Presentation is loading. Please wait.

Presentation is loading. Please wait.

2016 Maintenance Innovation Challenge

Similar presentations


Presentation on theme: "2016 Maintenance Innovation Challenge"— Presentation transcript:

1 2016 Maintenance Innovation Challenge
Title PROBLEM STATEMENT BENEFITS Reduce flow time and cost One project reduced time for custom repair fitting by 3 weeks Reduced wait time for form blocks by 2 months when cast from ABS plastic Sustainment of aging aircraft presents unique challenges due to the lack of complete technical data, aging legacy tooling, and the need to rapidly respond to unanticipated repairs to a wide variety of aircraft and exchangeable end items. TECHNOLOGY SOLUTION GRAPHIC Leveraged 3D laser scanning, additive manufacturing, and castable materials Solutions include using fused deposition modeling to print weld fixtures containing internal flow cavities for argon cooling out of high temperature Ultem based polymer material to resist melting


Download ppt "2016 Maintenance Innovation Challenge"

Similar presentations


Ads by Google