Introduction to SMARTWaste Plan – benefits for Strategic Waste Planning Katherine Adams Centre for Resource Efficiency.

Slides:



Advertisements
Similar presentations
Greening Construction
Advertisements

Business Resource Efficiency and Waste (BREW) Programme Mark Atherton Head of Sustainable Development Northwest Regional Development Agency Nick Storer.
Reducing construction waste through design Dave Marsh Construction Project Manager.
Site Waste Management Plans and the Code
Company Profile National specialized in steel-House technology exploitation, designing, construction, National has had invested 2 million USD at first.
Case Franchise Support & Training. Case Support Who? Who do I call for support? What? What types of questions can be answered by the corporate support.
Gathering Data on Construction Waste Peter Johnson Kier Construction Division Sustainability Manager.
Recycling for the Future – The Dublin Waste Management Plan Mary O’Reilly RPS Consulting Engineers.
Government initiatives on construction and demolition waste
Taking Action on Construction Waste South Ayrshire Council.
West of England Joint Waste Core Strategy Preferred Options Allan Davies Planning Policy Officer North Somerset Council West of England Partnership Office.
Danish Resource Efficiency Strategy Conference Dr Mervyn Jones Head of Collaborative Programmes.
Waste prevention within FM Dr Leigh Mapledoram Products & Services, WRAP.
Colin Buchanan A Mobility Management Plan for the National University of Ireland, Galway.
From Strategy to Reality: Delivering Sustainability Daniel Botterill & Michelle Dixon – Sustainable Resource Solutions Katherine O’Brien – University of.
Site Waste Management Plans Presentation – September 2009 Planning Agents’ Forum.
Waste Management & Recycling Estates Management Mark Lindsay, Senior Contracts Surveyor Andy Baillie, Cleaning Services Manager Alan Gray, Procurement.
Modernization of Approvals Presentation to Air Practitioners
Waste Update Rail Environment Infrastructure Presentation Thursday 15th August 2013.
EMS adding value IEMA regional workshop 07/07/10 Matthew Payne
Portfolio Manager 101. Learning Objectives In this session, you will become familiar with EPA’s ENERGY STAR ® Portfolio Manager ® tool and learn how to:
Wenxin Zhang Department of Civic Design University of Liverpool
Alan Hendry Envirowise Scotland Manager. TODAY’S OBJECTIVES  Introduce Envirowise  Introduce the Public Sector Supply Chain Project  Other examples.
Peformax an introduction and case studies. peformax: Agenda Introduction Key Principles An Enterprise Solution Case Studies Western Australia Institute.
OVERVIEW: COMMERICAL RECYCLING. INTRODUCING CRL CRL was formed in 2001 as a commercial tipping and recycling facility To enable CRL to recycle more the.
Part of the BRE Trust Protecting People, Property and the Planet BREEAM In-Use: the international sustainability standard for existing buildings – quick,
Waste measurement & improving performance trainer organisation location date.
Welcome to iDOC Corp. DocHost Solution Online Document Management DocHost 14 Day Free Trial
“ From Waste to Resource Management: A New Way of Thinking about Waste Services and Contracts” Materials Management Resource Recovery Process (Private.
Energy & Environment Report for 2008 – 2009 Ian Rowe Manager (Health, Safety & Environment)
Sustainable Design and Construction Drivers Kate Mills Senior Sustainability Consultant, BRE
CMS 2009 Gilli Hobbs Centre for Resource Efficiency.
Construction Commitments: Halving Waste to Landfill Workshops March 2009.
Sustainable Procurement & Life Cycle Analysis Heather Pearce 9 th February 2010.
Govt 3 Waste Minimisation Update Natasha Lewis WasteMinz, Nov ‘08.
East of England C&D Waste Arisings Maggie Blackwell Resource Efficiency.
A Cleaner Production Project in the South African Paper Industry – Lessons learnt Iain Kerr, MSc (Env. Biotech.) University of KwaZulu Natal, School of.
Including Sustainability in the Brief Kate Mills Senior Sustainability Consultant, BRE
Construction Commitments: Halving Waste to Landfill Workshops November - February 2009.
Part of the BRE Trust Protecting People, Property and the Planet BREEAM International Development and Operation Pauline Tzachrista BREEAM International.
Energy Saving Trust regional support Richard Hurford Head of Energy Saving Trust South East.
Resource Efficient Construction Richard Buckingham Head of the Built Environment WRAP BASE London 11 th July, 2013.
Construction Commitments: Halving Waste to Landfill Breakfast Briefings October - November 2008.
PLANNING ENGINEERING AND PROJECT MANAGEMENT By Lec. Junaid Arshad 1 Lecture#03 DEPARTMENT OF ENGINEERING MANAGEMENT.
Waste Management - The Importance All wastes have the potential to cause environmental damage if not correctly managed The concept of “producer responsibility”
Unit 18: CADD in Construction Lesson Objective Be able to explain the use of Building Information Modelling in buildings.
Responsible Care® Basic Awareness 1. DISCUSSION POINTS 2 WHAT IS RESPONSIBLE CARE®? HOW DOES RESPONSIBLE CARE® ADD VALUE? WHAT CAN YOU DO TO SUPPORT RESPONSIBLE.
An introduction to the Net Waste Tool An overview of its benefits and functions.
AIPC Annual Conference 2010 – Going Green: is it Worth it? Presented by Martin Jennings, Partner, Davis Langdon LLP Going Green – A UK Perspective.
Construction Commitments: Halving Waste to Landfill Breakfast Briefings October - November 2008.
Every Can Counts Save a Cup - AGM 11 th February 2010.
An Overview of the Smart Metering Programme in GB.
Portfolio Manager 101. Learning Objectives In this session, you will become familiar with EPA’s ENERGY STAR ® Portfolio Manager ® tool and learn how to:
FRA34 Framework training and update. Agenda introductions Halving Waste to Landfill update design out waste tools – what's new? coffee break cost benefit.
REDUCING WASTE TO ZERO James Copperwait – Managing Director Focus Environmental and Focus Recycling
Workshop Session 5 - Guidance and Help Available.
Fenland Green Business Club Waste Seminar 27 th April 2010 Simon Chiva Programme Manager Resource Efficiency East.
The Design Tool for Civil Engineering projects – an overview Phil Birch & Susan Steensma Cyril Sweett
Je-Kyun Kim Swapnil Patil William Lindsey Ken Brenner Sumit Gangwani Varun Jain.
Growth that doesn’t cost the earth. Resource Efficient Scotland Growth that doesn’t cost the earth Kasia Nathan Implementation.
Waste Diversion Planning
‘Sustainability Matters – it’s the future of your business’
Sustainability and the Built Environment
Circular Economy Opportunities in The Construction Sector
The catalytic route to zero waste
Our mission is to accelerate the move to a sustainable,
Supply Chain Challenge
SmartWaste - What we’ve done….
How to build your Integrated
Sustainable buildings
Presentation transcript:

Introduction to SMARTWaste Plan – benefits for Strategic Waste Planning Katherine Adams Centre for Resource Efficiency

Overview Why measure? History of SMARTWaste An introduction to SMARTWaste Plan Some data Benefits of SMARTWaste Plan A demonstration The future

We are: “A world leading centre of expertise for construction and fire, providing research, consultancy and information services to customers worldwide.” Owned by a charity, BRE Trust Offices in UK: Garston (Watford), Scotland, Highlands, Wales and Ireland BRE

One-stop-shop of integrated solutions for the whole supply chain on all aspects of material waste including: –Waste auditing –Waste minimisation –Waste management in the construction, demolition, refurbishment, manufacturing and related industries –Pre-demolition and pre-refurbishment audits –Training –Development of various software tools Resource Efficiency Team at BRE

Benchmarking “ In order to manage something you must first be able to measure it ”

Why measure? Understand = set baseline & appropriate targets Measure progress Provide focus and priority actions Continually improve Report back

What can we measure? MeasurementExample of IndicatorBenefit Amount of waste produced M 3 or tonnes / 100m 2 of floor area M 3 or tonnes / £100,000 project value Waste minimisation Cost savings Better efficiencies Amount of materials used Material unit Cost of material Wastage rate (%) Cost savings Better efficiencies Focus on key materials Procurement Amount of waste reused, recycled, diverted from landfill Amount, % reused on/off site Amount, % recycled on/off site Amount, % recovered from facility Onsite opportunities Site planning Waste contractor services CostWaste/turnover Waste/disposal cost True cost of waste Cost savings Waste contractor services

BRE Environmental Building 1996 – 1997 –Demolition waste recycling 96% –Use of reclaimed and recycled materials –Waste reduction – not possible First detailed waste audit: Willmott Dixon – Pegasus Court, –Over 5000 data entries –Time consuming/ difficult to update site –Software developed Last millennium

Bovis Lend Lease – Chiswick Park and x25 1-week Packaging waste audits with SMARTAudit, English Partnerships – 3 year SMARTAudit of the Greenwich Millennium Project, – see project guides Taylor Woodrow Construction – adopted SMARTStart on all new projects from April 2002 Pre-demolition audits 2002 BREMAP launched 2002 – waste minimisation award 2003 (links to Materials Information exchange) 2000 onwards

SMARTStart Waste contractors sign up – ICWM 2004 BREEAM tool 2005 onwards National Benchmarking 2006 onwards CoRE 2006 onwards – 300 free licences –South East –East –London SmartLIFE / EP Design for Manufacture SMARTWaste for Olympics onwards even more…

SMARTWaste Plan Online SWMP tool Guiding you through the stages of a SWMP Fully interactive – prepare, implement and review a SWMP combined with measurement and monitoring of waste Designed for compliance with Code for Sustainable Homes and BREEAM Accessed via secure username and password Ability to download and print SWMP

SMARTWaste Plan Around 3,000 companies registered 2,000 projects – value of over £40 billion 72% of the top 50 contractors 4 million tonnes of waste measured Users include: Sainsbury’s, M&S, Kier, Bovis Lend Lease, Taylor Woodrow etc Bespoke versions available

SMARTWaste Plan Data security Normal industry practices of network control and server administration All stored data is securely managed with disaster recovery backup The data is not available for use or accessible by anyone apart from the registered user and BRE staff involved in the project Accuracy and Use We will do our best to maintain the accuracy of the personal information you supply to us You have the right to access and correct your personal information at any time BRE will not sell or rent your personally identifiable, company identifiable or project identifiable information to anyone

SMARTWaste Plan Generic Account Structure Each company registers for an account (free) And sets up unique username and password to log in to the account Can also set up additional users on the account – there is a hierarchy of users with different access permission levels Then set up projects for which you can record SWMP requirements and waste arisings data Company Project BProject C Project A SWMP & Waste data SWMP & Waste data SWMP & Waste data

Client Level SMARTWaste Plan (£3,000+VAT) Client level Projects linked using password from client Contractor 1 Project BProject C Project A SWMP & Waste data SWMP & Waste data SWMP & Waste data Contractor 2 Project BProject C Project A SWMP & Waste data SWMP & Waste data SWMP & Waste data Project linked using password from client

Group Level (£1,500 + VAT) Group level Business Unit 1Business Unit 2 Proj BProj C Proj A Proj B Proj C SWMP & Waste data SWMP & Waste data SWMP & Waste data SWMP & Waste data SWMP & Waste data SWMP & Waste data

Data collected Project, company and client level – aggregated All data related to a SWMP –Types and amounts of waste (forecast & actuals) –Recovery routes (including % recovery at waste facilities) –Waste minimisation actions –Training and communication actions –Review process Be able to split into project types, construction phases and work programmes Regional, local levels

Breakdown of performance indicators by product for residential projects Productm 3 /100m 2 m 3 /£100K Canteen/office/ad-hoc Ceramics/bricks Concrete Electrical equipment Furniture Hazardous Inert Insulation Liquids and Oils Metals Packaging Plaster/cement Plastics Timber Grand Total

Range of m 3 /100m 2 for residential projects

Benchmarks of m 3 /100m 2 for standard, good and best practice Best practice Good practice Standard practice Residential< >12.9 Commercial Retail< >12.1 Commercial Offices< >14.0 Education< >12.1

How the data can be used? Micro level –Help to assess planning applications in relation to construction waste –Help with assessing information in relation to Site Waste Management Plan Regulations and the Code for Sustainable Homes –Set targets for waste reduction and recovery for projects through planning conditions –Estimate the likely amount and type of waste arisings for a project –Move projects from standard to best practice

How the data can be used? Macro level –Assess development and construction policies in terms of likely amount of waste produced e.g. housing –Aid in waste planning through assessing existing and future capacitates of waste facilities for construction waste –Set targets and/or provide appropriate guidance for reduction and recovery of waste in planning policies and guidance

Click on the SMARTWaste Plan logo to get to the log in page Click on the logo

Log in page

BREMAP – Search page

BREMAP – Results map

Measure BRE web tool to record site waste performance, identify waste streams for segregation, set targets and produce waste performance indicators.

Benefits Data gained throughout entirety of project Easy access – web based Relatively cheap way to collect data Industry have to do this anyway i.e. SWMP Regulations Drives performance by setting standards, benchmarks More use….the better the data….

The future…. Refurbishment and civils version Set 2008 baseline with Strategic Forum’s Sub Group on Waste Analyse data from SMARTWaste Plan by waste type –Arisings –Recovery Enable reporting of ½ waste to landfill through SMARTWaste with WRAP Better measurement at waste facility Life cycle assessment data for end of life options Better wastage rate for key products

Thank you For further information: W: E: T: