1 FRA34 Framework training and update

2 Agenda introductions Halving Waste to Landfill update design out waste tools – what's new? coffee break cost benefit analysis SWMP and new WRAP template logistics and MRE other resources questions lunch

3 The Construction Commitments: Halving Waste to Landfill “We commit to playing our part in halving the amount of construction, demolition and excavation waste going to landfill by 2012. We will work to adopt and implement standards for good practice in reducing waste, recycling more, and increasing the use of recycled and recovered materials.” ClientsContractors Designers & Consultants Manufacturers & Suppliers Waste management Contractors

4 Who’s signed up already?

5

6 One year on event 15 October 2009 The aim of the event is to congratulate those signed up already, celebrate success (perhaps demonstrate what has already been achieved), and encourage those who haven’t yet signed to do so.

7 This year’s about delivery  Engagement  Exemplar projects  Events & training  Tools  Materials recovery  Communication

8 Design out waste Dave Marsh, WRAP

9 Tools Richard Martin, WRAP

10 Cost benefit analysis Tya Shannon, Cyril Sweett

11 Business benefits Show that you are committed to measurement and reporting Communicate your environmental commitment Benefit from significant PR activity Generate cost savings Business benefits Demonstrate leadership and become a change champion

12 True cost of waste –Visible costs –Wasted materials –Labour costs –Transport costs True cost of waste ~£1,300 per skip Cost reduction

13 Savings of £28 per tonne by segregating waste on site – rising to £57 per tonne Material wasted in building 190,000 homes = £1 billion Current best practice could save ~£1,000 per house Cost reduction through waste reduction and recovery

14 Cost Benefit Analysis (CBA) 1.Calculate the benefits of achieving good practice using the Net Waste Tool: Reduced cost of materials purchased Reduced cost of waste disposal 2.Investigate the cost of achieving good practice (targeted materials): Quality SWMP, materials storage, site training, management time, updating SWMP) 3.Calculate net benefit Benefit – Cost = Net benefit These savings currently do not include : demolition and excavation materials infrastructure and maintenance projects cost savings from reuse of materials waste reduction from selection of alternative structural solutions at the design stage.

15 Masonry House CBA - benefits

16 Masonry House CBA - costs

17 Masonry House CBA – net benefit

18 CBA project comparison * preliminary results only

19 CBA conclusions Reducing and segregating waste provides a net cost benefit (most cases) Projects with very low waste generation (e.g. prison) can still achieve cost neutral good practice waste management The cost of good practice is a greater % of construction value for small projects The greater benefit is achieved through waste reduction - segregation is not enough

20 SWMP – the new template Ben Harris, WRAP

21 Logistics and MRE Malcolm Waddell, WRAP

22 Other resources

23 WRAP online resources www.wrap.org.uk/procurement_requirements

24 WRAP online resources

25 Resources available

26 Questions?


Download ppt "FRA34 Framework training and update. Agenda introductions Halving Waste to Landfill update design out waste tools – what's new? coffee break cost benefit."

Similar presentations


Ads by Google