1 STATUS REPORT JINR G. Shirkov, ILCW08, November 17, 2008.

Slides:



Advertisements
Similar presentations
Development of an In-Situ Test for Direct Evaluation of the Liquefaction Resistance of Soils K. H. Stokoe, II, E. M. Rathje and B.R. Cox University of.
Advertisements

Investigation of Consolidation Promoting Effect by Field and Model Test for Vacuum Consolidation Method Nagasaki University H.Mihara Y.Tanabasi Y.Jiang.
S.Karyaeva 1, Y.Budagov, A.Dudarev, A.Krasheninnikov 1, E.Petrovskaya 1, G.Shirkov 1 – Moscow Institute of Architecture.
CFS challenges for a linear collider J.Osborne CERN ILC-GDE Dubna - 4 June 2008 OUTLINE : Introduction Civil Engineering -Geology (water, stability issues.
CFS near term & Required ADI input CFS near term & Required ADI input 6-12 month activities, required ADI information 10. AUG 2014CFS-ADI Joint Meeting1.
Chapter 2 Section 4: Topographic Maps
Global Design Effort - CFS Baseline Assessment Workshop 2 - SLAC Reduced Bunch Number 1 BASELINE ASSESSMENT WORKSHOP 2 CONVENTIONAL FACILITIES.
Global Design Effort - CFS TILC09 and GDE AAP Review Meeting - Tsukuba, Japan 1 GDE ACCELERATOR ADVISORY PANEL REVIEW CONVENTIONAL FACILITIES.
Global Design Effort 1 Conventional Facilities and Siting Overview A. Enomoto, J-L. Baldy, V. Kuchler GDE.
Preliminary Studies of the Electric Power Distribution for CLIC
Global Design Effort - CFS for Asian Single Tunnel Configuration Design Progress Masanobu Miyahara KEK.
Joint Institute for Nuclear Research Grigori SHIRKOV Joint Institute for Nuclear Research Dubna, Russia International Intergovernmental Organization 18.
1 STATUS OF ILC ACTIVITY AT JINR G. Shirkov Session of RAS, Protvino, December 22, 2008.
First Results of Geological Investigations of Dubna Siting of Dubna Siting G.Shirkov.
Joint Institute for Nuclear Research Joint Institute for Nuclear Research International Intergovernmental Organization JINR and RUSSIA PARTICIPATION in.
CERN, February 25, 2010 ILC-HiGrade Annual Meeting Global Design Effort 1 ILC-HiGrade Scientific and Annual Mtng CERN · Geneva, Switzerland February 25,
JINR Dubna site proposal for ILC G.Trubnikov Joint Institute for Nuclear Research Sendai, March 2008.
Global Design Effort - CFS CLIC 09 Workshop - WG 5 Technical Systems 1 CLIC 09 WORKSHOP Working Group 5 - Technical Systems ILC REBASELINE ILC.
Potential for water buffering A landscape based approach Lieselotte Tolk, et al.
Global Design Effort - CFS ILC Global Systems Meeting 1 ILC GLOBAL SYSTEMS MEETING CONVENTIONAL FACILITIES AND SITING GROUP Status and Overview.
Subsurface drainage – Investigations
Conclusions Geophysical Methods for Road Construction and Maintenance Hedi Rasul 1&2, Caroline Karlsson 1, Imran A. Jamali 1, Robert Earon 1, Bo Olofsson.
LCC Linear Collider Collaboratio ILC - CFS 12 November 2013 LCWS13 Tokyo University 1 Site-specific CF design from TDR LCWS13, 12 November 2013 Atsushi.
Global Design Effort - CFS ILC CFS and Global Systems Meeting 1 ILC CFS AND GLOBAL SYSTEMS MEETING CONVENTIONAL FACILITIES AND SITING GROUP GENERAL.
CES Status J.Osborne 6 November 2009 Status Report from Civil Engineering and Services Working Group J.Osborne GS/SEM for CES Working Group.
Fred Asiri1 Conventional Facilities and Siting Global Group (CFS) SLAC Update Conventional Facilities and Siting Global Group (CFS) SLAC Update November.
ILC experimental area - How to ‘develop’ CFS details for TDP (cavern size, number of shafts, HVAC, EL spec etc) ? - KEK site specific issues CFS V.Kuchler.
IR location for the shallow site near Dubna A. Dudarev JINR IWLC 2010, October 20.
November 17, st XFEL / ILC Meeting 1 ILC GLOBAL Design Effort The Current ILC Twin Tunnel Design Wilhelm Bialowons and Nicholas Walker · MPY.
Global Design Effort - CFS TILC09 and GDE AAP Review Meeting - Tsukuba, Japan 1 GDE ACCELERATOR ADVISORY PANEL REVIEW CONVENTIONAL FACILITIES.
CLIC Implementation Studies Ph. Lebrun & J. Osborne CERN CLIC Collaboration Meeting addressing the Work Packages CERN, 3-4 November 2011.
1 Global Design Effort TILC08 - WG1 Summary WG-1: Cost Reduction Studies J. Carwardine, T. Shidara, N. Walker (For WG-1 participants)
TILC08 - WG1 Summary Global Design Effort 1 TILC08 仙台 GDE 会議 WG-1 活動報告 GDE 活動報告会 3月11日10:00- 3号館7階会議室 設楽
Global Design Effort - CFS ILC Accelerator Design and Integration Meeting 1 ILC AD&I MEETING CONVENTIONAL FACILITIES AND SITING GROUP UPDATE V.
Global Design Effort - CFS ILC10 Beijing, March, Single-Tunnel Accelerator Configuration Of Asian Region Atsushi Enomoto (KEK)
Recent news from CLIC C&S WG and CLIC-ILC WG on General Issues Ph. Lebrun CLIC Project Meeting 1 June 2011.
The fourth Baseline Technical Review (BTR) - Conventional Facilities and Siting March 2012 All changes made to the CFS 2007 Reference Design during.
J T Volk Fermilab April 2008 Ground Motion Studies at Fermi National Accelerator Laboratory James T Volk Applications Physicist II Vladimir Shiltsev, Shavkat.
Global Design Effort - CFS Accelerator Advisory Panel Review - Oxford UK 1 ACCELERATOR ADVISORY PANEL REVIEW CONVENTIONAL FACILITIES AND SITING.
Global Design Effort - CFS TILC08 Working Group 1 - March 5, CFS Cost Reductions Conventional Facilities and Siting Group A. Enomoto, V.
CLIC Workshop, CERN 1 CLIC/ILC Collaboration Report: Marc Ross (Fermilab); for Nick Walker, Akira Yamamoto Project Managers International Linear.
1 STATUS OF ILC ACTIVITIES AT JINR J.Budagov, A.Dudarev, M.Lyablin, G.Shirkov, G.Trubnikov, A.Sissakian JINR, Dubna, Russia Presented by A.Dudarev.
One Team One Vision With Pride The Association of Mine Surveyors of Zimbabwe AGM KARIBA The Association of Mine Surveyors of Zimbabwe AGM KARIBA.
Global Design Effort - CFS DESY Accelerator Design and Integration Meeting 1 ACCELERATOR INTEGRATION AND DESIGN MEETING CONVENTIONAL FACILITIES.
DR Layout Description ILC DR Technical Baseline Review Frascati, July 7, 2011 Mark Palmer Cornell University.
ILC 2007 Global Design Effort 1 Planning Damping Rings Activities in the Engineering Design Phase Andy Wolski Cockcroft Institute/University of Liverpool.
Get the Ground Water Picture. Individual Questions The horizontal scale of the cross section is 1 inch = 1 mile. The vertical scale is 1 inch = 50 ft.
Summary: Site Discussion Jonathan Dorfan SLAC Plenary Session, June 6, 2008.
Models of the Earth Section 3 Section 3: Types of Maps Preview Key Ideas Topographic Maps Topographic Maps and Contour Lines Index Contour, Contour Interval,
ILC Cryogenic System Shallow versus Deep Tunnel Tom Peterson Dubna Meeting 5 June 2008.
KEK, 04/28/061 Safety Plan Assumptions Break out of fire in the Beam Tunnel is negligible Cables in the Service Tunnel is main fire load They are combustible.
COOLING & VENTILATION PLANTS M. Nonis – CERN EN Department / CV Group Annual Meeting of the FCC study – Rome 14 th April 2016.
CAISSON FOUNDATION.
1 Status of the ILC activity at JINR PAC for Particle Physics 29 January 2009 G.V. Trubnikov.
17-21 April 09 AAP - Tsukuba Global Design Effort 1 First Results of Geological Investigations of Dubna Siting of Dubna Siting Status of the ILC activity.
July 11, 2008M Ross for PM - ILC GDE - ILCDR08 closeout 1 GDE Program for the ILC Technical Design Phase Marc Ross for: Akira Yamamoto, Nick Walker GDE.
ILC CONVENTIONAL FACILITIES A. Enomoto, V. Kuchler, J. Osborne
ILC CONVENTIONAL FACILITIES A. Enomoto, V. Kuchler, J. Osborne
Civil Engineering for FCC-eh and LHeC
CLIC Civil Engineering Update
CLIC Civil Engineering Update
Yasuhiro Sugimoto 2012/2/1 ILD integration meeting
FCC Civil Engineering John Osborne, Jo Stanyard, Matt Stuart(SMB - Site Engineering - FAS Section) Cost & schedule Phase 3 - specification 10th May 2017.
$150K Chicago/ANL seed funding for Braidwood site investigation
CLIC / ILC Collaboration for CFS works
AMERICAN LINEAR COLIDER PHYSICS GROUP Impressions of the Dubna Site
5th FCC Infrastructure & Operation meeting
(Potential) Site and Utilities
Civil Engineering for FCC-eh IR
CLIC Civil Engineering Update
Presentation transcript:

1 STATUS REPORT JINR G. Shirkov, ILCW08, November 17, 2008

2

3 GDE and ILCSC meetings at JINR, June 2008

4 Conclusions We have presented the elements of the GDE plan for the next phase, which we call the Technical Design Phase. –A two stage ILC Technical Design Phase (TDP I 2010 and TDP II 2012 is proposed) Overall Goals: Cost reduction, technical design and implementation plan on the time scale of LHC results SCIENCE remains the key to ultimate success.

5 GDE Meeting, Dubna, June 2008: Dubna Site Discussion

6 Dubna, June 7, 2008

7

8

9

10 Vertical shaft Dubna proposal: Shallow site with single tunnel accelerator tunnel buildings vertical shaft Communication tunnel vertical communication shaft

11 A new suggested variant of the accelerator tunnel layout is under discussion and estimations now. It assumes the following: main (beam) tunnel is located at approximately -20 m (at abs. level m) in order to have impermeable layer above and below to be prevented from subsoil waters; service (communication) tunnel is located directly above the main and around the earth surface (<-3-4 m), practically repeating the relief; technological connection between two tunnels is provided with vertical shafts of different diameters, which are drilled with usual method; connection between surface buildings and underground infrastructure is provided with vertical and horizontal shafts (elevators, stairs, etc) cost of communication tunnel itself on the surface (without any equipment) is estimated by GSPI about 10 times cheaper in comparison with underground tunnel.

12 Such a variant is more efficient economical by several reasons: Service (communication) tunnel can have any size (section) for loading or filling the beam tunnel with any equipment, it is made by open-cut method; Vertical connections are made by well-boring (relatively cheap method in comparison with case of horizontal ones), at the same time their number and sizes can be optimized. In addition – they do not require damp course; Export of the drain waters is provided directly in accordance with relief, without any pumping stations; Exploitation of the communication tunnels is sufficiently easier; Cable and other technological connections between service tunnel with surface building is sufficiently reduced. Service (communication) tunnel

13 Shallow site layout with one tunnel in the Dubna region

14 Miakishevo Hrabrovo GSPI has performed two drillings of chinks of 47 m and 43 m depth. The probes of soils are analyzing now. The power of loan are 27.5 m (2.0 m – 29.5 m) and 37.4 m (8.1 m – 45.5 m) correspondently. Geophysical investigations with a series of explosions have been fulfilled as well. Geological investigations of GSPI in the Taldom region in October 2008