CERN, November 25, 2003 – Technical Board Support chariot for ITS & FMD services on the RB24 side Foreward –This presentation reports the current ideas.

Slides:



Advertisements
Similar presentations
Optical Manufacturing Solutions 1 Probe Assembly.
Advertisements

Click on this image to open the full PDF document.
CMS ZDC Crane Emergency Payload Removal Procedures This document proposes the viability of using a portable hydraulic actuator Hand crane (Davit crane)
Air tank installation instructions Included parts: Raw aluminum air tank bracket 5/16-18 button head bolts (qty 4) M8x1.25 button head bolts (qty 4) M8.
ITS /MFT installation concept CERN 27 September 2012 Corrado Gargiulo.
Components for the low- maintenance switch Components for the low maintenance track Schwihag RBH system.
1.  Preparation of larger parts in a Clean room Class (ISO7)  Preparation of smaller parts in a “baldaquin” annex  Assembly in a clean-room Class.
Procedures during Tracker Connection WPA meeting 3 rd December 2007, Michael Eppard, CERN Installation sequence Manpower needs for installation work.
MICE Hall – South Mezzanine Jason Tarrant - STFC l Contents »Device checks with current South Mezzanine »South Mezzanine change summary »Conclusion.
AMS-02 tracker mechanics status of assembly and integration at UniGe Outer planes: - Tests of evaporator (cooling loop) integration - Tools to develop.
A. Bross Imperial College – 9/04 Status of VLPC Cryo-Cooler Cryostat Design Russ Rucinski (Alan Bross) Fermilab.
AMS-02 tracker mechanics status of assembly and integration Inner tracker integration completion: - Assembly and cabling - Temperature and magnetic field.
Progress on the MICE 201 MHz Cavity Design Steve Virostek Lawrence Berkeley National Lab RF Working Group Fermilab August 22, 2007  automatic.
Status of VLPC Cryo-Cooler Cryostat Design Russ Rucinski (Alan Bross) Fermilab.
1 Installation of Delphi Frame  ITS Installation.
Background to the current problem 1. As a result of the high stresses in the bobbin due to the magnet load, the bobbin end plate needs to be increased.
Don Lynch 9/15/05 HBD Safety Review 1 Mechanical Design And Installation Hadron Blind Detector (HBD) Don Lynch.
EA meeting, Wednesday 6 Dec 2006 TT installation, Jeroen van Tilburg 1 TT installation Installation of the TT station.
ZQNA Electrostatic Quadrupoles for ELENA Transfer Lines 1.Conceptual design 2.Performance 3.Engineering details 4.Interfaces 5.Production planning D. Barna,
Alignment and assembling of the cryomodule Yun He, James Sears, Matthias Liepe MLC external review October 03, 2012.
1 Cryostat assembly, integration and commissioning procedures M.Olcese Version: 07 May 2008.
18 November 2010 Immanuel Gfall (HEPHY Vienna) SVD IR Mechanics 7 th B2GM.
MQXF Cold-mass Assembly and Cryostating H. Prin, D. Duarte Ramos, P. Ferracin, P. Fessia 4 th Joint HiLumi LHC-LARP Annual Meeting November 17-21, 2014.
Pixel Support Tube Requirements and Interfaces M.Olcese PST CDR: CERN Oct. 17th 2001.
Ron Madaras, LBL U.S. Pixel Meeting, SCIPP, July 9-10, 2003 Patch Panel 1 (PP1) Brief Review Cost and Effort Estimate.
RFCC Module Design Update  automatic tuners  cavity suspension  cavity installation Steve Virostek Lawrence Berkeley National Lab MICE Collaboration.
1 Belle II IR 2 Shuji Tanaka KEK Joint Belle II & superB Background meeting 2012//Feb/ 8-9th 1.
Tomelleri S.r.l. ® Copyright 2007 © ASTRONOMY AND RESEARCH September 19th 2008 VST Meeting1.
Installation Review March ‘03 L.Simonetti – INFN Torino 1 ITS - FWD - beam pipe installation  Elements considered ITS (=SPD+SDD+SSD), FWD (=V0 R, T0 R,
MICE Integration Engineering Jason Tarrant - STFC l Contents »Device Interfaces – General »AFC »Spectrometer Solenoids »RFCC »EMR / KL »South Mezzanine.
ZDC Remote Handling Tool Structure and Force Analysis P. Debbins University of Iowa December 10, 2009.
PRY Implementation - Contents l Fit with Experimental Devices (& services connections) l Fit with Tracker Cryo l Fit with Floor & Trench l Fit with Mezzanine.
ATLAS 1 Beam Pipe Support Structure (BPSS) Interface and Assembly Final Design Review, April 2003 E. Anderssen, N. Hartman LBNL.
ATLAS 1 Beam Pipe Support Structure (BPSS) Services Interface and Assembly Final Design Review, April 2003 E. Anderssen, N. Hartman, A Smith, LBNL S. Coelli,
Integration with LDC & Push-pull impact on LumiCal Wojciech Wierba Institute of Nuclear Physics PAN Cracow, Poland FCAL Workshop, LAL Orsay,
RICH1 Gas Enclosure Installation. Experimental Area Meeting at CERN on 21st June 2006 Bill Cameron (Imperial College London) on behalf of the RICH1 team.
18 June 20031Integration Review B. Schmidt Outline: Overview of the support structures Requirements –Some details on electronics, cabling and piping Constraints.
G.Barber Mice Tracker Mechanical Progress Tracker Mechanical Progress Contents:- Station Space Frame Station Layout Light Guide Map Connectors Patch.
UPDATE ON ID INTEGRATION Alice TB, E.Rosso ALICE TECHNICAL BOARD CERN, Ettore Rosso / CERN 1. 3 rd Cone 2. V0_L and Si_3 support 3.
Presentation by ANAS AHMAD ME1 B1 batch Submited to
V. Bobillier1 Cable installation status.
Alignment and assembling of the cryomodule Yun He, James Sears, Matthias Liepe.
Building LEGO Robots For FIRST LEGO League By Dean Hystad
TB Peter Glässel, Heidelberg1 Preparing TPC Installation.
ICARUS Collaboration Meeting Dec A. Scaramelli.
SPS movable table Joanna Swieszek, Kurt Artoos (EN-MME) 14/04/2016.
Dan Cheng 8/27/2015 MQXFS1 Observations and Feedback from the Assembly Processes, Part II.
Cryomodule Interconnect Installation Issues A Comparison of XFEL to LCLSII Karen Fant 7/29/2015.
Sébastien MICHALMarch Sébastien MICHALMarch 2009 EES 1 GROOVE EES 1 laid on table to be milled EES 1 laid on table to be milled –Move horizontally.
Status of the Yoke Interfaces Presented by Evgeny Koshurnikov February 2013.
The HiLumi LHC Design Study is included in the High Luminosity LHC project and is partly funded by the European Commission within the Framework Programme.
Inner Triplet Review 1 H. Prin AT/MEL Activities on the triplets at CERN Reception and Acceptance Triplet String Assembly in Building 181 Handling and.
Radiation Shutter Re-Purposing Roy Preece STFC RAL 18 th December 2014.
EUDET HCAL prototype; mechanics Felix Sefkow Work by K.Gadow, K.Kschioneck CALIC collaboration meeting Daegu, Korea, February 20, 2009.
What is TETRIX? If you can dream up a robot design, you can build it with the TETRIX Robotics Design System.
MQXC Nb-Ti 120mm 120T/m 2m models
conventional rear wheel drive, a beam axle assembly
Escalator Installation
Present status of the flux return yoke design
Conic Sections Advanced Higher Graphic Communication - Conic Sections
Installation step 4. (3 days)
LumiCal mechanical design, integration with LDC and laser alignment
Integration issues at IHEP
The 11T cryo-assembly: summary of design and integration aspects
Design of Distribution Feedbox at LHC P7
Integration and IR Hall
On the accuracy of port assembly at Wendelstein 7-X
BCM Overview Placement such that system is sensitive to all types of beam accidents. => 2 independent subsystems Halo losses inside the Pixel volume ie.
Cryomodule Assembly Plan
Bunker Wall Design Wall ESS
Presentation transcript:

CERN, November 25, 2003 – Technical Board Support chariot for ITS & FMD services on the RB24 side Foreward –This presentation reports the current ideas to solve the problem of moving the ITS services out of the PMD acceptance cone –To fit in the existing installation procedure, the chariot supporting the ITS and FMD services is made of two, upper and lower, halves –There are still 4 identified open problems, which will be described in details; therefore the present procedure should not be considered as a finalized design L.Simonetti

CERN, November 25, 2003 – Technical Board Y-Z plane cut-view of the ITS+FMD services and of their support chariots Conical section of the service chariot 1 st patch panel for ITS & FMD Support of 1 st patch panel (fixed to the cylindrical section of the service chariot) Cylindrical section of the service chariot Fixation between conical and cylindrical sections of the service chariot Clearance between the TPC and the service chariot 2 nd patch panel Fixation of the service chariot to the TPC service wheel ITS rails beam axis Maximum radius of ITS services & support to allow for TPC sliding-in PMD Temporary cylindrical support of the movable section of the services Int. Point TPC cone

CERN, November 25, 2003 – Technical Board Interferences with the PMD 840 mm (  = 2.18) 740 mm (  = 2.3) 56.3 TPC PMD 9.4° 13.1 ° CP ° ● The minimum clearance with respect to the TPC thermal screen (~20mm), ● the radial thickness of the services (~50mm), ● the presently estimated thickness of the conical section of the chariot (30mm), seem to limit the opening angle of the services to 11.6º 11.6º

CERN, November 25, 2003 – Technical Board Axonometric view of the service trays (upper half chariot) Fixed cylindrical section of the ITS & FMD services Movable section of the ITS & FMD service trays: cylindrical during TPC sliding-in conical when TPC is on Int. Point Hinges of the cable trays 1 st problem: they require flexible pipes (plastic or metal bellows) and prevent tight fastening of cables 1 out of 11 cable trays per quadrant 2 lowered cable trays to allow the TPC sliding-in (room for the tools used for hanging ITS to the TPC) TPC ITS

CERN, November 25, 2003 – Technical Board View of the support chariot and of its tools “Cylindrical” support of the 1 st patch panel for ITS and FMD services (fixed to the cylindrical section of the ITS-service chariot) Cylindrical section of the service chariot with its wheels Conical section of the service chariot with its wheels Temporary cylindrical support of the (closed) service trays, with its wheels rolling on ITS rails Temporary arms supporting the conical section onto the ITS rails Tool to lift the whole chariot in cantilever mode by pushing onto the TPC service wheel Tools to link the base plane of the conical section with the plane of the TPC service wheel. It also lifts the outer end of the chariot.

CERN, November 25, 2003 – Technical Board View of ITS & FMD services assembled onto the whole support chariot

CERN, November 25, 2003 – Technical Board Chariot installation – step 1 ♦ In laboratory, for both the upper and lower half-chariots: ► Services are assembled into their trays ► Fixed section of the trays are assembled onto the chariot cylindrical section ► Movable section of the trays are fixed to the temporary cylindrical support 1 st patch panel for ITS & FMD Support of 1 st patch panel (fixed to the cylindrical section of the service chariot)

CERN, November 25, 2003 – Technical Board Chariot installation – step 2 ♦ Both the upper and lower (not shown) half-chariots are mounted onto the ITS rails and slid through the TPC ♦ Services are then connected to ITS and FMD at the 1 st patch panel TPC TPC Service Support Wheels (SSW)

CERN, November 25, 2003 – Technical Board Chariot installation – step 2 (cut view on Y-Z plane) RB26 TPC SSW TPC 280 mm160 mm C3 and C4 fixation points of ITS rails

CERN, November 25, 2003 – Technical Board Chariot installation – step 3 beam pipe chariot vacuum valve with its chariot ♦ The TPC slides to the nominal position

CERN, November 25, 2003 – Technical Board Chariot installation – step 4 ♦ For both the upper and lower (not shown) half- chariots: ►the conical section of the chariot is slid in ►with appropriate tools it is bolted to the cylindrical section

CERN, November 25, 2003 – Technical Board Chariot installation – step 4 (cut view on Y-Z plane) RB24 TPC SSW TPC 430 mm 320 mm

CERN, November 25, 2003 – Technical Board Chariot installation – step 5 ♦ Two adjustment tools with hinges, mounted on the conical section, are used to find the effective position of the TPC SSW and, then, to bolt the conical section to the SSW. ● They allow to require an SSW positioning accuracy of  2mm

CERN, November 25, 2003 – Technical Board Chariot installation – step 6 ♦ The service trays are opened and fixed to the conical section of the upper and lower chariots ♦ The temporay cylindrical support of the service trays are removed

CERN, November 25, 2003 – Technical Board ♦ The service trails are opened and fixed to the conical section of the chariot. 2 nd problem: the trails nearest to the horizontal plane clash with the C4 support of the ITS rails  1 trails out of 11 should be removed and the services redistributed into 10 trays; feasibility to be verified. Chariot installation – step 6 - problem C4

CERN, November 25, 2003 – Technical Board Chariot installation – step 7a ♦ The third support-point of the beam pipe is fixed by means of the usual 4 wires and collar 3 rd problem: the procedure to execute this step has not yet been completely defined. In particular: ● Fixations of the wires to the TPC face (which has good positioning accuracy) have to be agreed upon with the TPC group (for both the position and the compatibility with the ~400 N wire tension preliminarily requested by the beam pipe group) ● Space between two cable trays has to be provided for the wire feed-through ● Angles of the wires have to be agreed upon with the beam pipe group

CERN, November 25, 2003 – Technical Board ♦ The chariot of the beam pipe and the one of the vacuum valve are removed Chariot installation – step 7b

CERN, November 25, 2003 – Technical Board ♦ The upper and lower chariots are raised in cantilever mode by using the tool (1), pushing onto the TPC SSW, and by exploiting the hinges included in the tools (2) 4 th problem: The stiffness of the TPC SSW has to be verified together with the TPC group Chariot installation – step 8 122

CERN, November 25, 2003 – Technical Board Chariot installation – step 9 ♦ The ITS rails are removed

CERN, November 25, 2003 – Technical Board PMD installation