Industry’s Perspective of Design for Safety Regulations John Gambatese, Oregon State University, USA Alistair Gibb, Loughborough University, UK Phil Bust,

Slides:



Advertisements
Similar presentations
Be part of the solution \\ HSEs strategy for health and safety in Great Britain Name Non Executive Board Member / Director… Health and Safety Executive.
Advertisements

Health and Safety Executive Health and Safety Executive CDM 2007 Training Package Session 2 - Clients Version: September 07.
Health and Safety Executive Health and Safety Executive Construction (Design and Management) Regulations 2007 Training Package Session 1- Overview Version:
Health and Safety Executive Health and Safety Executive Update on HSE evaluation of CDM 2007 Andrew Maxey and Anthony Lees.
School Social Work: Ensuring Student Success Connecting Schools, Families & Community Removing Barriers to Education Slide show based on documents from.
Designing for Construction Safety and Health From Research to Practice John Gambatese, PhD, PE School of Civil and Construction Engineering Oregon State.
Health and Work Development Unit 2011 Implementing NICE public health guidance for the workplace: Implementation and audit action planning toolkit.
REPRESENTING EMPLOYER ORGANIZATIONS THROUGHOUT THE WORLD HOW THE EMPLOYERS ORGANISATIONS CAN INFLUENCE THE PRIORITIES AND OUTCOMES OF DWCPS Presentation.
Construction (Design & Management) Regulations 2007 Jim Armstrong MCIAT, RMaPS LINDUM CONSTRUCTION FOOD CONSTRUCTION SEMINAR.
Health and Safety Executive Health and Safety Executive Welcome to CDM 2015 Stakeholder Briefing HM Inspector of Health and Safety.
CDM Regulations – 2015 Are you prepared?. Contents  Introduction and Background  Changes to 2007 Regulations  Notifiable or Not?  Roles / Duties 
AN INVESTIGATION INTO THE EFFECTIVENESS OF PARTNERING IN PROMOTING HEALTH AND SAFETY MANAGEMENT ON CONSTRUCTION SITES Brian C Heath BSc, MSc, MRICS Directorate.
CIB W099 - Hong Kong - May 2002 One Country - Two Systems ConCA Accident Causality Preliminary Results Alistair Gibb, Roger Haslam, Diane Gyi, Sophie Hide,
THE PROJECT TEAM TYPICAL REQUIREMENTS AND RESPONSIBILITIES OF THE PROJECT TEAM TRADITIONAL TEAM ORGANIZATION AND VARIATIONS THE OWNER’S TEAM THE DESIGN.
TOOL TO DESIGN FOR CONSTRUCTION WORKER SAFETY An Article Written by Gambatese, Hinze and Haas 1997.
Supply Chain 101 – July 2010.
June, 2003 Poverty and Climate Change Reducing the Vulnerability of the Poor through Adaptation Poverty and Climate Change Reducing the Vulnerability of.
Risk and Resilience: A Canadian Perspective on Climate Change Adaptation Donald S. Lemmen, PhD Climate Change Impacts and Adaptation Directorate Natural.
National Strategic Plan for Asbestos Management and Awareness Peter Tighe Chief Executive Officer, Asbestos Safety and Eradication Agency.
FM Guidance for Design Teams MEFMA Focus Group. Team Members Neil Blakey FM Consultant, Mace Macro Stuart Clayton Project Manager, Serco Middle East Ryan.
Being Proactive: An Organisational Approach to Managing Workplace Stress I/O Net Presentation by Dr Hillary Bennett Director, PsychAssessments.
Process Safety Management
Prevention through Design Practice and Research: A U.S. Construction Industry Perspective John A. Gambatese Oregon State University, Corvallis, OR, USA.
Risk Assessment – An Essential Standard
Making Land Securities Healthier, Safer, Happier and for Good Clive Johnson Group Head of Health and Safety Healthy, Safe and.
Successful Management of Lift Assets for Bangor University, Estates and Facilities Department – Case Study.
Health & Safety in Construction Key Issues for Designers, Managers & Contractors.
Strategic Plan Evidence, knowledge and action for a healthier Ontario October 2, 2013 Presentation to ANDSOOHA.
Safety and health at work is everyone’s concern. It’s good for you. It’s good for business. Managing stress and psychosocial risks at European workplaces.
Occupational Health & Safety
Tom Cecich, CSP, CIH NC Chapter ASSE March 12, 2015.
Training and Health & Safety Under Construction II Malta Twinning Seminar 2 October 2009 Training and Health & Safety Tonio Farrugia.
1 The IT-barometer study and plans for its renewal 2006 Olle Samuelson CIO Tyréns AB.
Integrating Safety Management Systems – Opportunities for Improvement
Health and Safety Executive Health and Safety Executive Construction (Design and Management) Regulations 2007 July 2010.
Health and Safety Executive Health and Safety Executive Construction (Design and Management) Regulations 2007 Overview Version: September 07.
CDM 2015 – HSE’s PERSPECTIVE Health and Safety Executive
ARC 807: Professional Practice and Procedure Department of Architecture, Federal University of Technology, Akure, Nigeria ARC 807: Professional Practice.
T. Michael Toole, PhD, PE Dept. of Civil & Environmental Engineering Bucknell University John Gambatese, PhD, PE School of Civil and.
Engineering Safety in Design Bo Hu John Nieber. Safety Damage from an unsafe process or product – A defective automobile brake system: Collision: driver,
More Construction for the Money “Back to the Future” Jim Porter 2004 Recipient Carroll H. Dunn Award of Excellence.
Health and Safety Executive Health and Safety Executive CDM 2015 & information a view from HSE Louise Brearey Head of Operations HSE London & South-East.
Health and Safety Executive Health and Safety Executive Worker Involvement in Health and Safety David Smeatham Head of Worker Involvement and Inclusion.
1 The Use of Institutional Controls Under the RCRA Corrective Action Program.
CDM 2007 Mike Lewis 6 th February New Construction (Design and Management) Regulations Revisions to the Construction (Design and Management) (CDM)
Health and Safety Executive Construction (Design and Management) Regulations 2007 – 2 and a bit years in Anthony Lees Construction Policy Unit.
IAEA International Atomic Energy Agency Summary and Overview of TECDOC Russel Edge Decommissioning and Remediation Unit Division of Radiation,Transport.
Developed by: Purdue University Agricultural Safety and Health Program Department of Agricultural and Biological Engineering West Lafayette, IN This material.
Workshop Four Topic 4.5 Human Resources Development © Ana G. Méndez University System, All rights reserved.
1 Quality in Construction; cidb Mandate & Focus February 2014.
Health and Safety Executive Health and Safety Executive CDM 2007 Training Package Competence & training Version: September 2007.
CDM 2015 What we’ve learnt so far 20 October 2015.
Work Safe Alberta: We’re Here to Help! An update on new and upcoming Government of Alberta OHS information resources Dave Wojcicki, M.Sc., CRSP Health.
1 October 2015 Daryl D. Green Oak Ridge Office of Environmental Management OREM 2015 Safety Culture Evaluation Results LESSONS LEARNED.
ISO Current status of development ​ ​ ISO development process ​1​1.
Health and Safety Executive Health and Safety Executive Welcome to CDM 2015 The role of the client Paul Harvey HM Principal Inspector of Health and Safety.
Agenda  Safety Management in Roads Service  A review of the roles within CDM  What are the construction regulations?  What's in a H&S plan?  CDM and.
Presentation 6: Sharing your knowledge and experience.
CDM 2015 Simon Longbottom 20 May Progress Significant culture change over last years Long-term downward trend fatals/major injuries Greater.
Be Prepared For Change Are you Prepared?. Be Prepared For Change Are you Prepared?
Safe roads, Reliable journeys, Informed travellers “how the HA is addressing the needs of safety in future maintenance and construction within the design.
Be part of the solution \\ HSE’s strategy for health and safety in Great Britain Jane Willis Director of Cross-cutting Interventions Health and Safety.
FISA 2017 Began 2012.
The same report also stated that:
Behavior-based Safety (BBS)
RISK ASSESSMENT AND METHOD STATEMENT
The Role of the Construction Management Team
Behavior-based Safety (BBS)
Creating a Culture of H&S in Your School EdExec Live – 21 June 2018
Effective Construction Safety Management
Presentation transcript:

Industry’s Perspective of Design for Safety Regulations John Gambatese, Oregon State University, USA Alistair Gibb, Loughborough University, UK Phil Bust, Loughborough University, UK Michael Behm, East Carolina University, USA CIB W099 Conference Working Together: Planning, Designing and Building a Healthy and Safety Construction Industry Melbourne, Australia October 21-23, 2009

Prevention through Design (PtD) “Addressing occupational safety and health needs in the design process to prevent or minimize the work-related hazards and risks associated with the construction, manufacture, use, maintenance, and disposal of facilities, materials, and equipment.” “Addressing occupational safety and health needs in the design process to prevent or minimize the work-related hazards and risks associated with the construction, manufacture, use, maintenance, and disposal of facilities, materials, and equipment.” (

Implementing PtD in Construction Why design for construction safety? Why design for construction safety? Connection between design and site hazards Connection between design and site hazards Ethical responsibility Ethical responsibility Ability to influence safety (hierarchy of controls) Ability to influence safety (hierarchy of controls) Makes good business sense Makes good business sense Contractually obligated Contractually obligated Required by statute (some countries) Required by statute (some countries) Other… Other…    ? ? ?

Research Study Assess the effects of the CDM regulations on the construction industry in the UK Assess the effects of the CDM regulations on the construction industry in the UK Affect of CDM regulations on: Affect of CDM regulations on: Design, construction, and safety Design, construction, and safety Perceptions of safety, roles on the project, and organizational and professional culture Perceptions of safety, roles on the project, and organizational and professional culture Management of projects Management of projects Presence of innovative processes and products Presence of innovative processes and products

Research Study Focus group interviews Focus group interviews 6 professional “communities”: 6 professional “communities”: Architects, design engineers, facility owners/developers, constructors, manufacturers/suppliers, and H&S consultants Architects, design engineers, facility owners/developers, constructors, manufacturers/suppliers, and H&S consultants 13 focus group interviews 13 focus group interviews Total of 61 participants in interviews Total of 61 participants in interviews Experience with CDM regulations: 1-18 years (mean = 11.1) Experience with CDM regulations: 1-18 years (mean = 11.1) 46% from firms with >1,000 employees 46% from firms with >1,000 employees 26% H&S consultation, 22% project management, 20% construction, 18% engineering, and 14% architecture 26% H&S consultation, 22% project management, 20% construction, 18% engineering, and 14% architecture Industry sectors: 36% commercial, 35% industrial, 29% infrastructure, and 28% residential Industry sectors: 36% commercial, 35% industrial, 29% infrastructure, and 28% residential

Results: What is done differently now? Changes since introduction of CDM regulations: Changes since introduction of CDM regulations: More safety notes/symbols on drawings More safety notes/symbols on drawings More pre-fabrication More pre-fabrication More consideration of construction earlier in project More consideration of construction earlier in project Safety constructability, not just constructability Safety constructability, not just constructability More paperwork!! More paperwork!! Designer change in perspective regarding safety Designer change in perspective regarding safety More communication/collaboration as a team More communication/collaboration as a team Causing them to “just do what they should do as professionals” Causing them to “just do what they should do as professionals” “This is the real driver. CDM was just the catalyst.” “This is the real driver. CDM was just the catalyst.”

Results: Impact on Projects Change as a result of implementing PtD Change as a result of implementing PtD (% of respondents) ItemDecrease No Change Increase Design cost (n=35)6%46%49% Construction cost (n=38)34%24%42% Design duration (n=37)8%57%35% Construction duration (n=39)38%44%18% Construction quality (n=39)8%28%64% Construction worker productivity (n=30)13%33%53% Construction worker health & safety (n=45)4%9%87% End-user health and safety (n=42)5%10%86%

Results: Barriers and Enablers Barriers: Barriers: Designer education and training Designer education and training Difficult for designers to assess risks Difficult for designers to assess risks Also differences in risk thresholds Also differences in risk thresholds Lack of knowledge of CDM regulations Lack of knowledge of CDM regulations Too much paperwork!! Too much paperwork!! Separation of design and construction Separation of design and construction Competing priorities (safety vs. cost/schedule) Competing priorities (safety vs. cost/schedule) Enablers: Enablers: Construction experience of A/Es Construction experience of A/Es Integrated project delivery methods (e.g., design-build) Integrated project delivery methods (e.g., design-build) A good CDM Coordinator and early involvement A good CDM Coordinator and early involvement

Results: Desired Changes Desires/Needs: Desires/Needs: Less paperwork!! Less paperwork!! Guidance on what designers should do in practice and what is better left up to the contractor Guidance on what designers should do in practice and what is better left up to the contractor Improvements in safety and design culture Improvements in safety and design culture Make CDM Coordinator a more “professional” position, on the same level as the A/E Make CDM Coordinator a more “professional” position, on the same level as the A/E

PtD Regulations: Issues to Consider Issues/concerns: Issues/concerns: Small projects vs. large projects Small projects vs. large projects Involvement/impact depends on industry sector Involvement/impact depends on industry sector On some projects: On some projects: Just “doing the paperwork” (depends on CDM Coordinator) Just “doing the paperwork” (depends on CDM Coordinator) Alienating designers instead of engaging them Alienating designers instead of engaging them Focus on “commercially practicable” Focus on “commercially practicable” Just documenting the risk and managing it as usual? Just documenting the risk and managing it as usual? Minimal pushing of interventions up the hierarchy of controls Minimal pushing of interventions up the hierarchy of controls Designing for operations and maintenance safety viewed as satisfying CDM regulations? Designing for operations and maintenance safety viewed as satisfying CDM regulations? Construction safety still “passed on” to contractor Construction safety still “passed on” to contractor

PtD Regulations: Issues to Consider Issues/concerns: Issues/concerns: “Whatever I do won’t help.” “Whatever I do won’t help.” Planning Supervisor credibility Planning Supervisor credibility Design already optimized on standard projects? Design already optimized on standard projects? PtD message lost amid need to meet CDM regulations PtD message lost amid need to meet CDM regulations Where does designer’s responsibility end? Where does designer’s responsibility end? By doing PtD, is there now less of a need to do downstream risk management? By doing PtD, is there now less of a need to do downstream risk management? Yes and No Yes and No If no CDM, then PtD would not happen? If no CDM, then PtD would not happen? Yes and No Yes and No

Thanks for Listening Questions? Comments? Questions? Comments? For more information: For more information: