QoSMOS Summary Michael Fitch.

Slides:



Advertisements
Similar presentations
State University – Higher School of Economics
Advertisements

Short overview of the SCORE project
WAPECS - A more flexible spectrum management approach Isolde Goggin Chairperson of COMREG, Ireland, and RSPG Rapporteur on WAPECS.
Erasmus Mundus Information Day 20 January Erasmus Mundus Information Day 20 January ERASMUS MUNDUS PREPARING YOUR APPLICATION.
Introduction to VET Quality Assurance in the UK Mark Novels 6 th December 2011 Quality Assurance in Technical and Vocational Education and Skills Study.
OECD International Futures Programme 1 OECD Futures Project The Commercialisation of Space and the Development of Space Infrastructure: The Role of Public.
Medium-term strategic plan: planned financial estimates for the period E/ICEF/2009/AB/L.5.
Mr Neil Williams Head of the Physical and Engineering Sciences Unit Madrid: 31 May 2010.
7th CERP Meeting Sophia-Antipolis 08 October 2008 CE RFID Coordinating European Efforts for Promoting the European RFID Value Chain Dr. Birgit Gampl 7.
AIAA Task Force on Earth Observations 2 October 2009 AIAA HQ Reston VA.
EURO4M Financial aspects of the project. Contents presentation: - Euro4M General - Financial and Legal aspects so far - Reporting - Difference FP7 vs.
Zürich, January 28, 2009 ERCIM WG eMobility Meeting Torsten Braun University of Bern, Switzerland
1 The new ESF Investing in your Future -
Jean-Michel Courades, DG AGRI Rural Development Networking and Cooperation
The Implementation Structure DG AGRI, October 2005
TEN-T Info Day for AP and MAP Calls 2012 EVALUATION PROCESS AND AWARD CRITERIA Anna Livieratou-Toll TEN-T Executive Agency Senior Policy & Programme Coordinator.
Information and Communication Technologies (ICT) in the Seventh Framework Programme Coordination actions ICT Calls Jan- March 2012.
INFSO/F3 1 The TEN-Telecom Programme Jose Soler INFSO/F3, EC TEN-TELECOM Information Day.
Regional and national initiatives in support of European Technology Platforms Dr. Fiona Williams Chairman, eMobility steering board
Information Day Call 2001/1 - Brussels 19 June Call for proposals 2001/1 HOW TO PREPARE AND PRESENT YOUR PROPOSAL Willy MAES DG INFSO/F3
HOUSING IN JESSICA OPERATIONS Proposal for a Working Group Elena Szolgayová, Ministry of Transport, Construction and Regional Development, Slovak Republic.
ADVANCED SATELLITE MOBILE SYSTEMS TASK FORCE PRESENTATION Emanuele DAndria – Chairman
The NATURE–SDIplus project Best Practice Network for SDI in Nature Conservation Co-funded by the Community Programme eContentplus ECP-2007-GEO Co-funded.
EN Regional Policy EUROPEAN COMMISSION Information and Publicity SFIT, 15 June 2006 Barbara Piotrowska, DG REGIO
1 17/3/2009 European Commission Directorate General Information Society & Media Funding Instrument Briefing for Remote Reading.
Introduction of participants / project ideas (PI) Presentation: What makes a good partnership? Presentation: Which projects is NWE looking for? Speed dating.
About the European Science Foundation 1 Dr. Nina Hoffman, Humanities and Social Sciences Unit, European Science Foundation.
International Telecommunication Union ITU-D Overview.
ITU Case Studies for Serbia, Germany, Poland and Hungary Mr Peter Vari ITU Expert.
Project design, preparation and approval Basel Convention Resource Mobilization Workshop Nairobi, 3 – 7 December 2006 Andreas Arlt Secretariat of the Basel.
EA Demonstration Study : Dissemination Forum – 8 June EA Views and Sub-views Patrick Bardet EA Unit.
EA Demonstration Study : Dissemination Forum – 8 June EAEA Framework Proposal Paolo Monaco EA Unit.
The Mutual Benefits of Engaging with Industry? Cathy Johnson, University of Nottingham.
UK-Brazil urban research network Oxford Workshop 9-11 March 2011 UK-Brazil Urban Research Network.
Collection-level description & the Information Landscape: users evaluate strategies for resource discovery Collection Description Focus Workshop 5 Cambridge,
© Statistisches Bundesamt, B 2 / Institut für Forschung und Entwicklung in der Bundesstatistik Statistisches Bundesamt ESSnet on Preparation of Standardisation.
Shared Use of Radio Spectrum in the EU
South East Europe Investment Committee Work Programme and Communication Plan for th Meeting of the South East European Investment Committee Sarajevo,
1 Welcome to KTH! KTH, the Royal Institute of Technology Excellence in Education, Research and Entrepreneurship Victor Kordas, KTH Grants Office.
WP3. Evaluation, Monitoring and Quality Plan Dr. Luis Sobrado 27 th May 2011.
Human Capital Investment Programme Disability Activation Project (DACT) WELCOME Support Workshop Thursday 7 th February
RIIO – ED1 timetable Robert Friel Regulatory Strategy and
NJDOE TALENT DIVISION OVERVIEW prepared for: New Jersey Association of School Administrators April 30,
Distributed Energy Resources Research Infrastructure.
Contract N°: IEE/08/425/SI Duration: 28 months ( ) Coordination: O.Ö. Energiesparverband June 2006 Solar Process Heat SO-PRO
European Rail Agency Workshop 29 th September 2011 (Lille) Dr Björn Paulsson (UIC) Dr Stephen Ingleton (Newcastle University) REDUCING THE OCCURRENCES.
WP3: Fixing RES-H/C targets Lukas Kranzl, Andreas Müller RES-H Policy Kick-off, October 2008.
Proactively Preventing Freight Wagon Derailment Innotrans | Berlin| 18 th September Dr Björn Paulsson (UIC) Grigory Kozyr(UIC) Gordana Vasic (NewRail.
Project Title: Developing Effective Learner Training Across Europe (D.E.L.T.A.) PRESENTED BY: Mercy Maclean- Health Psychology Management Org. Services.
PUBLIC HEALTH INNOVATION AND RESEARCH IN EUROPE AND THE UNITED KINGDOM EXPLORING THE BREADTH OF PUBLIC HEALTH RESEARCH FPH ANNUAL CONFERENCE 2012, CARDIFF.
Information and Communication Technologies (ICT) in the Seventh Framework Programme Support actions.
SUPA KT Presentation to the SUPA International Advisory Board April 2012.
European preparations for WRC Stella Lyubchenko CEPT Workshop on European Spectrum Management and Numbering 4 th June 2014.
OBAN Public document OBAN Open Broadband Access Networks IST 6FP Contract No Deliverable D2 Project Presentation.
Session 6C, 11 th June 2008 ICT-MobileSummit 2008 Copyright 2008 ICT-E3 E3E3 Towards Cognitive Use of Radio Resources: Shaping Radio Regulation for the.
Co-funded by the EC under the FP7 Programme PROJECT PRESENTATION Policy Gadgets Mashing Underlying Group Knowledge in Web 2.0 Media.
ITU Regional Workshop on on Efficiency of the Frequency Spectrum Use in the Arab Region Amman (Jordan), 5 – 7 December 2011 ITU Arab Regional Office Presented.
Ambient Assisted Living, AAL Joint Programme Overview – and preliminary results and experiences of the first call Silas Olsson AAL Association, Central.
Technology Strategy Board Driving Innovation Participation in Framework Programme 7 Octavio Pernas, UK NCP for Health (Industry) 11 th April 2012.
The research leading to these results has received funding from the European Community's Seventh Framework Programme (FP7/ ) under grant agreement.
WALiD Wind Blade Using Cost-Effective Advanced Composite Lightweight Design Project Duration: 1 st February 2013 – 31 st January 2017 Grant Agreement No:
1 CHORUS + Coordinated approacH to the EurOpean effoRt on aUdio-visual Search engines ” Grant Agreement No CHORUS + 01/01/2010 – 31/12/ Jean-Charles.
This project has received funding from the European Union’s Seventh Framework Programme for research, technological development and demonstration under.
HMA AWG Slide 1 GIGAS Pier Giorgio Marchetti - European Space Agency
2. The funding schemes ICT Proposer’s Day Köln, 1 February 2007 The ICT Theme in FP7 How to participate to ICT in FP 7.
Background CRiteria for the IDentification of Groundwater thrEsholds BRIDGE Project Presentation Contract N° (SSPI) Co-ordinator: BRGM (Fr)
European Environment Agency
Technical Working Group meeting 21 March 2012 Brussels
Project information and management (WP1)
Juan Gonzalez eGovernment & CIP operations
Presentation transcript:

QoSMOS Summary Michael Fitch

At a glance Quality of Service and MObility driven cognitive radio Systems Is an FP7 Integrated Project Call 4 objective ICT-2009.1.1; The Network of the Future, part (b): Spectrum-efficient radio access to Future Networks Duration is 36 months from January 2010 Budget 1198 PMs Total = 14.5M€, EC contribution = 9.4M€ Date, slide number

Participant organisation name Partners Participant no. * Participant organisation name Part. short name Country 1 (Coordinator) British Telecommunications PLC BT United Kingdom 2 Telenor ASA TEL Norway 3 Commissariat à l’Energie Atomique CEA France 4 Oulun Yliopisto UOULU Finland 5 Technische Universität Dresden TUD Germany 6 Instituto de Telecomunicões IT Portugal 7 NEC Technologies (UK) Ltd NTUK 8 Agilent Technologies Belgium NV AGILENT Belgium 9 Thales Communications SA TCF 10 University of Surrey UNIS 11 NEC Corporation NEC Japan 12 Fraunhofer-Gesellschaft zur Förderung der angewandten Forschung e.V. Fraunhofer 13 TST Sistemas SA TST Spain 14 Alcatel-Lucent Deutschland AG ALD 15 Budapesti Műszaki és Gazdaságtudományi Egyetem BME Hungary 22 March 2017, 3

External Advisory Board Agence Nationale des Fréquences (ANFR) Bundes Netz Agentur (BNetzA) Radio Communications Agency, Netherlands (Agentschap Telecom) AT4 Wireless SDR Forum Südwestrundfunk (SWR) BBC Microsoft Association of Professional Wireless Production Technologies e.V. (APWPT) 22 March 2017, 4

Why do we need QoSMOS ? To develop a framework to improve utilisation of radio spectrum, consistent with co-existence with other services and opening up of the mobile broadband value chain, A cognitive approach to align with the strategies of the regulators A pan-European effort with a range of partners is needed to bring all the pieces together and move them close to market 22 March 2017, 5

Objectives The main objective is to provide a platform for efficient radio access to future networks Under this are two S & T objectives Cognitive Wireless Access Provision [measurable criteria] Platform aspects Intelligence aspects Network Support Provision [measurable criteria] And two non-S & T objectives Use-case development [guidelines on marketing] Preparation of regulatory policies [response of regulators] 22 March 2017, 6

Concept A significant novelty is a two-step spectrum management process An upper cognitive manager that manages the spectrum portfolio A lower cognitive manager that allocates resource 22 March 2017, 7

Allocation of workpackages to objectives 22 March 2017, 8

Workplan 22 March 2017, 9

Milestones are EAB meetings MS1 – month 2 (should have been Feb 2010) Workshop, ‘Setting the scene’ Introduction to the project, planning, use-case review MS2 – month 11 (November 2010) Workshop, ‘Spectrum portfolio and scenarios’ review and ratify initial scenarios, architectures, models and frameworks MS3 – month 19 (July 2011) – with Industry Workshop, ‘Regulation impact and impact on regulation’ Disseminate, review and ratify Consolidated Scenarios, Architecture description of cognitive and spectrum manager functions and test-bed design 22 March 2017, 10

Milestones are EAB meetings MS4 – month 30 (June 2012) Workshop, ‘Opportunities and chances, new models for new actors’ Review results of Simulations and Models, demonstrations of cognitive functions and transceiver platform MS5 – month 36 (December 2012) – with Industry Workshop, ‘Way forward – the QoSMOS legacy’ Final demonstration, downstream final designs The output from each of the 5 milestones will be a restricted report 22 March 2017, 11