LCWS2010, Beijing, 2010 MAR29 Ivo Polák, FZU, Prague1 LED notched fibre system at AHCAL Calibration system for SiPM Ivo Polák 1.Notched fibre.

Slides:



Advertisements
Similar presentations
Jiri Kvasnicka, EUDET meeting at DESY 1 Optical fibre calibration system Jiri Kvasnicka Outline Results from recent tests – LAB Test.
Advertisements

HH Dec 13Ivo Polák, FZU, Prague1 LED notched fibre distributing system QMB1 single LED slice Ivo Polák, on behalf prague’s group 1.QMB1.
Optical Fiber Calibration System and Adaptive Power Supply Jiri Kvasnicka, Ivo Polak, Jaroslav Cvach Prague, Institute of Physics Gerald Eigen,
LED calibration systems for CALICE hadron calorimeter June 11, 2011TIPP 2011, Chicago1.
Calice, UT ArlingtonJiri Kvasnicka, FZU, Prague1 LED notched fiber system Jiri Kvasnicka 1.Introduction 2.Test setup and fiber layout on HBU0.
Ivo Polák SiPM needs short optical pulses
LED calibration systems for CALICE hadron calorimeter Jiri Kvasnicka, Ivo Polak Institute of Physics (FZU), Prague June 11, 2011TIPP 2011, Kvasnicka1 The.
ECFA, JUN10, 2008Ivo Polak, IPASCR, Prague1 Electronics part of AHCAL calibration system ECFA meeting at Warszawa.
Sep 13, 2007CALICE Collaboration Meeting Prague 1 Long term test of LED pulsing  Long LED system stability measurement  Aging of part of optical system.
EUDET, OCT8 - 10, 2007 Ivo Polak, IoP Prague1 A fast LED driver prototype for HCAL calibration EUDET annual meeting at Ecole Polytechnique, Palaisau.
External calibration system - QMB6 Distribution of light: Notched Fiber Calibration and Monitoring Board (CMB) 1-ch LED driver (QMB1) Calibration System.
DESY, DEC-2013Ivo Polák, FZU, Prague1 Activity on Adaptive power & Calibration at Prague Ivo Polák, on behalf of Prague’s group QMB1A update.
Tests of the fiber-based calibration system CALICE collaboration meeting Cambridge, UK 2012/9/18 Jaroslav Zalesak Institute of Physics, Prague  QMB1 LED.
Mathias Reinecke CALICE meeting Argonne EUDET module – Electronics Integration Contents -Next prototype : architecture -HCAL Base Unit (HBU)
Feb 20, 2009 CALICE meeting, Daegu, Korea QRL in Magnetic Field 1 QRLed Driver in Magnetic Field Jaroslav Zalesak Institute of Physics of the ASCR, Prague.
Optical calibration system for EUDET AHCAL module Jaroslav Cvach IPASCR 1.Calibration system for SiPM photodetectors 2.QRLED driver photoelectron spectra.
AHCAL – Electromechanical Integration EUDET annual meeting – Paris Oct M. Reinecke.
LED calibration systems for CALICE hadron calorimeter Jiri Kvasnicka Institute of Physics, Prague June 11, 2011TIPP 2011, Chicago1 Under.
LED calibration systems for CALICE hadron calorimeter
AHCAL Electronics. Status EUDET Prototype Mathias Reinecke for the DESY AHCAL developers EUDET Electronics/DAQ meeting London, June 9th, 2009.
AHCAL Electronics. Front-end electronics and DAQ Mathias Reinecke CALICE meeting Hamburg March 21st, 2013.
Uni Bergen:G. Eigen, J. Zalieckas, E. van der Kraaij FZU Prague: J. Cvach, J. Kvasnicka, I. Polák CALICE meeting, Argonne, 19/03/2014.
2013 MAR 21Ivo Polák FZU Prague1 Tasks for AIDA SiPM Adaptive HV PSU AIDA subgroup Prague 2013 meeting Characterization of temperature influence to SiPM.
AHCAL Electronics. Status Commissioning and Integration Peter Göttlicher for the AHCAL developers CALICE meeting UT Arlington, March 12th, 2010.
Calibration UV LED system for CALICE scintillator based Tile Hadron Calorimeter Ivo Polák on behalf of the CALICE Collaboration Institute of Physics of.
LCWA, ALCPG 2009 Albuquerque, NM Ivo Polák, FZU, Prague1 Calibration system of CALICE AHCAL detector Ivo Polák 1.Two calibration light distribution.
AHCAL Electronics. Status and Outlook Mathias Reinecke CALICE collaboration meeting Cambridge, UK March 16th-19th, 2012.
CALICE ANL, MAR18, 2008 Ivo Polak, IPASCR, Prague1 A fast LED driver prototype for HCAL calibration CALICE meeting at ANL, USA.
Light Calibration System (LCS) Temperature & Voltage Dependence Option 2: Optical system Option 2: LED driver Calibration of the Hadronic Calorimeter Prototype.
Munich, 18 Oct 2006J. Cvach, annual JRA31 JRA3 Institute of Physics ASCR Prague 1.ECAL, VFCAL (V. Vrba) 2.HCAL (J. Cvach) 3.Exchange in NA2 (travels 8.5.
1. DESY tests 2. Electronics developments 3. Optical developments 4. Outlook Casablanca J. Cvach, CALICE Coll. meeting.
AHCAL Status. Electronics and DAQ Mathias Reinecke CALICE meeting Argonne ANL, Mar. 19th, 2014.
Uni Bergen:G. Eigen, E. van der Kraaij, J. Zalieckas FZU Prague: J. Cvach, J. Kvasnička, I. Polák Linear Collider Workshop, Tokyo 13/11/2013.
ANL, MAR-2014Ivo Polák, FZU, Prague1 Activity on Compass 2 detector with Calibration at Prague Ivo Polák, on behalf of Prague’s group Compass.
HCAL – Integration Plans Mathias ReineckeHCAL – Main meeting Introduction 2.HCAL Base Unit (HBU) - Update 3.Testboards 4.Light Calibration System.
Optical Part of the CMB for AHCAL-CALICE Jaroslav Zalesak Institute of Physics, Prague.
R&D for a 2nd generation AHCAL prototype LCWS 2007 – DESY Hamburg Mathias Reinecke on behalf of the AHCAL partners.
May - 20Ivo Polák, FZU, Prague1 LED notched fibre distributing system Calibration system for SiPM Ivo Polák, on behalf prague’s group
5 July 2010Ivo Polák, FZU, Prague LED notched fibre distributing system Calibration system for SiPM Ivo Polák, Ji ř í Kvasni č ka
AHCAL Electronics. Status Commissioning Mathias Reinecke for the AHCAL developers HCAL main meeting Hamburg, Dec. 10th, 2009.
AHCAL Physics Prototype. The Electronics Part Mathias Reinecke for the AHCAL developers DESY, March 2nd, 2010.
AHCAL Electronics. SPIROC2 and HBU measurement results Mathias Reinecke CALICE main meeting Univ. HASSAN II, Casablanca, Morocco Sept. 23rd, 2010.
oct - 6Ivo Polák, FZU, Prague1 Calibration system for SiPM and LED notched fibre distributing system Ivo Polák, on behalf prague’s group
LED calibration systems for CALICE hadron calorimeter Jiri Kvasnicka, Ivo Polak, Institute of Physics, Prague June 11, 2011TIPP 2011, Kvasnicka1 The CALICE.
Scintillator tile – SiPM development at ITEP Michael Danilov, ITEP CALICE Meeting, Casablanca, 23 Sep 2010.
Main HCAL, JUL1,2008Ivo Polak, IP_ASCR, Prague1 Calibration system with optical fibers HCAL main meeting, DESY.
Mathias Reinecke AHCAL Main Meeting Electronics Integration - Status Mathias Reinecke for the AHCAL developers.
The 2 nd SCECAL module for the Fermilab beam test - tentative idea - S. Uozumi (Shinshu) Jun GLDCAL meeting Next beam test will be held likely.
ShinShu, 2012 Mar 6Ivo Polák, FZU, Prague1 LED notched fibre distributing system QMB1 with HBU2 test Ivo Polák, on behalf of Prague’s group
AHCAL Electronics. integration status and open issues Mathias Reinecke CALICE main meeting Univ. HASSAN II, Casablanca, Morocco Sept. 23rd, 2010.
2011 Sept 14-16Ivo Polák, FZU, Prague1 LED notched fibre distributing system QMB1 single LED slice Ivo Polák, on behalf prague’s group 1.QMB1.
AHCAL Electronics. Status and Outlook Mathias Reinecke for the AHCAL developers CALICE Days DESY Hamburg, March 31st, 2009.
Annual EUDET, OCT6,2008 Ivo Polak, IP_ASCR, Prague1 Calibration system with optical fibers for AHCAL EUDET annual meeting, NIKHEF 1.Introduction 2.QRLed.
AHCAL Integration. Status and Outlook Mathias Reinecke for the AHCAL developers CALICE week Lyon IPNL, Sept. 16th – 18th, 2009.
DESY, 8 Dec 2005J. Cvach, prekick-off JRA3 JRA3 Institute of Physics ASCR Prague 1.ECAL, VFCAL (V. Vrba) 2.HCAL (J. Cvach) 3.Exchange in NA2 (travels 8.5.
AHCAL Electronics. Status of Integration Mathias Reinecke for the DESY AHCAL developers AHCAL main and analysis meeting Hamburg, July 16th and 17th, 2009.
AHCAL Electronics. Status Commissioning Mathias Reinecke for the AHCAL developers EUDET electronics and DAQ meeting Paris Palaiseau, Jan. 14th, 2010.
AHCAL Electronics. status and open issues Mathias Reinecke CALICE ECAL/AHCAL - EUDET electronics and DAQ - AIDA DESY, July 5th to 6th, 2010.
LED notched fibre distributing system Calibration system for SiPM
JRA3 Institute of Physics ASCR Prague
LED notched fibre system short HBU0 party with QMB6
A fast LED driver prototype for HCAL calibration
CALICE meeting 2007 – Prague
HCAL task status report
LED notched fibre system at AHCAL Calibration system for SiPM
HCAL Modules -First Ideas
CALICE meeting 2007 – Prague
Status of the EUDET Prototype
A fast LED driver prototype for HCAL calibration
Scintillator HCal Prototype
Presentation transcript:

LCWS2010, Beijing, 2010 MAR29 Ivo Polák, FZU, Prague1 LED notched fibre system at AHCAL Calibration system for SiPM Ivo Polák 1.Notched fibre light distribution systems 2.A Set-up, with provisional fibre layout 3.Toroidal inductor at PCB 4.LED optical power 5.Plans for Conclusions

LCWS2010, Beijing, 2010 MAR29 Ivo Polák, FZU, Prague2 Requirements to calibration system for SiPM based detectors Generate uniform near-visible UV flashes controllable in amplitude 0 to max = twice SiPM saturation pulse width a few ns enabling each LED individually optical feedback from LED to PIN-PD signal channel LED triggering from DAQ Readout temperature from sensors placed in the scintilator plane (12bits minimum) Some (USB, CANbus,…) interface to Slow-control Stability in magnetic field

LCWS2010, Beijing, 2010 MAR29 Ivo Polák, FZU, Prague3 Flashing UVLED - 2 methods Light distributed by notched fibres Light distributed directly by microLED to the scintillator - distributed LEDs Institute of Physics ASCR, Prague, (= FZU) Shinshu University DESY Hamburg UNI Wuppertal smd UVLED

LCWS2010, Beijing, 2010 MAR29 Ivo Polák, FZU, Prague4 Notched fiber system advantage – tuneable amplitude of LED light from 0 to 50 mips Variation of LED amplitude does not affect the SiPM response readout LED circuit and LEDs enable optical pulses with around 5ns width Spread of light intensity from notches can be kept under 20% disadvantage LED with control unit outside the detector volume Notched fibre production is not trivial Notched fibre routed at HBU0, taps illuminates the scintillators via special holes Nice idea, but... Spiroc1 area is not working Spiroc1 Spiroc2

LCWS2010, Beijing, 2010 MAR29 Ivo Polák, FZU, Prague5 Notched fiber layout on HBU0 at DESY dec2009 Picture: Notched fiber was illuminated by small pocket spotlight. Most of 12 notches are above alignment pins Spiroc 2 area Fiber was fixed by strips of a tape in the correct position.

LCWS2010, Beijing, 2010 MAR29 Ivo Polák, FZU, Prague6 Setup QMB6 (QRLED system) + HBU0 From HBU0 (calib board): signal T-calib LVDS only 60ns Delay power +15V/0.16A CANbus slow- control One UVLED 5mm One Notched fibre Almost plug and play Control: LabView 8.2 exe-file, One PC with DAQ, USB --> CAN

LCWS2010, Beijing, 2010 MAR29 Ivo Polák, FZU, Prague7 Control panel of QMB6 in LabView 8.2 Controls individual LED amplitude LED Enables Trigger mode ext/internal Measure temperature CANbus control It can work as Exe file

LCWS2010, Beijing, 2010 MAR29 Ivo Polák, FZU, Prague8 ONOFF QMB6 ON/OFF test ON ON means T-calib on, LED off OFF OFF means +15V power off NO pedestal shift! NO unwanted ground coupling!

LCWS2010, Beijing, 2010 MAR29 Ivo Polák, FZU, Prague9 Single p.e. spectrum Calibration mode, High Gain Low statistic there

LCWS2010, Beijing, 2010 MAR29 Ivo Polák, FZU, Prague10 CMBQRLED Single photoelectron spectra with CMB and QRLED CMB in tuning position at AHCAL TB 2007 CERN QRLed drive SiPM, single p.e. spectra taken at Prague SEP’09 LED light 400nm to SiPM on 5mmsci tile SiPM on 5mm sci tile NEW OLD More info about CMB can be found at: hep2.fzu.cz/calice/files/ECFA_Valencia.Ivo_CMB_Devel_nov06.pdf one of the single p.e. spectra 

LCWS2010, Beijing, 2010 MAR29 Ivo Polák, FZU, Prague11 Next day we found a misalignment of the fibre Electrical tape and bent fibre is not the right combination!

LCWS2010, Beijing, 2010 MAR29 Ivo Polák, FZU, Prague12 Linearity test (it means a saturation curve) Settings: Cf = 400fF Low gain mode We do not see saturation effect, yet. Better optical coupling alignement is a must. – strong misaligment effect Higher LED pulse can be made with larger pulse-width (3.7 → 7ns) Very preliminary More details in talk of J. Kvasnicka, CALICE 2010 Arlington

LCWS2010, Beijing, 2010 MAR29 Ivo Polák, FZU, Prague13 Conclusions to common test HBU0 with QMB6 Easy implementation, almost plug and play installation Both methods of light distribution are tested in HBU0 EUDET prototype With QMB6 we can see a nice single p.e. spectra, similar to distributed LEDs We do not see saturation of SiPM yet, better optical coupling is a must. We have to focus on this detail. We would like to make more tests in the future, focusing on the optical coupling We can integrate a few QRLED to new version of HBU Special thanks to Mathias Reinecke and FLC group.

LCWS2010, Beijing, 2010 MAR29 Ivo Polák, FZU, Prague14 Quasi-Resonant LED driver Less RFI, not sensitive to magnetic field – tested up to 4T PCB integrated toroidal inductor (~35nH) Fixed pulse-width (~4ns) LED current 1V => 1A PIN signal 4ns/div 1A pp To be increased, to get more light. Larger pulse  Larger inductor GET more light!

LCWS2010, Beijing, 2010 MAR29 Ivo Polák, FZU, Prague15 Test PCBs with toroidal inductor Collaboration Meeting 60 x 30 mm^2 30 x 60 mm^2 4 layers  11 turns  9 turns 3 PCB thicknesses: 0.65, 1.6, 3.2mm 1.Test mechanical dimension, thickness of PCB on inductance 2.test GND-plane influence

LCWS2010, Beijing, 2010 MAR29 Ivo Polák, FZU, Prague16 Ground plane, an effect of different coupling to the coil Inner layer 1

LCWS2010, Beijing, 2010 MAR29 Ivo Polák, FZU, Prague17 Top layer, Top layer, pads at right are for smd capacitors L C C 1. First to measure resonant frequency of parasitic capacitors, only. 2. To get value of L, we add larger parallel C, all 100pF with tolerance 1%, And measure the resonance frequency by GDO meter. GDO = Grid Dip Meter, handy instrument to measure resonant frequency of LC circuit After recalculating, we can see a spread of L and parasitic C (effect of GND layer)

LCWS2010, Beijing, 2010 MAR29 Ivo Polák, FZU, Prague18 Toroidal inductor test PCB Data is missing here,  …delayed PCB delivering, to be tested in April stay tuned !

LCWS2010, Beijing, 2010 MAR29 Ivo Polák, FZU, Prague19 LED, optical power test DC and pulsed Optical Power Meter PM100D with Si sensor S130D by Thorlabs Some LEDs intended to calibration Prague, March 2010

LCWS2010, Beijing, 2010 MAR29 Ivo Polák, FZU, Prague20 Optical Power transformation efficiency at “old CMB” 400nm LED 5mm DC mode Power consumption 3.3V*20mA = 66 mW Optical = 2.6 mW Efficiency = 4% but temperature runaway Pulse mode (1Hz, 2.7ns current pulse) Power dissipation at LED = 10nW (very rough scope measurement) Optical = 0.5nW Efficiency = 5% Results –Flashing with 3ns pulses does not drastically affect the efficiency of transformation of electrical pulse to optical (compared to DC) –Peak pulse optical power is ~70x higher than DC –Optical energy in pulse ~2nJ ~  4 x10^9 photons Test setup: Optical Power Meter PM100D with Si sensor S130D by Thorlabs More informations on LED can be found at hep2.fzu.cz/calice/files/ECFA_Valencia.Ivo_CMB_Devel_nov06.pdf

LCWS2010, Beijing, 2010 MAR29 Ivo Polák, FZU, Prague21 Plans for the 2010 Main focus: Increase of the optical performance: Extend the pulse width from current 3.5 ns improve optical coupling from LED into the fiber improve the transmission to the scintillation tile New QR LED driver prototype (Q3/2010) 1 channel per board different onboard inductors for different pulse width in range of 4 ~ 10 ns 3cm PCB width to match the tile size Notched fiber production (Q4/2010) 6 new notched fibers with 72 notches each dimensions of the notches need to be synchronized with HBU

LCWS2010, Beijing, 2010 MAR29 Ivo Polák, FZU, Prague22 Prague group is working further on notched fibre calib system. Two optical methods for SiPM calibration in AHCAL under investigation Notched fibres Distributed LEDs For each method UVLED driver has been developed, still recent optimizing to be done QRLED driver has tunable light amplitude and generates clear p.e. spectra QRLED driver is not sensitive to magnetic field in the range 0 ÷ 4 T Both methods will be tested in HBU0 EUDET prototype Conclusion

LCWS2010, Beijing, 2010 MAR29 Ivo Polák, FZU, Prague23 Back up Ref:

LCWS2010, Beijing, 2010 MAR29 Ivo Polák, FZU, Prague24 6-LED QR driver Main Board = QMB6 Consists: - 6 QR LED drivers - 2 PIN PD preamps - CPU + communication module, CANbus - Voltage regulators - temperature and voltage monitoring

LCWS2010, Beijing, 2010 MAR29 Ivo Polák, FZU, Prague25 Details of distributed LEDs Small UV LED, smd size 1206 and 0603 top bottom