ITMI Computer Lab Renewal GBA 573 Summer 2004 Jeffrey Preston

Similar presentations


Presentation on theme: "ITMI Computer Lab Renewal GBA 573 Summer 2004 Jeffrey Preston"— Presentation transcript:

1 ITMI Computer Lab Renewal GBA 573 Summer 2004 Jeffrey Preston

2 ITMI Computer Lab Renewal
Project Summary Replace computers in ITMI Lab located at AWA 221 Provide state-of-the-art computing for 28 seats Replace aging servers Update software Improve classroom environment November 8, 2018 ITMI Computer Lab Renewal

3 ITMI Computer Lab Renewal
Problem Statement Computers in lab are outdated Student writing surface inadequate Server software no longer supported Classroom layout difficult for lectures Computers running older software November 8, 2018 ITMI Computer Lab Renewal

4 ITMI Computer Lab Renewal
Project Objectives Replace student client computers Replace servers Install wireless router Complete prior to Fall semester Stay within budget November 8, 2018 ITMI Computer Lab Renewal

5 ITMI Computer Lab Renewal
Project Scope Justification USD Business School desires state-of-the-art computer lab Current computers more than 3 years old Students do not have desk space Servers running old operating systems Students need wireless connection November 8, 2018 ITMI Computer Lab Renewal

6 Project Characteristics
Computers replaced by Dell OptiPlex desktop computers Systems will use 17” flat screen monitors November 8, 2018 ITMI Computer Lab Renewal

7 Product Characteristics
Servers will be replaced by Dell PowerEdge 1750 rack mount servers November 8, 2018 ITMI Computer Lab Renewal

8 Product Characteristics
Wireless router will be securely installed in server rack Reuse network cables and power supplies Reuse routers November 8, 2018 ITMI Computer Lab Renewal

9 Expected Benefits of Project
Student desk space for note writing and following along with course materials Students can use latest business software Servers will run latest operating systems Rack mounted servers will save lab space Wireless connection allows students to use personal laptops easily Flat screen monitors use less energy November 8, 2018 ITMI Computer Lab Renewal

10 ITMI Computer Lab Renewal
Project Costs 29 Dell Optiplex SX280 client computers $41,942 2 Dell PowerEdge 1750 servers 3,742 Other materials (Cables, power strips, paint) 500 Shipping 3,800 Installation & setup (Labor) 6,812 Contingency 5,000 Projected cost of project $61,796 November 8, 2018 ITMI Computer Lab Renewal

11 ITMI Computer Lab Renewal
Measures of Success New computers running latest software Desktop for note taking and reading Computers networked together Servers allow remote FTP functions Wireless connection available Data secure On time and on budget November 8, 2018 ITMI Computer Lab Renewal

12 ITMI Computer Lab Renewal
Project Design Requirement analysis 28 seat lab Instructor’s station linked to projector Desktop space available for students Students can use FTP for projects Wireless connection available Servers securable November 8, 2018 ITMI Computer Lab Renewal

13 ITMI Computer Lab Renewal
Project Design Feasibility study Technical feasibility Known technology, lab configured, rack in place, wireless router purchased Economic feasibility Expenditures approved in USD FY budget Operational feasibility Renewed lab used in Fall term: 3 graduate classes taught, undergraduate classes November 8, 2018 ITMI Computer Lab Renewal

14 ITMI Computer Lab Renewal
Project Design Risk management Low risk overall Known risks Dell ships late or ships wrong systems Computers damaged in transit Servers more difficult to configure than planned Scheduling conflicts with USD staff Facilities staff delayed in removing old computers, rewiring projector Migrating server data problematic November 8, 2018 ITMI Computer Lab Renewal

15 Project Implementation Work Breakdown Structure
November 8, 2018 ITMI Computer Lab Renewal

16 Project Implementation Staffing
Dr. Rebman USD Facilities Staff Graduate Assistants Graduate Students November 8, 2018 ITMI Computer Lab Renewal

17 ITMI Computer Lab Renewal
Project implementation November 8, 2018 ITMI Computer Lab Renewal

18 ITMI Computer Lab Renewal
November 8, 2018 ITMI Computer Lab Renewal

19 ITMI Computer Lab Renewal
Testing All computers and software work Network operating Clients Ftp Wireless Servers secure Computers configured to lab rules November 8, 2018 ITMI Computer Lab Renewal

20 ITMI Computer Lab Renewal
Final Analysis Project deemed success On time August 21, 2004 On budget Improved instruction Use of projector, eye contact with students Improved student productivity Desk space, latest software, wireless use November 8, 2018 ITMI Computer Lab Renewal