Messages from our friends a few slides about xTCA projects of colleagues that did not manage to come to Perugia M. Joos, CERN17th meeting of the xTCA IG.

Slides:



Advertisements
Similar presentations
Goals and status of the ATLAS VME Replacement Working Group Markus Joos, CERN Based on slides prepared by Guy Perrot, LAPP 19/09/2012.
Advertisements

ROD R&D Status K. Johns, C. Armijo, J. Steinberg (U. Arizona) H. Chen, F. Lanni, J. Mead (BNL) L. Hervas (CERN) A. Meyer, A. Kielburg-Jeka, A. Straessner.
Digital RF Stabilization System Based on MicroTCA Technology - Libera LLRF Robert Černe May 2010, RT10, Lisboa
26-Sep-11 1 New xTCA Developments at SLAC CERN xTCA for Physics Interest Group Sept 26, 2011 Ray Larsen SLAC National Accelerator Laboratory New xTCA Developments.
SLAC uTCA review 4-5 June 2012 Anders J Johansson Lund University Some slides from Zheqiao Geng and Tom Himel)
The LAr ROD Project and Online Activities Arno Straessner and Alain, Daniel, Annie, Manuel, Imma, Eric, Jean-Pierre,... Journée de réflexion du DPNC Centre.
An ATCA and FPGA-Based Data Processing Unit for PANDA Experiment H.XU, Z.-A. LIU,Q.WANG, D.JIN, Inst. High Energy Physics, Beijing, W. Kühn, J. Lang, S.
Shelf Management & IPMI SRS related activities
Development of an ATCA IPMI Controller Mezzanine Board to be used in the ATCA developments for the ATLAS Liquid Argon upgrade Nicolas Dumont Dayot, LAPP.
LCLS-II Linac LLRF Control System – L1, BC1 Zheqiao Geng Final Design Review May 7, 2012.
Leo Greiner IPHC testing Sensor and infrastructure testing at LBL. Capabilities and Plan.
Prototype of the Global Trigger Processor GlueX Collaboration 22 May 2012 Scott Kaneta Fast Electronics Group.
Update on APV25-SRS Electronics Kondo Gnanvo. Outline Various SRS Electronics Status of the APV25-SRS UVa Test of the SRU with multiple.
Particle Physics & Astrophysics Representing: Mark Freytag Gunther Haller Ryan Herbst Michael Huffer Chris O’Grady Amedeo Perazzo Leonid Sapozhnikov Eric.
XTCA activities at CERN Markus Joos PH-ESE xTCA interest group – Background – Report of the 2 nd meeting (held on 7.3.) uTCA evaluation and AMC development.
Department of Particle Physics & Astrophysics Representing: Rainer Bartoldus Ric Claus Gunther Haller Ryan Herbst Martin Kocian Chris O’Grady Jim Panetta.
Pulsar II Hardware Overview Jamieson Olsen, Fermilab 14 April 2014
XFEL The European X-Ray Laser Project X-Ray Free-Electron Laser Dariusz Makowski, Technical University of Łódź LLRF review, DESY, 3-4 December 2007 Advanced.
ATCA based LLRF system design review DESY Control servers for ATCA based LLRF system Piotr Pucyk - DESY, Warsaw University of Technology Jaroslaw.
Department of Particle Physics & Astrophysics Introduction to the RPT & its concepts. Roadmap to today’s lectures and lessons. CERN follow-on to the Oxford.
SLAC Particle Physics & Astrophysics Future Development and Direction RCE Training Workshop Michael Huffer, 15 June, 2009.
1 Application of New PICMG µTCA for Physics Specifications to Accelerator Control Ray Larsen, SLAC & Kay Rehlich, DESY TWEPP 2010 Workshop Aachen, Germany.
LAr ROD R&D for sLHC Charlie Armijo, Joel Steinberg, Ken Johns (University of Arizona) Joe Mead, Hucheng Chen, Francesco Lanni (BNL) Luis Hervas (CERN)
September 19-20, 2007 A.Zaltsman EBIS RF Systems RF System Overview Alex Zaltsman September 19-20, 2007 DOE Annual Review.
Presentation for the Exception PCB February 25th 2009 John Coughlan Ready in 2013 European X-Ray Free Electron Laser XFEL DESY Laboratory, Hamburg Next.
CMX status and plans Yuri Ermoline for the MSU group Level-1 Calorimeter Trigger Joint Meeting CERN, October 2012,
CSC ME1/1 Upgrade Status of Electronics Design Mikhail Matveev Rice University March 28, 2012.
Slide ‹Nr.› l © 2015 CommAgility & N.A.T. GmbH l All trademarks and logos are property of their respective holders CommAgility and N.A.T. CERN/HPC workshop.
XFEL The European X-Ray Laser Project X-Ray Free-Electron Laser Communication in ATCA-LLRF System LLRF Review, DESY, December 3rd, 2007 Communication in.
M. Joos, PH/ESE1 ATCA for ATLAS - status Activities of the working group PH/ESE xTCA evaluation project Next steps.
XTCA projects (HW and SW) related to ATLAS LAr xTCA interest group - CERN 07/03/2011 Nicolas Letendre – Laurent Fournier - LAPP.
ATLAS Trigger / current L1Calo Uli Schäfer 1 Jet/Energy module calo µ CTP L1.
Latest ideas in DAQ development for LHC B. Gorini - CERN 1.
MTCA use in Linac to replace CAMAC Tom Himel June 4,
1 The Cost & Schedule to Accomplish the Transition Proposed SLAC Controls Upgrade December 1, 2010 Ray Larsen.
SRS Trigger Processor Option Status and Plans Sorin Martoiu (IFIN-HH)
XLV INTERNATIONAL WINTER MEETING ON NUCLEAR PHYSICS Tiago Pérez II Physikalisches Institut For the PANDA collaboration FPGA Compute node for the PANDA.
Department of Particle Physics & Astrophysics CSC ROD Replacement Conceptual Design Review New ROD Complex (NRC) Overview & Physical Design Michael Huffer,
AFP Trigger DAQ and DCS Krzysztof Korcyl Institute of Nuclear Physics - Cracow on behalf of TDAQ and DCS subsystems.
Welcome to the 4th meeting of the xTCA Interest Group M. Joos, PH/ESE1 Agenda: Next Meeting: During the TWEPP 2012 conference in Oxford SpeakerTitle M.
Evaluation of Emerging Parallel Optical Link Technology for High Energy Physics John Chramowicz, Simon Kwan, Alan Prosser, Melissa Winchell Fermi National.
IPMI developments at LAPP dec 15, 2011IPMI developments at LAPP, L.Fournier1 Alain BAZAN, Fatih BELLACHIA,Sébastien CAP, Nicolas DUMONT DAYOT, Laurent.
Rutherford Appleton Laboratory September 1999Fifth Workshop on Electronics for LHC Presented by S. Quinton.
XTCA Workshop Topic Suggestions Ray Larsen, SLAC TWEPP 2010 Workshop Aachen, Germany September 22, 2010.
New ATCA compute node Design for PXD Zhen-An Liu TrigLab, IHEP Beijing Feb , 6th International Workshop on DEPFET Detectors and Applications.
Consideration of the LAr LDPS for the MM Trigger Processor Kenneth Johns University of Arizona Block diagrams and some slides are edited from those of.
IPMI: New MMC firmware IN2P3: DAQ working group (19/06/15) 19/06/2015IN2P3: DAQ working group (06/19)1 PH-ESE-BE collaboration Vincent Bobillier, Stefan.
August 24, 2011IDAP Kick-off meeting - TileCal ATLAS TileCal Upgrade LHC and ATLAS current status LHC designed for cm -2 s 7+7 TeV Limited to.
E. Hazen - DTC1 DAQ / Trigger Card for HCAL SLHC Readout E. Hazen - Boston University.
L1Topo Hardware Status & Plans Uli Schäfer 1 B.Bauß, V.Büscher, U.Schäfer, E.Simioni, S.Tapprogge, A. Vogel.
ATCA based LLRF system design review DESY Control servers for ATCA based LLRF system Piotr Pucyk - DESY, Warsaw University of Technology Jaroslaw.
29/05/09A. Salamon – TDAQ WG - CERN1 LKr calorimeter L0 trigger V. Bonaiuto, L. Cesaroni, A. Fucci, A. Salamon, G. Salina, F. Sargeni.
E. Hazen -- Upgrade Meetings1 AMC13 Project Development Status E. Hazen, S.X. Wu - Boston University.
E. Hazen1 MicroTCA for HCAL and CMS Review / Status E. Hazen - Boston University for the CMS Collaboration.
E. Hazen -- ACES ACES 2011 MicroTCA in CMS E. Hazen, Boston University for the CMS collaboration.
E. Hazen -- Upgrade Week1 HCAL uTCA Readout Plan E. Hazen - Boston University for the CMS HCAL Collaboration.
E. Hazen1 AMC13 Status E. Hazen - Boston University for the CMS Collaboration.
E. Hazen1 AMC13 Project Status E. Hazen - Boston University for the CMS Collaboration.
MicroTCA Development and Status
AMC13 Project Status E. Hazen - Boston University
DAQ and TTC Integration For MicroTCA in CMS
The SLAC Instrumentation and Control Platform
Design of an AdvancedTCA board Management Controller Solution
New xTCA Developments at SLAC
LATOME LAPP Nicolas Dumont Dayot on behalf of the LAPP team
uTCA A Common Hardware Platform for CMS Trigger Upgrades
MicroTCA Common Platform For CMS Working Group
MicroTCA Common Platform For CMS Working Group
xTCA in CMS Magnus Hansen Thanks to many CMS collaborators
Jason Gilmore Vadim Khotilovich Alexei Safonov Indara Suarez
Presentation transcript:

Messages from our friends a few slides about xTCA projects of colleagues that did not manage to come to Perugia M. Joos, CERN17th meeting of the xTCA IG

Department of Particle Physics & Astrophysics RCE status update (DOE Detector R&D program on H/P DAQ Systems) Michael Huffer, SLAC National Accelerator Laboratory Used for the ATLAS CSC read-out after LS1 The (US) baseline for the ATLAS NSW RODs, the DAQ system for the LSST camera as well LBNE and HPS LSST - Large Synaptic Survey Telescope. Optical telescope with the largest digital camera ever built (> 6 Gigapixels) LBNE - Underground, long baseline Neutrino experiment using Fermilab beams located in Homestake mine in South Dakota (USA) HPS - Heavy Photon Search. Discovery experiment at Jefferson Laboratory looking for anomalous (non-standard model) photons.

Department of Particle Physics & Astrophysics 3 Architecture Overview CE RCE COB Heart of Use on Based on SOC technology: Xilinx Zynq Three principal components: Programmable FPGA Fabric Both soft & hard silicon (resources) Equivalent in size to (large) Kintex 7- series 900 DSP tiles (> 200 TeraMACS/Sec) 12 SerDes support up to 12.5 Gbits/s Programmable Cluster-Element (CE) Includes MicroSD (up to 64 Gbytes) 1 Gbyte of RAM (DDR3) 10-GE Ethernet interface (as a plugin) Plug & socket model “glues” plugins to CE User plugins ARM (dual-core) 900 MHz Bootstrap configuration External I2C interface Communicates with IPMC Socket Interface for plugins Transfer data in units of frames Software (bundled with CE): Linux: Based on 3 series kernel RTEMs: RT kernel TCP/IP stack Plugin socket library Designed to satisfy ATLAS Phase-1 needs and facilitate Phase-2 R & D ROD replacement for CSC (Phase-0) (US) baseline for NSW MM-RODs (Phase-1) Option for AFP Silicon & timing readout (Phase-0/1) ATCA compliant Front (carrier) board Full Mesh board (10-GE) on fabric interface Node board on base interface Fully IPM compliant A cluster of up to 17 RCE’s 4 Data Processing Modules (DPM) Contains 1 to 4 RCEs 1 Data Transport Module (DTM) Contains 1 RCE Manages switch & application specific timing

Department of Particle Physics & Astrophysics 4 COB + RTM + TTC mezzanine SFP x 16 (to ROBINs) TTC distribution board TTC In (fiber-optic) TTC out (LEMO) TTC distribution board Status: –Prototype functional & signal integrity verified –Production schematic complete & in layout Firmware status: –BPM encoder/decoder functional & operating DTM (G3) Zynq (030) Zynq (045) (dual element) DPM (G3)

Department of Particle Physics & Astrophysics 5 COB Status (NRC ATCA-Front-Board) Production prototype From prototype to Production board –Timing distribution (TTC) moved from COB to RTM –SFP+ (external Ethernet) moved from RTM to COB –Denser connector in P3 (enables move from 48 to 96 lanes) SFP+ (Ethernet) DPM bay DTM 10-GE switch IPMI controller Prototypes (RTMs and COBs) done Production was scheduled for April 2014, but it will probably be closer to beginning of summer Proof-Of-Principal of OpenHPI (and thus the shelf manager) interfacing to the ATLAS controls has been demonstrated still a lot of on-going work necessary in this area Begun testing of TTC interface SCA controller design prototyped and waiting for COB hardware to integrate with. The most important concern: base program completion (the COB and RCE). Focus has shifted from hardware to firmware and software SCA - Switched Capacitor Analog (Memory). The sensors for the CSC detector electronics.

LAr ATCA developments Annecy, Arizona, Brookhaven, Dresden, Stonybrook 23/09/2013TWEPP13 xTCA LAr6 IPMC ATCA Board ATCA Carrier AMC Contact: ATLAS Liquid Argon Calorimeter Phase I Upgrade (2018): Readout of LAr Fine Granularity trigger towers for L1Calo Trigger

IPMC Mezzanine V2- V2.1 & Test Board 23/09/2013TWEPP13 xTCA LAr7 IPMC Ten boards produced in V2.0 Only a few still available Basic firmware with no AMC and User support. No evolution foreseen Twenty boards being produced in V2.1 Ten available end November, the others in December Complete firmware available middle December. User tools only next year V2.0 V2.1 IPMC Test Board Four Boards received in March Three Boards OK, one to be repaired Five more boards being produced. Availability End November Manual and design files available Will also be used by LHCb

Trigger Towers Readout Developments 23/09/2013TWEPP13 xTCA LAr8 “ROD” Evaluator Takes data from front end trigger digitizer and outputs to the future L1Calo system. To evaluate link performances, DSP computing performances High speed and density optical links (48 Rx, 48 Tx, 8.5 Gbps) 3 High density FPGA for computing (Altera Stratix IV) Two boards used by LAPP and two more in production ready by end of year. More boards built by Tokyo One card will be installed in each CERN EMF (Q4 2013) Two cards in USA15 (2014/5) for first readout of Lar Trigger Digitizer Board (LTDB) AMC Based Optical test Board To evaluate front optical links placement and techniques Based on Xilinx Virtex-7 and Avago micro-pods arrays 8 micro-pods (4 as receivers and 4 as transmitters) Specific non commercial radiator for cooling 4 micro-pods Optical pigtail between 4 micro-pods and one front panel 48 fibers MPO/MTP connector. 8 PCBs but only 2 boards built end November Next: Design of final prototypes of AMC and Carrier blade

Sept MicroTCA Summary for TWEPP Ray Larsen TWEPP 2013

Sept PICMG Standards Extensions Standards Activities –MTCA.4 & Guideline for Clocks, Gates & Triggers for ATCA, MicroTCA approved, published –Software WG on hold past year lack of time from key contributors and lack of urgency from users Now advanced in real applications, SW and FW architectures, guidelines, roadmaps will be revived TWEPP 2013 SLAC Infrastructure –Continuing evaluation program –Crates, cooling, blockers (Schroff, Elma, Vadatech, PT) –MCH (NAT, Vadatech) –Processors (Several) –Timing (MRF EVR on Vadatech adapter in use, 2-Wide Timer from DESY-Stockholm under test) –Power Supplies (Telkoor, Wiener, Vadatech) –Application modules (Struck, Vadatech, TEWS, NAT etc.) MRF: Mirco-Research, Finland EVR: Event receiver

Sept MTCA.4 Adopted for LCLS-II Injector & 4 Stations of Main Linac Injector LLRF System –Racks completely assembled with 4Ch LLRF control in single 12 slot MTCA.4 crate 1 Ch Prototype system fully tested on-beam in 2012 Production 4Ch System plus Legacy support system completed in water- stabilized rack system Injector BPM System –BPM Crates (2) completed for 15 BPMs 3 Ch Prototype system fully tested on beam early Ch 2-Crate System completed in dual water- cooled rack system Resolution 3X improved over Legacy 1U Chassis TWEPP 2012 LLRF Crate in Dual Rack 4Ch LLRF Crate BPM Crate 8Ch Digitizers BPM Crate 8Ch RTMs

Sept Future Planning MTCA.4 candidate to replace all CAMAC –Upgrade of all SLAC controls proposed to DoE –Scope includes all RF stations, BPMs, Beam Charge Monitors, Beam Size Monitors, Wire Scanners, Movers, Machine Protection Interlocks etc. –Upgrade in 3 10-sector stages over ten-years (~340 MTCA systems) Standards –SLAC will continue supporting lab-industry xTCA collaboration, standards and guidelines Lab & Industry Collaborations –Will continue collaborations underway with DESY, Lund, Pohang, others in discussion in areas of LLRF, BPMs, Timing systems and with supporting companies for infrastructure, applications modules TWEPP 2013

For your agenda M. Joos, CERN137th meeting of the xTCA IG Deadlines: Abstract submission: 20 October Registration: 22 November