CYCLONE ROOF – CAST LINING Country Czech Republic IndustryCement Plant group name: XX Plant name: XX Main equipment supplier: PSP (Czech Republic) Production.

Slides:



Advertisements
Similar presentations
Schmidt & Danielsen a/s –Establised in 1964 mainly as a service company in the refractory business without technical support. –In 1985 Søren Danielsen.
Advertisements

VORTEX FINDERS (DIP TUBES, IMMERSION TUBES)
CHOOSING AND INSTALLING MONOLITHIC REFRACTORIES ‘BOY’ ILANO III (PME) - President & GM 360 Degrees Marketing and Services Industry, Inc. ( Engineers and.
Plant in Saudi Arabia Case story for Nose Ring Castables D52A.
© Oxford University Press 2011 IP1.9.4 Payback calculations Payback calculations.
Ceramite The Wear Resistant Material
5 critical areas in Cement plants
122 Nov GTK Microchannel Cooling Hydraulic simulation with Rectangular Manifold Enrico Da Riva, Vinod Rao CERN (EN/CV/DC) 22 th Nov 2011 E. Da Riva,
May 2, 2015 Central Fuel Research Institute Dhanbad presents by Kalyan Sen and Rahul Das Gupta Beneficiation of difficult-to-wash Low Volatile.
APPROPRIATE LAW COST TECHNIQUES IN RURAL WATER SUPPLY SCHEMES H,M.GUNAPALA(E/A) RWS-Unit Monaragala MAHINDA DISSANAYAKE RWS-Unit Badulla.
|0 THE SKINNER COMPANY PRODUCT REVIEW
BusinessCem Conference, Prague December 13, 2011 BEUMER Group, KOCH Holding, a.s. Usti nad Labem, Czech Republic Storage, Dosing and Conveying of Secondary.
GRATE COOLER Traditional grate cooler - TAD : circa 800 deg.C. Hot zone – cold zone.
Anchors. Function Roof, Wall or Floor – Temperature? – Chemical attack on the anchors? – Do they need to support the weight of the lining? – Or are the.
Introduction/Materials & Methods (Kinetic Studies) By:Kristin Ackermann Amanda Rohs Blanca Skelding.
Sanitary Engineering Lecture 16
Kosovo Energy System. Energy Situation Production of electricity is monopoly of “Kosovo Energy Company” (KEK) Main energy sources Coal fired power stations.
 Based in Bedford employing c 40 employees  Largest supplier of aluminium rainwater systems in the UK  Patented Aligator jointing method  Exemplary.
Materials And Construction Technology Materials And Construction Technology PALESTINE UNIVERSITY Chapter No.#8 Mechanical Works Dr. Ali Ibrahim Tayeh.
Research and Development at HASLE Refractories A/S Tina Stendal Svendsen Product Mananger 1.
Presentation of HASLE Refractories A/S Ceramic Diptube Case Story
Renewable Energy Solar Energy Advantages: Solar energy is free
BUILDING MATERIAL BUILDING MATERIAL PALESTINE UNIVERSITY chapter No.#7 Mechanical Works Dr. Ali Ibrahim Tayeh.
CASE STUDY-MODULAR LINING AT SMOKE CHAMBER/RISER DUCT AT A CUSTOMER IN INDIA COMPANY OVERVIEW : The customer is a 25 years old, large Cement producer in.
$100 $200 $300 $400 $500 $100 $200 $300 $400 $500 $100 $200 $300 $400 $500 $100 $200 $300 $400 $500 $100 $200 $300 $400 $500 $100 $200 $300.
WIRE SAW TO CUT PIPES. SPECIALIZED WIRE SAW TO CUT PIPES Technical details: electric or hydraulic driven easy to fix to the pipe under.
Paul Davies Wates Living Space Building the Supply Chain.
Gandhinagar Institute of Technology
REFCONS CASE AT WASTE INCINERATION PLANT Country:Denmark Plant name:AffaldPlus, Næstved Boiler Type:Steam Power Capacity:- Main equipment supplier:Babcock.
Инвестиционный паспорт Муниципального образования «Целинский район»
(x – 8) (x + 8) = 0 x – 8 = 0 x + 8 = x = 8 x = (x + 5) (x + 2) = 0 x + 5 = 0 x + 2 = x = - 5 x = - 2.
1 Press Ctrl-A ©G Dear 2008 – Not to be sold/Free to use Intro Stage 6 - Year 11 General Mathematics Preliminary.
: MAX, MICHAEL, AHMED NUCLEAR ENERGY. NUCLEAR REACTORS Nuclear fission – neutrons split nuclei of atoms of uranium 235 and plutonium 239 Release energy.
PSP Thermal stations. Thermal plant Electric power generation system block diagram Electric power generation system block diagram Steam station Major.
$100 $200 $300 $400 $500 $100 $200 $300 $400 $500 $100 $200 $300 $400 $500 $100 $200 $300 $400 $500 $100 $200 $300 $400 $500 $100 $200 $300.
$100 $200 $300 $400 $500 $100 $200 $300 $400 $500 $100 $200 $300 $400 $500 $100 $200 $300 $400 $500 $100 $200 $300 $400 $500 $100 $200 $300.
CASE STUDY - BURNER PIPE AT CUSTOMER IN INDIA COMPANY OVERVIEW : The customer is a 50 years old well known Cement producer of South India. 5 advanced production.
Solar energy Solar energy is used to help cut the cost of electricity.
Presentation of HASLE Refractories A/S Ceramic Diptube Case Story at a plant in Thailand
Multi-product beneficiation of Inferior Coals to User Specific products Central Fuel Research Institute, Dhanbad (India) By Kalyan Sen.
实验十四 紫外线灭菌  一、实验背景及目的:  灭菌是一种杀灭微生物的措施。紫外线灭菌 是物理灭菌因素之一。  1. 了解紫外线灭菌的原理;  2. 学习、掌握紫外线灭菌的方法。 版权所有 未经作者同意 请勿使用.
SANKALCHAND PATEL COLLEGE OF ENGINEERING,
Hempcrete is an insulation material made of hemp shiv mixed with a lime based binder. With low embodied energy and low energy in use, hempcrete offers.
AUSTERVILLE RECTIFICATION PROJECT. PROJECT DETAILS 1148 OF DWELLINGS TO BE RECTIFIED BUDGETED AT R / UNIT TOTAL BUDGET R 96 million EXPECTED.
照片档案整理 一、照片档案的含义 二、照片档案的归档范围 三、 卷内照片的分类、组卷、排序与编号 四、填写照片档案说明 五、照片档案编目及封面、备考填写 六、数码照片整理方法 七、照片档案的保管与保护.
공무원연금관리공단 광주지부 공무원대부등 공적연금 연계제도 공무원연금관리공단 광주지부. 공적연금 연계제도 국민연금과 직역연금 ( 공무원 / 사학 / 군인 / 별정우체국 ) 간의 연계가 이루어지지 않고 있 어 공적연금의 사각지대가 발생해 노후생활안정 달성 미흡 연계제도 시행전.
Sanitary Engineering Lecture 13
INNER TUBES AND RUBBER SINCE 1983 KABAT S.J.. COMPANY PROFILE.
SOIL MECHANICS AND FOUNDATION ENGINEERING-III (CE 434)
Жюль Верн ( ). Я мальчиком мечтал, читая Жюля Верна, Что тени вымысла плоть обретут для нас; Что поплывет судно громадней «Грейт Истерна»; Что.
INSTALL INSULATION IN BOILER PLANT PROJECT SECTIONS: 1.VALVE JACKETS 2.BOILER REFRACTOR JACKETS 3.PIPING INSULATION / PVC.
The reading is 7.38 mm. The reading is 7.72 mm.
BY-PASS SYSTEM IN CEMENT INDUSTRY.  Using a high amount of secondary fuel and raw meal which are having often higher content of chlorine, alkalis and.
10 mm is the same as... 1 cm. 20 mm is the same as... 2 cm.
输尿管软镜钬激光碎石术的体会 南华大学附属第二医院泌尿外科三区 钱 坤. 背 景  输尿管软镜作为一种新碎石手段,目前在部分医 院应用。其安全性、有效性得到一致的认可。  但是存在一些问题需要探讨:  手术适应症、禁忌症  影响碎石成功率的因素  手术并发症的防治.
Sorbent Handling Plant by NHI-Design & Equipment Specifications
2016 Maintenance Innovation Challenge
EARTHING.
Roofing Materials Suppliers in UAE
Nuclear Power - a reliable partner
BACK SOLUTION:
Govt. Polytechnic,Manesar
2018 Green Roof Research Project
EDLC(Embedded system Development Life Cycle ).
Mai-19 eca biomed GmbH & Co. KG Riedstadt 1 1.

Converting Between Measures
Main needs of electricity system of the Czech Republic
Presentation transcript:

CYCLONE ROOF – CAST LINING Country Czech Republic IndustryCement Plant group name: XX Plant name: XX Main equipment supplier: PSP (Czech Republic) Production capacity: 2600 TPD Number of production lines: 1 Fuel Types Coal, tyres + ……

CYCLONE ROOF – CAST LINING XX plant Czech Republic Cyclone stage 5 Main problem : Chlorine attack on the anchors. The roof lining had sagged (dropped) by 5 -15cm in some areas. This was very dangerous!

CYCLONE ROOF – CAST LINING Solution : Low porosity castable Alkali-resistant semi- insulating castable D39A Di1300A

CYCLONE ROOF – CAST LINING Solution : 1.Low porosity castable 2.Alkali resistant semi- insulating castable Installed in cycl. 5 : Jan 2005 Installed in cycl. 4 : Jan 2006

CYCLONE ROOF – CAST LINING Cyclone roof after 1 year

CYCLONE ROOF – CAST LINING Cyclone roof after 3 years The anchors were corroded near the outlet pipe so a strip approx. 50cm wide was removed and the castable repaired with new anchors.

CYCLONE ROOF – CAST LINING (XX plant, Czech Republic) Cyclone roof stage 5 : Now 6 years and 9 months old Cyclone roof stage 4 : Now 5 years and 9 months old A very robust lining : Low-cement castable D39A (thickness 115mm) Semi-insulating castable Di1300A (thickness 100mm)