1 State of Michigan Project Management Methodology Orientation November 2005.

Slides:



Advertisements
Similar presentations
ClosingExecuting/ Controlling ControllingPlanningInitiatingOpportunityAssessment Client AcceptancePlanning ApprovalInitiating ApprovalOpportunity Assessment.
Advertisements

Project Integration Management Sections of this presentation were adapted from A Guide to the Project Management Body of Knowledge 4 th Edition, Project.
Chapter 3: The Project Management Process Groups
Chapter 5: Project Scope Management
Author:Prof.Dr.Tomas Ganiron Jr1 CHAPTER 7 PROJECT EXECUTION, MONITOR & CONTROL PROCESS 7-1 Project Executing process 7-2What is Project monitor & control.
Project Management Methodology (PMM)
4 4 By: A. Shukr, M. Alnouri. Many new project managers have trouble looking at the “big picture” and want to focus on too many details. Project managers.
IS&T Project Management: Project Management 101 June, 2006.
1 Public Entities Risk Management Forum Office of the Accountant General National Treasury Project Risk Management Jeets Hargovan Government Technical.
© 2008 Prentice Hall11-1 Introduction to Project Management Chapter 11 Managing Project Execution Information Systems Project Management: A Process and.
Project Execution.
Pre-Project Planning Lessons from the Construction Industry Institute Construction Industry Institute Michael Davis, P. Eng, PMP Ontario Power Generation.
Project Management Framework. PMBOK ® Guide, Third Edition.
Advanced Project Management Project Plan Templates
Project Management Lecture 5+6 MS Saba Sahar.
Project Management Fundamentals Project Organization and Integration
What is Business Analysis Planning & Monitoring?
Degree and Graduation Seminar Project Management Processes
 A project is “a unique endeavor to produce a set of deliverables within clearly specified time, cost and quality constraints”
Project Management Process Overview
S/W Project Management
IT Project Management Cheng Li, Ph.D. August 2003.
PMP® Exam Preparation Course
9 Closing the Project Teaching Strategies
Chapter 3: The Project Management Process Groups: A Case Study
© 2015 Cengage Learning. All Rights Reserved. May not be scanned, copied or duplicated, or posted to a publicly accessible website, in whole or in part.
OSF/ISD Project Portfolio Management Framework January 17, 2011.
BSBPMG503A Manage Project Time Manage Project Time Unit Guide Diploma of Project Management Qualification Code BSB51507 Unit Code BSBPMG503A.
Project Management : Techniques and Tools (60-499) Fall 2014 / Winter 2015.
Management & Development of Complex Projects Course Code - 706
Recap from last week Understand organizations, including the four frames, organizational structures. Explain why stakeholder management and top management.
Centro de Estudos e Sistemas Avançados do Recife PMBOK - Chapter 4 Project Integration Management.
© 2012 Cengage Learning. All Rights Reserved. This edition is intended for use outside of the U.S. only, with content that may be different from the U.S.
1.  Describe an overall framework for project integration management ◦ RelatIion to the other project management knowledge areas and the project life.
Project Scope Management Project management Digital Media Department Unit Credit Value : 4 Essential Learning time : 120 hours.
Week 2 Seminar: Project Scope Management
Lecture 11 Managing Project Execution. Project Execution The phase of a project in which work towards direct achievement of the project’s objectives and.
SacProNet An Overview of Project Management Techniques.
ISM 5316 Week 3 Learning Objectives You should be able to: u Define and list issues and steps in Project Integration u List and describe the components.
BSBPMG505A Manage Project Quality Manage Project Quality Project Quality Processes Diploma of Project Management Qualification Code BSB51507 Unit.
Project Life Cycle.
Welcome to Session 3 – Project Management Process Overview
Lecture 3 Title: Information Technology Project Methodology By: Mr Hashem Alaidaros MIS 434.
1 Advanced Project Management Project Plan Templates Ghazala Amin.
BSBPMG501A Manage Project Integrative Processes Manage Project Integrative Processes Project Integration Processes – Part 1 Diploma of Project Management.
BSBPMG501A Manage Application of Project Integrative Processes Manage Project Integrative Processes Unit Guide Diploma of Project Management Qualification.
Project Management Process
What is project management?
Project Management.
The Project Plan Plan Your Work, then Work Your Plan
~ pertemuan 4 ~ Oleh: Ir. Abdul Hayat, MTI 20-Mar-2009 [Abdul Hayat, [4]Project Integration Management, Semester Genap 2008/2009] 1 PROJECT INTEGRATION.
Apply Project Scope Management Techniques Project Scope Processes – Part 2 Week 4 Certificate IV in Project Management Qualification Code BSB41507.
Project Management Processes for a Project Chapter 3 PMBOK® Fourth Edition.
BSBPMG501A Manage Project Integrative Processes Manage Project Integrative Processes Project Integration Processes – Part 2 Diploma of Project Management.
Company LOGO. Company LOGO PE, PMP, PgMP, PME, MCT, PRINCE2 Practitioner.
The Project Management Process Groups
Information Technology Project Management, Seventh Edition.
B U D I L U H U R U N I V E R S I T Y POST GRADUATE PROGRAM MAGISTER ILMU KOMPUTER (M.Kom) IS PROJECT MANAGEMENT.
Slide 1ICT 327 Management of IT ProjectsSemester 1, 2005 Topic 3 Executing & Controlling & Closing Projects.
Prof. Shrikant M. Harle.  The Project Life Cycle refers to a logical sequence of activities to accomplish the project’s goals or objectives.  Regardless.
Project Management PTM721S
Project Integration Management
Project Management Lifecycle Phases
TechStambha PMP Certification Training
Project Management Processes
State of Michigan Project Management Methodology Orientation
Project Management Process Groups
Project Integration Management
Project Integration Management
Presentation transcript:

1 State of Michigan Project Management Methodology Orientation November 2005

2 Objectives Define methodology Present business case and benefits of a project methodology Describe purpose of the State’s Project Management Methodology Preview State of Michigan Project Management Methodology Answer questions regarding Project Management at the State

3 Methodology Defined “The science of method, or orderly arrangement” – Webster “A system of practices, techniques, procedures, and rules used by those who work in a discipline” – PMBOK

4 Today’s business environment is unforgiving Customers have higher expectations, seek increased time efficiencies, and demand ‘quantum’ performance improvements IT projects are not historically tied to business success--information oriented; least PM mature IT efforts need documented path and procedures to better manage and control projects Project methodologies offer proven techniques to manage scope, cost, and task execution Business Case for PM Methodology

5 Higher project management maturity leads to better project management A positive correlation exists between higher project management maturity and cost and schedule performances An established and systematic approach to PM has been proven to improve IT project success to greater than 34% (industry average)--improved quality is recognized Benefits of Project Management

6 “To provide a comprehensive set of procedures and techniques to the State's project managers ‘to ensure high-quality and repeatable results.’ “ Purpose of SOM PM Methodology

7 State of Michigan Project Management Elements Project Management Methodology, Project Management Training, Project Scheduling Tool Expertise, and the Project Management Center of Excellence establish the key elements of the State of Michigan project management support infrastructure.

8 State of Michigan Methodology Goals Assist in the managing and monitoring of the State of Michigan’s government agencies Information Technology (IT) projects. Provide for, and institutionalize, formal project management practices into all areas of State government.

9 Project Management Methodology The State of Michigan Methodology is the foundation for building and identifying the types of procedures needed. The PM methodology document describes project phases and processes to be accomplished. The methodology is driven by the use of templates that guide the user through processes necessary to complete activities. The methodology grows with maturity.

10 Methodology Levels Phases Processes Templates

11 Phases of the PMM The Project Management Methodology and its phases: Phases provide the framework for the methodology (PMBOK aligned). InitiationPlanning Control Execution Closeout

12 PMM and PMBOK InitiationPlanning Control Execution Closeout Project Management Phases Integration Management Scope Management Procurement Management Time Management Risk Management Cost Management Communications Management Human Resource Management Quality Management Knowledge Areas

13 PMM phases and SDLC components

14 Project Management versus System Development Life Cycle Project Management defines the general function of managing the project from initiation to closeout. System Development Life Cycle defines the function of managing the product from inception to implementation and maintenance.

15 Project Phase overlap Initiation Planning Execution Control Closing TIME Level Of Activity Project Start Project Finish Overlap of Phases in the Project Life Cycle

16 PMM Processes Processes provide the “how to” of working ‘inside’ of the framework. The Project Management Methodology document describes the processes in detail.

17 PMM Templates Templates are the deliverables of the processes and thereby establish standardization for project activities. Templates integrate the methodology into the everyday project environment being conducted at the State of Michigan. Execution Planning Closeout Initiation Control

18 PMM Templates Customizable documents that allow for the insertion of dictated information in an organized manner.

19 History of PMM 1999 Need for PMM approved 1999 – Specifications Development Early 2000 – RFP / Procurement Process May 2000 – PMM Release 1 May 2001 – PMM Release 2 May 2003 – PMM Express Release 1 December 2004 – PMM Release 3 October 2005 – PMM Express Release 2

20 State of Michigan Project Management Methodology A system of standard methods and guidance to ensure that projects are conducted in a disciplined, well- managed, and consistent manner Soft Copies available at and click on the PM Methodology page

21 PMM Templates Project Concept Document Business Case Project Charter Project Plan WBS Resource Plan Risk Management Plan Quality Plan Communications Plan Change Management Plan Budget Estimate Planning Transition Checklist Project Status Report Project Change Request Project Issue Document Post Implementation Eval Report Active Project Transition Lessons Learned PMM Feedback Consists of 19 Templates

22 PMM Express An adaptation of the State’s Project Management Methodology (PMM) to smaller, non-complex projects Soft Copies available at and click on the PM Methodology page

23 PMM Express Templates Consists of Seven Templates –Project Charter –Project Plan –Project Status Report –Project Change Request –Project Issue Document –Post Implementation Evaluation Report (PIER) –Lessons Learned Lessons Learned

24

25 Initiation Phase The Project Initiation Phase is the conceptual element of project management. The purpose of the Initiation Phase is to specify what the project should accomplish and to gain management approval. Execution Planning Closeout Initiation Control

26 Initiation Progression Initiation Phase Documents Project Concept Document Project Charter Planning Phase Initiation Business Case

27 Project Charter Highlights Project Objectives Project Scope Critical Success Factors High-Level Project Planning Estimates Roles & Responsibilities Project Authority Management Checkpoints

28 Project Charter Approval Gives the go-ahead (approval) to expend resources on this project Obtaining signatures assigns responsibility!

29 Planning Phase Execution Planning Closeout Initiation The purpose of the Project Planning Phase is to establish requirements, define tasks, build schedules, assess risks, institute quality standards, describe deliverables, develop costs, and to document the work organization. The process entails the identification of the ‘proper’ needs and structure for organizing and managing the project. Control *Note: Some Control activities occur in the Planning Phase.

30 Planning Progression Planning Control

31 Developing a Project Notebook Contents: Project Charter Work Breakdown Structure Project Schedule Resource Management Plan Risk Management Plan Quality Management Plan Communication Plan Change Management Plan Project Status Reports Project Successes and Lessons Learned Any other documents that the project manager feels are important enough to include

32 Scope Input Boundaries Provide Modify Purchase Acquire Identify TrainOversee Promote Recruit Assumptions and Constraints SCOPE...defines a project’s place in a larger scenario Planning Control

33 Communication COMMUNICATION PLAN …foundation strategy for getting the right information to the right people Define information needs Identify people who need information Communicate information needs Planning Control

34 Develop Communication Strategy Defines the information needs of the project stakeholders and the project team by documenting what, when, and how the information will be distributed.

35 Risk Management Response Development Risk Event Control RISK MANAGEMENT …systematic means of managing uncertainty Risk Identification Planning Control

36 Documenting Risks Identify Potential Risks that may affect (both positively and negatively) Budget, Scope or Schedule Estimate their Probability of Occurring and their Impact on the project if they occur Develop Mitigation Strategies for high risks

37 Quality Management Quality Planning Quality Assurance Quality Control IdentifyEvaluateMonitor QUALITY MANAGEMENT …means to ensure project will satisfy needs Planning Control

38 Develop Quality Strategy How is quality being addressed on the project? Deliverable Acceptance Criteria –Describe Acceptance Criteria for deliverables as they are turned over to the customer Applicable QA Activities –Define applicable Quality Assurance activities for the project including test and acceptance processes and documentation

39 WBS Process Flow WBS Development Process WORK BREAKDOWN STRUCTURE …identifies all the tasks in a project Develop High-Level WBS Assign High- Level Responsibility Decompose WBS Assign Responsibility to Elements Create WBS Dictionary Review & Approve WBS Baseline WBS Planning Control

40 Project Plan Signoff Signature meaning: Commitment, not a guarantee.

41 Execution and Control Phases Execution Planning Closeout Initiation Control These interactive phases deal with the actual development of the project ‘product’. Project Execution focuses on participating in, observing, and analyzing work being done. Project Control manages processes in order to compare actual to planned performance and takes corrective action when differences exist.

42 Status STATUS …means by which the team and management is informed of project progress ScopeCost Schedule Quality Risk Time Project Elements Status of Phase I Status of Phase II Current Status ExecutionControl

43 Project Status Reports

44 Issue Management

45 Change Control CHANGE CONTROL …identification and management of project changes Change Identified Team Evaluation Committee Review Plans Updated Change Approved Change Implemented ExecutionControl

46 Change Control Request Template General Information (all templates have this section!) Requestor Information Initial Review Results –to move forward with an Impact Analysis Initial Impact Analysis Impact Analysis Results Signatures (Signoff!)

47 Perform Other Project Control Functions Scope Control Quality Control Schedule Control Cost Control Risk Control Contract Administration, if applicable

48 Closeout Phase The Project Closeout Phase involves the administrative and financial efforts needed to close out a project. The product is also transferred to the customer. Execution Planning Closeout Initiation Control *Note: Some Control activities occur in the Closeout Phase.

49 Post Implementation Evaluation Report A Post Implementation Evaluation Report documents successes and failures of the project. It provides a historical record of the planned and actual budget schedule. The report contains recommendations for other projects of similar size and scope. The report documents valuable lessons learned. Closeout Control

50 Obtain Project Sign-Off Meet with stakeholders to get their final approval of the project –They are the reason for the project existing in the first place –Their approval signals the project’s completion!

51 In Summary What is methodology Justification and benefits of a project methodology Purpose of the State Project Management Methodology How does the State Project Management Methodology work?

52 Methodology The techniques, procedures, and means through which work gets accomplished (i.e., phases, processes, templates)

53 Why a Project Management Methodology? Today’s work: tighter budgets, less time, fewer resources. Higher customer and user expectations for quality demand on organized approach. Need a documented path and procedures to control and manage project risk and change.

54 “…provides standard methods and guidelines to ensure that projects are conducted in a disciplined, well-managed, and consistent manner that promotes the delivery of quality products and results in projects that are completed on time and within budget.” What does the State’s Methodology do?

55 How does the Methodology work? Establishes a clearer work definition. Develops a more accurate project schedule and cost determination. Defines expected work packages. Displays when work is in trouble. Creates a plan to ensure work is completed on time. Determines status of work budgets.

56 Additional Efforts Under Way State Unified Information Technology Environment (SUITE) Bringing MDIT to CMM Level 3 Standardizing PM, SDLC, CM, QA into one Framework/Model Multi-year initiative

57 Project Management Resource Center Michigan Department of Information Technology Web site:

58 Questions?? Dan Buonodono