTION INDUSTRY
Overview of the CoJ Water & Sanitation Master Plan
Presentation by Department of Water Affairs
Presentation to the Portfolio Committee: Water & Environment
SALGA Comments on LG Grants Division of Revenue Bill, 2011
Collaboration with other government entities
Water and the medium term budget policy statement
Presentation by Department: Water Affairs 22 March 2011
Water Quality and Water Security towards a joint action plan to continue to improve the quality of life of SA’s people through improved water quality.
2018/19 ANNUAL PERFORMANCE PLAN FOR MISA
KIRIBATI IW R2R PROJECT OUTLINE OF PRESENTATION: PROGRESS
PROGRAMME 3 WATER SERVICES
INGONYAMA TRUST BOARD’S ANNUAL PERFORMANCE PLAN
Water Services Targets
Presentation transcript:

National Water Investment Framework & Strategy Advanced Product 2 Steering Committee Meeting & Work Session 26 January 2012

1. Overarching Purpose To develop and maintain a dynamic comprehensive National Water Investment Framework/Strategy/plan 2

2. Purpose of Meeting To obtain a common understanding of the purpose and drivers (mandate) as well as scope, principles and format of the product/programme To obtain guidance on product design To facilitate extended and improved information input To facilitate effective output, ownership and application

3. “Drivers” for Developing an Investment Framework National Treasury requirement (national funding is conditional to submitting an Investment Framework) Legal requirement: NW Act requires a development plan Component of NWRS-2 (investment component and impementation costing) Socio-economic development & outcomes demand integrated infrastructure delivery plans ) Various programmes require special investment (e.g. Basic services, wastewater management, disaster management, asset management, demand & conservation management)

“Drivers” for Developing an Investment Framework ( cont) Outcomes 6,7,8,9+10 programmes demand infrastructure investment frameworks & programmes All major project developments (e.g. de Hoop Dam, water reconciliation studies) demand investment frameworks Poor track-record & challenges: under utilized dams & systems, housing with no services The application of “source-to-tap, tap to source“ management principle It is a logical business approach (appropriate planning and solutions Cabinet Lekgotla requirements Funding negotiations, need for asset mangement

4. Response ? No comprehensive response and system Ad hoc products, ad hoc development Lack of co-ordination, frustration NOW: top priority, urgency, high expectations!!!!!!!!!!! Include job creation, fuctionality 6

Development process 1 DWA workshop June 2011 Development of “first order high level business case” and framework: – DBSA responsibility (as per MoU) – Quick win (based on available information –no research; no development support) – Support task team established – Product developed (As per DBSA)(August/Sept 2011) – Product incomplete 7

5. First order product & perspective Based on input received as per workshop (DWA, Water Boards, TCTA, MIIF) Focus on National and Municipal infrastructure Spread sheet data base with development time frame for water resources infrastructure High level national perspective (limited spatial, institutional and project presentation) Limited timeframe Limited validation (comprehensive municipal data base) 8

Financial perspective: first order development Capital requirements R573 b is required over 10 years (R58b/a) R573 b is required over 10 years (R58b/a) R254 b available from present funds over 10yrs (R26b/a) R254 b available from present funds over 10yrs (R26b/a) Deficit = R319 b (investment must double to meet development and refurbishment requirements) (R32b/a) Deficit = R319 b (investment must double to meet development and refurbishment requirements) (R32b/a) Water resources bulk capital requirement = R16.2b/a vs R11b/a available Water resources bulk capital requirement = R16.2b/a vs R11b/a available Water services requires R394b over 10 years (excludes major turn around investment eg Waste water works) Water services requires R394b over 10 years (excludes major turn around investment eg Waste water works) Need to invest in dedicated programmes eg demand & conservation management Need to invest in dedicated programmes eg demand & conservation management Based on essential requirements Based on essential requirementsAction: Differentiated approach to address unique needs in rural & urban Differentiated approach to address unique needs in rural & urban Financing and tariff model to be development to identify and mobilize alternative funding Financing and tariff model to be development to identify and mobilize alternative funding Ring fencing of water services financial management to enhance self-financing and viability Ring fencing of water services financial management to enhance self-financing and viability Improve investment funding & grants (outcome 9.2 action) Improve investment funding & grants (outcome 9.2 action) Stretch existing financing through effective water use and infrastructure maintenance Stretch existing financing through effective water use and infrastructure maintenance Prevent leakage of available financing through effective financial management Prevent leakage of available financing through effective financial management

6. Existing Task Team DWA, DBSA and TCTA Initial purpose was to facilitate specific component input to DBSA However: need was identified to develop a comprehensive system (“as per drivers” and mandate) Actions extended to also develop the concept, scope and format Actions initiate to develop an advanced intermediate product by March 2012 and a comprehensive dynamic system by March

h 6. Framework design and approach Framework vs strategy vs plan Investment framework = Infrastructure plus business plus people plus institutional and governance Total value chain (source to tap to outcome to source) Includes outcome, technical, management, institutional and financial information and perspectives Existing,5y MTEF, 10y and longer term perspectives 11

h (2) 6. Framework design and approach (2) All water related sectors value chains (municipal, agriculture, energy, industry, etc.) including outcome alignment Spatial orientated and reflected Funding and financial model Strategic analysis and perspectives Prioritization and appropriate solutions (modeling) National to project level perspectives Project status, information Accessibility and deliverables 12

Total sector perspective 13 regional local national municipal agriculture energy industry other waste Water resource

Investment Framework 14 Macro WR Local WR Reg bulk Int bulk reticulation energy Agriculture supply waste Governance & management existingimpl commit ted reality future

Investment model 15 Value chain Development status technical financial management institutional

Investment Framework 16 Macro WR Local WR Reg bulk Int bulk reticulation energy Agriculture supply waste Governance & man existingimpl commit ted reality future

17

7. First order product: gaps Only water resources and municipal water services perspective Lack of regional and spatial perspective Still need local validation and alignment Extensive municipal information but requires strategic assessment and alignment Municipal information based on MIIF modelling Still need financing modelling and perspective Operations and maintenance, governance and programme costing not addressed Limited prioritisation and scheme alignment 18

7. Development process 2 Need to develop comprehensive and functional (live) framework and system: – Major expectations (Cabinet, Minister, NT) – Concept and framework developed – Extended (intermediate) product initiated (limited time frame) – DBSA support – Comprehensive business framework well advanced and development programme 3 underway Extended task team 19

7. Development process 2 Establish extended task team: – Technical theme champions – Business and governance champions/role players – Sector partners and champions – Strategic and decision making/enabling partners Consolidate and align existing programmes and initiatives 20

8. Activities 21 Integrated system and data base (PSP) 1 1 Spatial information system 2 2 Financial model Strategic assessment Functional & sector output Action 1 Action 2 Action 3 Action 4 Action 5 Action 6

Existing programmes and activities Macro programmes (NGP, Vision 2030, Cabinet, Outcomes 6,7,8,9,10; job creation) Sector programmes (energy, electricity, agriculture and food, municipal, mining, schools, health, environment, housing, rural development, Cabinet Lekgotla: 22 DMs plus..) National water infrastructure, water resources planning, all towns studies, reconciliation studies, bulk infrastructure programme, basic services, infrastructure asset management, Waste water systems /water supply, under utilised dams 22

Existing programmes and activities 2 Water quality (resource) and resource protection Governance programmes (monitoring networks, regulations, water use efficiency) NWRS 2 costing Enabling strategies and programmes: institutional, skills development, financial model and tariff strategy Feasibility studies, budgets, development plans Implementation projects MIIF, asset management plans and programmes 23

9. Development examples 24

Large Water Resource Infrastructure Projects 25 R162 billion investment required over 10 years

Spatial targeting to ensure water security for main socio-economic hubs Water Reconciliation for main growth areas Legend Study Focus Areas Economic Growth Areas Economic Value of Growth Areas

All town study: Water resource intervention

28 Developing Water Solutions for each Town by 2012 (e.g. Free State) 22 towns in Free State require immediate water resource solutions

29 Regional Bulk Infrastructure

30 Bulk cost perspectives & RBIP projects TypeFunding Needs Regional bulkR75b Internal supplyR60b SanitationR37b Total for 10 yrsR172 b Location of current RBIG projects Total R/10yr Annual R/a RequiredR172bR17b/a AvailableR120bR12b/a DeficitR52bR5/a

31 Informal Settlements

Wastewater Treatment Works : Performance Rating 32 Combined Rating of: capacity exceedance effluent compliance skills deficit delivery & functionality Total WWTW = municipal works 14% good/excellent 56% very poor / critical

Mtata Dam: Communities in need 33

34

Municipal Investment Requirements : Metros & Cities Smal & medium Towns Rural Focus on new & refurbishment Focus on backlogs & refurbishment Growth /New Backlogs Rehabilitation

Actual Required Municipal Water Supply Investment Requirements (bulk investment and rehabilitation are critical) R7b/a Deficit

Rural areas are currently not supported by bulk infra & service management: Action: develop institutional model (bulk water utilities?) develop financing model (existing schemes subsidize new schemes?) political endorsement (performance agreements)

Water Supply - key challenge areas & situation Issue: Access to basic water supply ( 59% of households in 1994 to 94% in 2011) Access to basic water supply ( 59% of households in 1994 to 94% in 2011) Formal backlog as per approved RDP standard (0,82 mil households = 6%) Housing related needs (2,3mil new houses with associated services) Requires major infrastructure & financial investment (R62 bil deficit) Based on available funding & implementation capacity 2014 targets cannot be met Drinking water quality Drinking water quality Only 66 of 914 water treatment works got blue-drop status (95% performance in metros & cities; 62% in other areas) Service quality Service quality While 94% of households have access to infrastructure less than 75% of households have functional services Existing infrastructure in poor state and reaching end of life resulting in regular service interruptions and customer dissatisfaction ResourceBulk Distribution Service delivery Reticulation Environment Impact Supply Chain 3

GROUNDWATER & WATER QUALITY CHALLENGE Scattered rural settlements Low economic development Groundwater dependent Groundwater quality challenges Limited surface water potential WATER AVAILABILITY CHALLENGE Extensive water backlogs Water stressed areas Requires large WR & bulk development (DeHoop + oth) WATER DISTRIBUTION CHALLENGE Scattered water needs Within water-rich WMA (but no access) Requires major WR & bulk developments Formal Historic Basic Water Supply Needs Main backlogs in EC, KZN, LP

KEY URBAN WATER SERVICES CHALLENGES Urbanization and densification Housing related “new” services needs Internal bulk infrastructure challenges with associated service quality challenges (e.g. drinking water quality, wastewater management, interruptions, effective use, loss prevention and asset management) Environmental impacts and risks (e.g. urban river quality, health and recreation) 2.3 million households (Mar 2011) informal settlements & backyard dwellers informal settlements & backyard dwellers note location differs substantially from formal backlogs indicated in blue note location differs substantially from formal backlogs indicated in blue Basic Urban Water Supply Challenges Main challenges in Metros & Cities Spatially not aligned with formal backlogs

Integrated delivery example: Olifants development 41

STRYDPOORT MOUNTAINS BURGERSFOR T DE HOOP DAM STEELPOORT TOWN MOTOTOL O MOKOPANE POLOKWANE LEBOWAKGOMO JANE FURSE ORWRDP: PROJECT AREA FLAG BOSHIELO DAM Carbonatites Google Purchase ID:

STRYDPOORT MOUNTAINS BURGERSFOR T EPSS DE HOOP DAM STEELPOORT TOWN MOTOTOL O MOKOPANE POLOKWANE LEBOWAKGOMO JANE FURSE Flag Boshielo RWS Tubatse RWS Nebo Plateau RWS Lebalelo RWSOlifantspoort South RWS Mphahele and Groothoek RWS Olifants-Sand RWS ORWRDP: WATER RESOURCES DEVELOPMENT FLAG BOSHIELO DAM LEGEND SUPPLY AREAS EXISTING BULK WATER PIPELINES ORWRDP PIPELINES ESKOM PSS INFRASTUCTURE PUMP STATIONS WATER TREATMENT RESERVOIRS MOOIHOEK Google Purchase ID:

STRYDPOORT MOUNTAINS BURGERSFOR T DE HOOP DAM STEELPOORT TOWN MOTOTOL O MOKOPANE POLOKWANE LEBOWAKGOMO JANE FURSE Flag Boshielo RWS Tubatse RWS Nebo Plateau RWS Lebalelo RWSOlifantspoort South RWS Olifants-Sand RWS ORWSDP: SUPPLY AREAS AND FEASIBILITY STUDIES FLAG BOSHIELO DAM LEGEND SUPPLY AREAS EXISTING BULK WATER PIPELINES FEASIBILITY AREAS MOOIHOEK Mphahele and Groothoek RWS Google Purchase ID:

Olifants River Steelpoort River Leolo Mountains Strydpoort Mountains Jane Furse LEGEND Study Area Phase 1 Carbonotites Flag Boshielo Google Purchase ID:

DE HOOP DAM Olifants River Steelpoort River Leolo Mountains Strydpoort Mountains Jane Furse LEGEND Study Area Phase 1 Phase 2 WTW Reservoir Carbonotites Flag Boshielo Google Purchase ID:

STRYDPOORT MOUNTAINS BURGERSFOR T EPSS DE HOOP DAM STEELPOORT TOWN MOTOTOL O MOKOPANE POLOKWANE LEBOWAKGOM O JANE FURSE Flag Boshielo RWS Tubatse RWS Nebo Plateau RWS Lebalelo RWSOlifantspoort South RWS Olifants-Sand RWS ORWSDP: WATER SERVICES DEVELOPMENT FLAG BOSHIELO DAM LEGEND SUPPLY AREAS EXISTING BULK WATER PIPELINES ORWRDP PIPELINES WATER SERVICES BULK PIPELINES ESKOM PSS INFRASTUCTURE PUMP STATIONS WATER TREATMENT RESERVOIRS MOOIHOEK Mphahele and Groothoek RWS Google Purchase ID:

STRYDPOORT MOUNTAINS BURGERSFOR T EPSS DE HOOP DAM STEELPOORT TOWN MOTOTOL O MOKOPANE POLOKWANE LEBOWAKGOM O JANE FURSE Flag Boshielo RWS Tubatse RWS Nebo Plateau RWS Lebalelo RWSOlifantspoort South RWS Olifants-Sand RWS ORWSDP: TOTAL WATER SERVICES DEVELOPMENT CAPITAL REQUIREMENTS FLAG BOSHIELO DAM LEGEND SUPPLY AREAS EXISTING BULK WATER PIPELINES ORWRDP PIPELINES WATER SERVICES BULK PIPELINES ESKOM PSS INFRASTUCTURE PUMP STATIONS WATER TREATMENT RESERVOIRS R 254M R 349M R 518M R 935M R 922M R 811M R 255M Mphahele and Groothoek RWS TOTAL R 5 400m Google Purchase ID:

Task Team/ Steering Committee TOR Represent sector, theme, business area with associated responsibilities and implications Provide input and advice on concept, design, output and application Facilitate sector, theme, technical and any other related information input Facilitate validation, quality control and alignment Partake in strategic analysis Establish ownership and application Provide development support 49

Though leadership may be hard to define, the one characteristic common to all good leaders is the ability to make things happen. Ted W Engstrom