Presentation is loading. Please wait.

Presentation is loading. Please wait.

BusinessCem Conference, Prague December 13, 2011 BEUMER Group, KOCH Holding, a.s. Usti nad Labem, Czech Republic Storage, Dosing and Conveying of Secondary.

Similar presentations


Presentation on theme: "BusinessCem Conference, Prague December 13, 2011 BEUMER Group, KOCH Holding, a.s. Usti nad Labem, Czech Republic Storage, Dosing and Conveying of Secondary."— Presentation transcript:

1 BusinessCem Conference, Prague December 13, 2011 BEUMER Group, KOCH Holding, a.s. Usti nad Labem, Czech Republic Storage, Dosing and Conveying of Secondary Alternative Fuels

2 Agenda The BEUMER Group introduction Solution of storage, dosing and conveying of secondary alternative fuels to preheater tower in LAFARGE Cement Cizkovice plant -General and business information -Technical parameters and highlights Other references in cement industry

3 The BEUMER Group introduction Solution of storage, dosing and conveying of secondary alternative fuels to preheater tower in LAFARGE Cement Cizkovice plant -General and business information -Technical parameters and highlights Other references in cement industry

4 The BEUMER Group The BEUMER Group is an independent and in third generation managed family- owned enterprise Head OfficeBeckum (Germany) Founded1935 Turn-over351.1 million EUR (in 2010) Employees2500 world wide Product Range -Conveying and Loading Technology -Palletizing and Packaging Technology -Sortation and Distribution Systems

5 The BEUMER Group Associated companies, sales agencies and own subsidiaries in more than 70 countries KOCH Holding, a.s. -Founded 1991, member of BEUMER Group since 2010 -Domain - supply of conveying and loading technology for power and cement industry © BEUMER Group /5

6 The BEUMER Group introduction Solution of storage, dosing and conveying of secondary alternative fuels to preheater tower in LAFARGE Cement Cizkovice plant -General information -Technical parameters and highlights Other references in cement industry

7 LAFARGE Cement Cizkovice Project Specification InvestorLAFARGE Cement, a.s. LocationCizkovice plant, Czech Republic Project goals -Storage hall for secondary alternative fuels inside the plant -Dosing technology located inside the hall for dosing of materials to the pipe conveyor -Pipe conveyor for transport of materials from the hall to the existing preheater tower © BEUMER Group /7

8 Basic engineering Detail engineering (incl. project documentation for building permit) Delivery of equipment Hall building-up supervision Erection and start-up Additional service -Customer service -Spare parts -Modernization and re-equipment © BEUMER Group /8 OUR COMPETENCE = COMPLEX ASSURANCE OF THE PROJECT Project Description

9 Main project parameters Purpose Manipulation and environmental storage of separate materials Conveying of materials incl. their mixtures to preheater Materials Secondary alternative fuels – medium-cohesive material containing slightly sticky ingredients (sludges, crushed tyres, industrial pellets) Capacity Storage hall – approx. 1100 m 3 Conveying – up to 25 t/h Operation Fully automatic Safe Ecological Investment (budget) Approx. 2.6 million EUR © BEUMER Group /9

10 Flow Sheet © BEUMER Group /10 MATERIAL INLET MATERIAL OUTLET HALL CONVEYING TO PREHEATER TOWER Bridge crane Dosing system Storage area Pipe conveyor Oversized pieces separation

11 Requirements and Limitations Maximum storage capacity within a limited area Entrance for trucks with the 10 m long tipper Reduction of dust, noise, etc. Bridge crane inside the hall without permanent presence of staff Variable arrangement inside the hall Two dosing lines with possible mixing of materials (variable mixing ratio) Possible extension of dosing lines up to four Separation and transport of oversized pieces Hoppers for maximum variability of conveyed materials Ecological technology - low operation costs © BEUMER Group /11

12 Before we started … © BEUMER Group /12

13 … after we finished © BEUMER Group /13

14 Time Schedule Period of realization of entire project -The hall 08/2009 – 05/2010 (10 months) -The dosing technology 08/2010 – 01/2011 (6 months) -The pipe conveyor 06/2010 – 01/2011 (8 months) © BEUMER Group /14 Project part Period 200920102011 The storage hall The pipe conveyor The dosing technology Aug 2009 Jan 2011

15 Benefits of Technical Solution Reasonable investment costs Environment friendly solution and operation -Protection of conveyed material against external influences -Protection of the environment against escaping material (dust free transport) -Higher level of automation Possible mixing of materials to be burned in an exact ratio Easy maintenance along the entire route of the conveyor from the walkway side Low maintenance costs High reliability Low space requirements High operational safety © BEUMER Group /15 An evidence of nature friendly solution (bird’s nesting on pipe conveyor walkway)

16 The BEUMER Group introduction Solution of storage, dosing and conveying of secondary alternative fuels to preheater tower in LAFARGE Cement Cizkovice plant -General and business information -Technical parameters and highlights Other references in cement industry

17 Material Flow in Details © BEUMER Group /17 HALL PIPE CONVEYOR Bridge crane Dosing systems Rotating separator Apron conveyor Dosing belt Hopper Belt conveyor for oversized pieces (to outside container) Cleaning chain conveyor Discharging station (at preheater tower) Charging station MATERIAL INLET MATERIAL OUTLET Pile material

18 Hall Parameters and Highlights Size (length x width x height): 42 x 24 x 12 m Two level floor -for manipulation and storage with materials -for dosing technology Steel-concrete structure with trapezoidal metal sheets Equipment -Bridge crane with a grab loader -Dosing technology Transportable separation wall Highlights -Automatic mode of bridge crane -Continuous optical scanning of stored material -Drainage groove across the hall to catch possibly toxic fire products into two tanks © BEUMER Group /18

19 Dosing Technology Parameters and Highlights Two dosing lines: 2x10 t/h (2x6.5 kW) Composition of each line: hopper – apron conveyor – rotating separator – Schenck dosing weight + belt conveyor for oversized pieces for both lines Two free positions for other dosing lines Highlights -Dual system for separation of oversized pieces and conglomerates Rough separation on grid above the hoppers (max. size of 150 mm) Unique rotating separator downstream the apron conveyor (max. size of 75 mm) -Differently shaped hoppers for different type of materials -Dual way to satisfy the control range 0.5 – 10 t/h © BEUMER Group /19

20 Pipe Conveyor Parameters and Highlights Max. capacity:25 t/h (presently 10 t/h) Pipe diameter:150 mm Conveyor length:140 m Lifting height:36.7 m Transport speed: 2 m/s (presently 1.1 m/s) Installed power: 30 kW Highlights -Long charging station enables loading from 2 dosing lines -Walkway with stairs along entire route (topmost inclination 24°) -Designed for planned increase in capacity (after reconstruction of preheater tower) © BEUMER Group /20

21 The BEUMER Group introduction Solution of storage, dosing and conveying of secondary alternative fuels to preheater tower in LAFARGE Cement Cizkovice plant -General and business information -Technical parameters and highlights Other references in cement industry

22 LAFARGE Ciment Hoghiz / Romania System:Ø 150 x 111 m Material: secondary fuel Capacity: 10 t/h Belt speed: 2.1 m/s Motor power:22 kW Lifting height: 24 m Year of comm.:2007 (renewed 2011) © BEUMER Group /22 System:Ø 200 x 211 m Material: secondary fuel Capacity: 15 t/h Belt speed: 1.78 m/s Motor power:30 kW Lifting height: -1.5 m Year of comm.:2011

23 LAFARGE Cement Beocin / Serbia System:Ø 150 x 115 m Material: coal Capacity: 50 t/h Belt speed: 1.25 m/s Motor power:30 kW Lifting height: 27.4 m Year of comm.:2009 © BEUMER Group /23

24 BASTAS / Turkey System:Ø 250 x 206 m Material: secondary fuel Capacity: 10 t/h Belt speed: 1 m/s Lifting height: 48.9 m Year of comm.:2008 © BEUMER Group /24

25 Indocement / Indonesia System:Ø 300 x 340 m Material: fuels Capacity: 200 t/h Belt speed: 1.35 m/s Lifting height: 89 m Year of comm.:2007 © BEUMER Group /25

26 Povazska cementaren Ladce / Slovakia System:Ø 150 x 108 m Material: secondary fuel Capacity: 15 t/h Belt speed: 1.35 m/s Motor power:18.5 kW Lifting height: 34.5 m Year of comm.:2005 © BEUMER Group /26

27 AddressKOCH Holding a.s. Brnenská 1030/6 40001, Usti nad Labem Czech Republic Phone+420 475 259 700 Fax+420 475 211 932 E-mailKOCH@BEUMER.com Webwww.BEUMER.com CONTACT

28 Thank you for your attention! © BEUMER Group /28


Download ppt "BusinessCem Conference, Prague December 13, 2011 BEUMER Group, KOCH Holding, a.s. Usti nad Labem, Czech Republic Storage, Dosing and Conveying of Secondary."

Similar presentations


Ads by Google