NGS Status Report to GGOS Bureau for Networks and Communications Dru Smith Kendall Fancher Giovanni Sella GGOS Bureau for Networks and Communications 10/15/20101.

Slides:



Advertisements
Similar presentations
(GET FAMILIAR WITH EQUIPMENT)
Advertisements

Foundations of Excellence ® in the First College Year (4-year institutions) Salisbury University Project Description of Review Process of First College.
Campus Improvement Plans
NGS Status Report to GGOS Bureau for Networks and Communications: 2014 Dru Smith Kendall Fancher Charles Geoghagan Steve Breidenbach GGOS Bureau for Networks.
Eastern Indiana Economic Growth Region 6 Strategic Plan August 2010 Approved Version
NRC Cyber Security Regulatory Program Development Background ANSI Nuclear Energy Standards Coordination Collaborative (NESCC) Meeting November 3, 2014November.
MODULE 2. CUSTOMER SERVICE By Dale Pfeiffer. Session Learning Objectives Customer Service Understand the Basics of Customer Service Understand the 7-Steps.
Telecom Lifecycle Management Solutions for Sales Partners.
Chapter 5 IT Processes Presented by Dr. Mohamed Sammouda.
Managing the Information Technology Resource Jerry N. Luftman
Software Project Transition Planning
PPA 502 – Program Evaluation Lecture 3b – Outcome Monitoring.
Surveying for Engineering Planning Zoltán Siki
SCC & Leica  Import total station survey, GPS, traverse, levelling and GIS data direct from all Leica instruments.  In built Grid Inquest for GPS reduction.
Education for Height Modernization Dr. Stacey D. Lyle, RPLS.
Surveying & Mapping. GPS on Bench Marks Campaign.
Commander, Naval Installation Command (CNIC) N9, Child Youth Programs (CYP) plans to design, install, and maintain Closed Circuit Television (CCTV) systems.
Recent IERS Site Survey of Multiple Co-located Geodetic Techniques by NGS Kendall Fancher, Dru Smith, Steve Breidenbach, Jeff Olsen, Nagendra Paudel NOAA’s.
General Overview as Outlined in 2013 GAP Guidance Desirae Roehl – ANTHC Healthy Village Env. Program
NGS HSRP Update Ronnie Taylor, Acting Director National Geodetic Survey, NOAA October 13, 2010.
Mission Planning and SP1. Outline of Session n Standards n Errors n Planning n Network Design n Adjustment.
Reviewed by Kim Davis EDLD 5362 Final Project May 15, 2011.
GSA OGP Advisory Committee Engagement Survey ACES 2004 Overall Results September 23, 2004.
1 SVY207: Lecture 18 Network Solutions Given many GPS solutions for vectors between pairs of observed stations Compute a unique network solution (for many.
Wave 1 Project Current Status (identify recent engagements, deliverables, etc.) What’s Next Strategic Purchasing – Scientific Supplies MRO Supplies Computer.
Do it pro bono. Strategic Scorecard Service Grant The Strategy Management Practice is presented by Wells Fargo. The design of the Strategic Scorecard Service.
A New & Improved National Spatial Reference System Refinements of the North American Datum of 1983 through the Multi-Year CORS Solution and the National.
NSDI Future Directions Initiative Towards a National Geospatial Strategy and Implementation Plan Ivan B. DeLoatch FGDC Staff Director.
Transition of the ORGN from NAD 83(CORS96) epoch to NAD 83(2011) epoch Ken Bays, PLS Lead Geodetic Surveyor Oregon DOT March 2013 ODOT.
WSNTG Annual Conference 8 th September 2005 WSNTG 9 th Annual Conference “Water Services Strategic Plans – Fact or Fiction”
Development of a Framework on Statistics and Indicators on ICT and Electronic Commerce in the Philippine Statistical System by Francisco K. Mallion.
MODERN SURVEY (FAMILARISATION WITH EQUIPMENTS). Modern equipments EDM – Electronic distance measurement eqp. EDM – Electronic distance measurement eqp.
Technology Planning. Primary Elements Stakeholders Leadership team Needs assessment Technology components Work plan Budget Policies Evaluation.
AUSTRALIAN LOCAL TIE SURVEYS. 27 May 2004 PLAN OF PRESENTATION Stromlo Network Design Monument Design Calibration Targets Instrumentation and Methodology.
GPH 692 South Lake Tahoe Field Exercise 2012 GPS Work.
InCORS INDIANA’S STATEWIDE GNSS-GPS REAL TIME NETWORK Presented by Derek Fuller, PLS Land & Aerial Survey Office.
Shared Leadership for a Stronger Montana Economy State Higher Education Executive Officers Workforce & Economic Development Committee July 20, 2005.
1 AOGS 2012, Singapore, Aug 13-17, 2012 Surveying co-located GNSS/VLBI/SLR Stations In China Xiuqiang Gong, Yunzhong Shen, Junping Chen, Bin Wu Shanghai.
Implementing QI Projects Title I HIV Quality Management Program Case Management Providers Meeting May 26, 2005 Presented by Lynda A. O’Hanlon Title I HIV.
SPACE GEODESY NETWORK & ITRF Z Minchul LEE 1.
1 Thank you for visiting our site and welcome to the “Introduction to ISO 22000” Presentation that you requested. For more information.
GNSS Absolute Antenna Calibration at the National Geodetic Survey Gerald L Mader 2, Andria L Bilich 1 1 National Geodetic Survey, NOAA/NOS, Boulder CO;
Project Life Cycle.
 PREPARED BY: 1.Sindha.Rinku.R 2.Trivedi.Hasti 3.Kamdar.Karan  GUIDANCE BY : ASHISH RATHOD (ASST.PROF.) Modern tools of Surveying & Mapping.
Los Angeles County Metropolitan Transportation Authority Overcoming Multi-Jurisdictional Challenges Lessons Learned Implementing Bus Signal Priority.
The Mission: In order to produce luminosities appropriate for Run II levels, a better understanding of the Tevatron’s orbit would be required. To do that,
XXV FIG Congress Kuala Lumpur 2014 "Engaging the Challenges, Enhancing the Relevance" June 2014, Malaysia Study on the Quality of.
PMI-Planning Process Group Lecture 08 Ms Saba Sahar.
1 Geospatial Line of Business Update FGDC Coordination Group April 14, 2009.
Technical Specifications for Monitoring Ground Displacements at a National Highway Project K. Lakakis, P. Savvaidis and I. Ifadis Laboratory of Geodesy.
U.S. Department of the Interior U.S. Geological Survey Continuous Records Processing.
Developing a Framework In Support of a Community of Practice in ABI Jason Newberry, Research Director Tanya Darisi, Senior Researcher
Alternate River/Valley Crossing Procedure for Theodolites Kendall Fancher Chief, NGS Instrumentation & Methodologies Branch
Guidelines for Positioning the Oregon Real-time GPS Network Ken Bays, PLS Lead Geodetic Surveyor Oregon DOT 31 July 2013 NGS Real-time GPS Network Webinar.
Towards optimizing the determination of accurate heights with GNSS APRIL 14, 2015 Dan Gillins, Ph.D., P.L.S. and Michael Eddy, Ph.D. student.
Master Plan Process FY Proposed Draft. October - February Cluster Groups and Units Identify Initiatives These are general goals or outcomes that.
Federal Geodetic Control Subcommittee of the Federal Geographic Data Committee FGCS Meeting Denver, Colorado June 13, 2007 Dave Zilkoski, Chair.
Capabilities Analysis Briefing for Chancellor and Senior Leaders.
COLLEGE OF APPLIED MEDICAL SCIENCES “CAMS” NOVEMBER 2015 Vice -Deanship for Development and Quality November 2015.
HAII-ICGC :GNSS Project 2015/03/05. 2 To establish 1 IGS-nominated GNSS reference station with time control at NIMT with data center to synchronize data.
Illuminating Britelite’s Internal Services for Success Strategy for Process Improvement.
REBUILD AMERICA. Why look at the bills? l Bills are the bottom line –they prove the savings!
Illuminating Britelite’s Internal Services for Success Strategy for Process Improvement.
-CORBIN- Instrumentation & Methodologies Branch of the Geodetic Services Division.
B. S. Schmeing 23-September-2009 Automated measurement of local ties and antenna parameters Benno Schmeing University of Bonn, IGG Benno Schmeing University.
InCORS INDIANA’S STATEWIDE GNSS-GPS REAL TIME NETWORK Presented by Eric N Banschbach, PLS Land & Aerial Survey Office 97 th Annual Purdue Road School March.
Oregon Statewide System of Support for School & District Improvement Tryna Luton & Denny Nkemontoh Odyssey – August 2010.
Superior Infrastructure – Phase One Lenora Chapman & Michelle Stevenson Presenting.
Guidelines for Real Time GNSS Networks (RTN) Administration.
Nigeria.
Presentation transcript:

NGS Status Report to GGOS Bureau for Networks and Communications Dru Smith Kendall Fancher Giovanni Sella GGOS Bureau for Networks and Communications 10/15/20101

2010 Activities 10/15/2010 GGOS Bureau for Networks and Communications GGAO Survey Research Brewster Recon Foundation CORS NGS Policy 2

GGAO Survey 10/15/2010 GGOS Bureau for Networks and Communications 3

GGAO 10/15/2010 GGOS Bureau for Networks and Communications 4

GGAO Control Network 10/15/2010 GGOS Bureau for Networks and Communications 5

GGAO Survey Equipment GPS – Trimble R7 GNSS receivers – Javad Ringant-DM GNSS antenna Leveling – Leica DNA03 digital level – 2-meter Invar staff Angles and Distances – Leica TDMA 5005 total station – Leica GPH1P precision reflectors 10/15/2010 GGOS Bureau for Networks and Communications 6

Status of GGAO Project GPS data analysis completed Tie vector data analysis completed Some problems were encountered  Data collection software used for the survey truncated digits. Level of achieved precision associated with field measurements was not retained in the final computed coordinates.  Data reduction/adjustment software used for the survey did not allow for creation of variance co-variance matrix. Unable to generate SINEX file. Report will be issued Will provide an independent comparison to previous tie vector information. Will provide tie vector information for the NG-SLR The survey provided NGS with an excellent learning opportunity for reacquiring skills necessary to conduct these type surveys. 10/15/2010 GGOS Bureau for Networks and Communications 7

NGS Research A robotic precision prism has been developed to allow for remotely controlled pointing of the reflector back to the instrument. Field procedures are being refined at the NGS Instrumentation & Methodologies Branch facility. Data collection software is being developed. Data reduction & adjustment software are being evaluated. 10/15/2010 GGOS Bureau for Networks and Communications 8

Brewster Recon 10/15/2010 GGOS Bureau for Networks and Communications 9

Brewster Recon VLBA, GPS 10/15/2010 GGOS Bureau for Networks and Communications 10

Brewster Recon CORS ARP will be determined indirectly by intersection. The ARP is inaccessible due to existing GPS antenna radome. VLBA invariant point will be determined indirectly utilizing robotic prisms and a circle fitting routine. 10/15/2010 GGOS Bureau for Networks and Communications 11

Foundation CORS The NGS Executive Steering Committee approved the initiation of the Foundation CORS project – NGS owned and operated sites – Highest quality equipment mounted on deep drill braced quadrapods (as needed) Five year implementation plan being finalized Government cost 10/15/2010 GGOS Bureau for Networks and Communications 12

Foundation CORS Five year implementation plan being finalized – CONUS points likely to be first Ongoing internal NGS discussions focused on: – Priority order of site installation – Installation responsibility and costs: Contract vs NGS-performed 10/15/2010 GGOS Bureau for Networks and Communications 13

NGS Policy Commitment In November 2010, the NGS Executive Steering Committee approved our official engagement in IERS co-location site surveys – Program Lead: Kendall Fancher Details on level of commitment to be worked out in 5 year project plan 10/15/2010 GGOS Bureau for Networks and Communications 14

NGS Policy Commitment Over next 5 years, here are the proposed resource commitments: – Travel to appropriate meetings – Surveys at all Foundation CORS sites as installed – One additional non-Foundation CORS survey Could be international Based on IERS priority list and available NGS resources 10/15/2010 GGOS Bureau for Networks and Communications 15