Module 8 Installation & Setup M1000e Chassis

Slides:



Advertisements
Similar presentations
RavensNest 60 Channel Intelligent Video Solution The RavensNest is an enhanced video command and control platform that transforms any centralized analog.
Advertisements

Cisco 6500 E-Series Chassis Up-grade
SwitchBlade ® x908 Advanced Layer 3 Modular Switch.
Cisco UCS Mini Martin Hegarty| Product Manager | Comstor
AC-SSC-1 Installation and operation manual
ModICE Modular Integrated Connector Enclosure
5.3 Installing the blade server in a BladeCenter unit.
PowerEdge M-Series CMC Management
SGI ® Company Proprietary SGI ® Modular InfiniteStorage Sales Deck – V4 – Feb 2013 An evolutionary new compute & storage platform exclusive to SGI.
The 5-slot 5U AC Chassis,fully field deployable chassis with AC power supply for full redundancy. AsisAdvancedTCA Class Asis AdvancedTCA Class.
SGI Confidential Copan 400 Installation. SGI Confidential Installation Overview The approximate minimum time to complete this procedure is.
System X 3500 Fan Cage Removal Here are some basic steps and helpful hints.
SGI Confidential Shelf Hardware. SGI Confidential Shelf Front View Canister Status LEDs Canister 0Canister 7 Canister Position Number Canister.
3U ATCA Shelf October Proprietary and Confidential-
Enclosures & ComponentsBackplanesSystem PlatformsSwitches, Knobs & LEDsCabinets ATCA Systems Technology Meeting CERN Genève.
Asis AdvancedTCA Class. What is PICMG? PICMG - The PCI Industrial Computers Manufacturer's Group Is a consortium of over 450 industrial computer product.
Enclosures & ComponentsBackplanesSystem PlatformsSwitches, Knobs & LEDsCabinets 1 Cooling Unit.
SGI Confidential Application Processor. SGI Confidential Application Processor Overview Application Field Replaceable Units The Application.
ATF2 Power Supply Availability Comparison February 5, ATF2 Power Supply Availability C0mparison Paul Bellomo and Briant lam.
MUST HAVE SHOULD HAVE COULD HAVE Module # 010. Qi Hardware Objectives Recognize hardware Know how to interface to field equipment Know the 4 different.
Module 10 PS M4110 Components. Module Objectives: Describe the indicators on the front panel of the PS-4110 array Demonstrate how to replace a Disk Drive,
Installing Virtualisation Software and Virtual Servers.
Rack Mounted Network Equipment Patch Panels Network Switch Router Rack Servers HDD Arrays UPS System Provides circuit protection and an uninterruptable.
Module 9 PS-M4110 Overview <Place supporting graphic here>
VPN for Sales Nokia FireWall-1 Products Complete Integrated Solution including: –CheckPoint FireWall-1 enterprise security suite –Interfaces installed.
A case should be... The mission of YY-W2xx Server Chassis Application Power User Workstation Small and Medium Business Pedestal Server Quick view at products.
DKTCOMEGA EDFA Product Line Jesper Broszka, Product Manager.
1 PAC530 | Output Controller. 2 The Output Controller (PAC530) provides the local connection on an RS-485 network between an Access and Alarm Server (PAC500)
Controls and Electrical Preferred Technologies Steve Pavis PH-DT-DI CERN Advel Power Supplies and ABB Circuit Breakers.
SGI Confidential Power Bay. SGI Confidential Power Bay Front View AC OK LED DC OK LED Alarm LED Release Latch Power Bay 1 Power Bay 0 Power.
Electronic Systems Support LHC Crates 2005 Paul Harwood PH Electronic Systems Support Group (PH-ESS) Meeting Sept 1, 2004.
©2014 Check Point Software Technologies Ltd Introduction [Confidential] For designated groups and individuals.
Chapter 4 Server Clients Workstation Operating Systems Workstation Requirements NIC Software Setup Resolve a Resource Conflict Prepare Workstation - Windows.
Balancer Operation Intelift Operation Installation Troubleshooting Preventive Maintenance Preventive Maintenance OVERVIEW.
Enterprise Platforms & Services Division (EPSD) JBOD Update October, 2012 Intel Confidential Copyright © 2012, Intel Corporation. All rights reserved.
SL500 Modular Library System. Objectives Locate needed information. Define the safety and ESD requirements. Identify and locate major components. Unpack,
Asis AdvancedTCA Class Front blades and RTM FRU stand for Field Replaceable Unit, front blade is a third party blade (must be ATCA compliant), that the.
1 Installation Training Everything you need to know to get up and running.
-Proprietary and Confidential-
The 2-slot 2U DC chassis is one of a line of products that Asis has developed over the years with it’s vast experience in the ATCA field. Asis AdvancedTCA.
Charging Cart Instruction & User Manual EnTrans Technology Co., Ltd.
Asis AdvancedTCA Class Asis Power Supply Asis Power supply is a propriety power supply design and developed by Telkoor, A well known world leader in the.
GPU Solutions Universal I/O Double-Sided Datacenter Optimized Twin Architecture SuperBlade ® Storage SuperBlade ® Configuration Training Francis Lam Blade.
© 2005 Avaya Inc. All rights reserved. Avaya – Proprietary & Confidential. For Limited Internal Distribution. The information contained in this document.
© 2011 Eaton Corporation. All rights reserved. Configuring BladeUPS™
1062m0656 between 10692m2192 DS/ICI/CIF EqualLogic PS6510E
Enclosures & ComponentsBackplanesSystem PlatformsSwitches, Knobs & LEDsCabinets Friedrich Fix 1 AdvancedTCA Systems Platforms according to PICMG.
Dell EMC Modular Data Centers
EVA4400 Controller and Management Module
LEYARD DIRECTLIGHT LED VIDEO WALL SYSTEM
Avaya VA Line-interactive UPS
Avaya Online UPS 6000 VA.
X-Series Architecture
ModICE Modular Integrated Connector Enclosure
Fujitsu Training Documentation Hardware Installation
Fujitsu Training Documentation Hardware Installation
Flex System Enterprise Chassis
Redundancy Switching Components
K TO 12 CHS MODULE FOR GRADE 9, PP
Avaya Online UPS 6000 VA.
MCU cluster Cristian Alexe 18 October 2010.
Indoor GPON ONT September 2010.
Cisco MDS 9124e Fabric Switch for HP c-Class BladeSystem
SCT/Pixel Draft Rack Layout rcj
Pass4itsure Cisco Dumps
Analog Room Command Module
NSA-7000 Stylish flush mount Network Sensors
ITMI Computer Lab Renewal GBA 573 Summer 2004 Jeffrey Preston
PowerValue 11/31 T Sales Presentation
Power couple. Dell EMC servers powered by Intel® Xeon® processors and running Windows Server* 2016, ready to securely handle dynamic business workloads.
Presentation transcript:

Module 8 Installation & Setup M1000e Chassis <Place supporting graphic here> Welcome to the Dell 12G version of the PowerEdge M1000e training course. This training provides an overview of the components and features of the Dell PowerEdge M1000e Blade Server enclosure.

Module Objectives: Installation of the M1000e platform, including the weight of the unit, both fully loaded and empty. PowerEdge Field Replaceable Units (FRUs). Overview of redundant and non-redundant power configurations. Such as advanced power management and AC and power supply configurations.

PowerEdge M1000e Chassis Installation

Installation The M1000e is heavy. Ships with all modules installed. Up to 390lbs loaded. Empty 98lbs Ships with all modules installed. REMOVE all modules following before lifting including: Power supplies Server blades I/O Modules Do not attempt to lift alone! Use the handles located on the sling provided Installation of a PowerEdge M1000e blade server is not an insignificant matter. The weight of the system can be quite significant, care must be used when installing the enclosure into a rack. Further, rack capacity and stability must be considered. Availability of AC mains power, maintaining proper air flow for proper cooling, and cable management for ongoing ease of maintenance. Caution: Observe OSHA standards before lifting.

Rack Mounting Requires 10 U of rack space, mark installation location Up to four units can be installed in one rack Mount RapidRails or VersaRails assembly Re-install and secure all modules Setup cable management Connect and bundle cable Use the I/O Cable Enumerators Secure cables to the Strain-Relief Bar You must allow 10 U (44.45 cm or 17.5 inches) of vertical space for each system you install in the rack. Identify in the rack where the new enclosure is to be installed and mount the RapidRails or VersaRails assembly at that location, make sure that the left and right rails are mounted at the same height. Caution: If you are installing more than one system, install the first system in the lowest available position in the rack. Remove all blades, rear modules, power supplies, and fans before installing your system in the rack. This lessens the weight of the enclosure and minimizes and potential damage to modules in the event of an accident. Guide the system into the rack and lower the system onto the rail assemblies. Caution: It is recommended that more than one person assist in lifting the system! Notice: When you are lifting and installing your system in the rack, avoid grasping the LCD module on the front of the system as this part is fragile. Tighten the thumbscrews on the chassis front panel. Reinstall the blades, rear I/O modules, power supplies, and fans. To provide maximum serviceability and airflow to your system, your system includes the following cable management features: A strain-relief bar and Velcro tie wraps, which keep the area directly in back of the system as clear of cables as possible and allow you to move the cable bundles when you need to remove modules. An I/O cable enumerator, which maintains the sequence of cables in the order they are connected to the system. Keeping the cable connections intact will facilitate the removal and replacement of I/O modules.

PowerEdge M1000e FRUs

Hot Swap FRU Components CMC iKVM Blades I/O Modules Fan PSU All PowerEdge M1000e modules are hot-pluggable with the exception of the following components which cannot be hot swapped: LCD panel Internal server blade components Mezzanine cards Caution: To ensure proper operation and cooling, all bays in the enclosure must be populated at all times with either a module or with a blank. Recall that the CMC module controls power management for the system. You can program the CMC to configure the power budget, redundancy, and dynamic power of the entire enclosure (chassis, servers, I/O modules, iKVM, CMC, and power supplies). The power management service optimizes power consumption and re-allocates power to different modules based on real-time demand.

Module Buttons and Handles The server module is manually installed by aligning it with one of the open front slot locations and sliding it until the connectors begin to engage with the midplane. A translating handle, which travels in the same direction as the server module, is then used to fully engage and lock it in place. When the blade is securely installed, the handle returns to the closed position. To remove the server module, a button releases the translating handle latch. The handle is then used for pulling the server out of the system, disengaging the internal latch as the handle is pulled outwards and unmating the connectors. Press Button to Release Handle or Module

Installing and Removing Blades There are guide pins on both sides of the server module signal connector for precise alignment to the chassis. Keying features prevent the server module from installing upside down. A defined maximum sliding force insures ergonomic friendliness, while precision point of contact positioning and camming features ensure proper connector wipe for maximum signal quality. Modular server power is received through a dedicated 2x3 power block, with wide power pins designated in such a way to prevent power rail shorting in case a pin bends for any reason. If you are installing a new blade, remove the plastic cover from the I/O connector(s) and save for future use. Orient the blade so that the handle is on the left side of the blade. If you are installing a blade in one of the eight upper bays, align the guide rail on the upper edge of the blade so that the rail fits between the plastic guides on the enclosure. If you are installing a half-height blade in one of the eight lower bays, align the edge of the blade with the guide rail on the floor of the M1000e enclosure. If you are installing a full-height blade in bays 1 or 2 or a half-height blade in bays 12 or 13, rotate the LCD module to the horizontal storage position to prevent accidental damage to the LCD screen. Slide the blade into the enclosure until the handle engages and locks the blade in place.

Blanking Plates CMC blanking plate IOM blanking plate In the absence of a component not being installed, a blanking plate must be installed to maintain consistent airflow and cooling throughout the system. If a plate is missing in either a server slot or the M1000e enclosure, a loss of circulation will occur affecting the cooling performance of the system. PSU blanking plate

Redundant and Non-Redundant Power Configuration

M1000e Power Up to six 2700 watt PSU’s may be installed. 94%+ AC/DC Conversion Efficiency. PSUs operates on 200-240v AC power. Though supported, use of 110-120v AC power not recommended Update CMC if using 110-120v AC Dell does not support the mixing of 230V and 115V within the same enclosure. Active PSUs are load sharing. Total system redundant power is approximately 8100w in a 3+3 power supply configuration. AC redundancy is supported in the following configurations, each of which requires the power supplies in slots 1, 2, and 3 to be connected to a different grid as compared to those in slots 4, 5, and 6. The M1000e enclosure supports up to six hot-swappable power supply modules, accessible from the enclosure back panel. The M1000e views the six PSUs as two banks of 3 PSUs (a 3+3 redundant power supply system), and the chassis will run on just 3 powers supplies in one bank but both banks must be used if redundancy is required. The chassis should be connected with each bank of three power supplies to it's own AC power from a different mains circuits, providing mains redundancy as well as internal chassis power redundancy. Each power supply is rated at 2700w with current sharing between power supplies, total system redundant power is approximately 8100 watts in a fully configured 3+3 power supply configuration (3 PSUs x 2700 watts/PSU = 8100 watts). It is recommended that the 2700w PSU be connected to 200-220v AC power sources, though it will operate on 110v AC power as well but in a reduced power state, so it is not recommended unless required. If using 110v AC power, the power budget calculations need to be updated with the changes, there is a 110v power setting parameter for the CMC that provides this power budget update. Roughly one-half the power is available to the M1000e when using 110v AC power and the CMC needs to be updated in order to calculate the appropriate power budget values. Note: In addition to supplying power to the system, the power supply modules also have internal fans that provide thermal cooling for the blades. A power supply module must be replaced if an internal fan failure occurs. AC redundancy is supported in the following configurations, each of which requires the power supplies in slots 1, 2, and 3 to be connected to a different grid as compared to those in slots 4, 5, and 6: 3+3, 2+2, and 1+1. DC redundancy is supported in the following configurations, each with one extra power supply that comes online if one of the existing power supplies fails: 1+1, 2+1, 3+1, 4+1, and 5+1..

Turn On System Press the power button on the enclosure. The power indicator should light. The chassis power button will turn on all components related to the chassis and affects the main power bus within the chassis. Components such as the iDRACs, IOMs, and iKVM will begin to power up. Blades will not power up. To manually turn off the system, push and hold the power button for 10 seconds to forcefully shutdown the chassis and ALL systems.

Turning On Blades Press the power button on each blade, or power on the blades using the systems management software. Blades can be powered on/off manually with the power button located on each blades faceplate. Pressing the button will power on the blade and begin POST. Pressing and holding the power button for approximately 10 seconds forcefully powers off the blade.

Advanced Power Management

M1000e Power Subsystem The M1000e ships with a minimum of three PSUs in a non-redundant configuration. Three PSUs needed to power a full chassis For redundancy, a minimum of four PSUs recommended Dell recommends fully populating the enclosure with six PSUs. The enclosure takes in AC power and distributes the load across all active internal power supply units (PSUs). If you do not want to use all six power supplies, you can: Manually turn off power supplies not in use. Automatically turn off unused PSUs with dynamic power engagement. When Dynamic Power Supply Engagement (DPSE) is enabled, the PSU units move between On and Off states depending upon actual power draw conditions to achieve high power efficiency by driving fewer supplies to maximum versus all with partial and less-efficient loading.

AC Redundancy Configurations Dual Power Grid: Protects against failure to an AC grid Protects against failure to up to 3 power supplies The purpose of the AC redundancy policy is to enable a modular enclosure system to operate in a mode in which it can tolerate AC power failures. These failures may originate in the AC power grid, the cabling and delivery, or a PSU itself. With AC redundancy, the system can tolerate the loss of an entire AC power grid or up to 50 percent of its capacity with failures of individual PSUs while still maintaining an operational state. The CMC supports three levels of N+N AC Redundancy—1+1, 2+2, and 3+3. 1+1 AC Redundancy Level — at least one PSU is connected to each AC grid. 2+2 AC Redundancy Level — at least two PSUs are connected to each AC grid. 3+3 AC Redundancy Level — three PSUs are connected to each power grid. Since three PSUs can power the entire enclosure, this configuration is unaffected by the complete failure of one AC grid without loss of power to the enclosure. With AC Redundancy power input is load-balanced across all supplies. The first group of up to three power supplies is connected to one AC grid, while the second group of up to three is connected to the other AC grid. When the system is running optimally in AC Redundancy mode, power is load-balanced across all active supplies. In case of failure, the power supplies on the functioning AC grid take over with sufficient capacity. In AC redundancy, the CMC reports all active power supplies as online. This is done to ensure that the system does not experience downtime in the event of a power failure to a grid. If any of the PSUs in a grid fail, the CMC reports the Enclosure Redundancy Status as No Redundancy. E-mail and/or SNMP alerts are sent to administrators if you have configured the Redundancy Lost event for alerting. The no redundancy mode is the factory default setting for 3 PSU configuration and indicates that the chassis does not have any power redundancy configured. In this configuration, the overall redundancy status of the chassis always indicates No Redundancy.

Power Supply Redundancy Configuration Dual or Single Power Grid: Power Supply Redundancy protects against failure to a single power supply. Power Supply or DC Redundancy identifies the capacity of the highest-rated power supply in the chassis and uses that PSU as a spare, ensuring that a failure of any one power supply does not cause the server modules or chassis to power-down. Power Supply Redundancy mode does not use all the power supplies; it uses sufficient power supplies to meet the power demands of the chassis and one additional power supply. Excess power supplies do not participate in Power Supply Redundancy unless there is a failure or removal of one of the active power supplies. The power supply redundancy mode is useful when redundant power grids are not available, but you may want to be protected against a single PSU failure bringing down your servers in a modular enclosure. One PSU's capacity over the allocation requirements is kept in online reserve for this purpose: This forms a Power Supply redundancy pool. These PSUs join the redundancy pool if any PSU in the pool fails. Any PSU installed outside this pool is not used.

No Redundancy Configuration Single Power Grid: No protection against grid or power supply failure No Redundancy provides no protection from either a failure of the power grid (main circuit) or a failure of a PSU. The No Redundancy mode uses sufficient number of power supplies at a time, without backup, to power the system including the chassis, servers, IOMs, iKVM, and CMC. Failure of one of the power supplies being used may cause the server modules to lose power and data.

Module Summary After completing this module you should now be able to: Describe the steps to safely install an M1000e. Identify hot swappable components. Describe the power specifications associated with the M1000e enclosure. Understand how to power on both the M1000e enclosure and the blade servers. Describe the various M1000e power options, including redundant and non-redundant AC grids and power supplies configurations.

Questions?