Muon Meeting 11/11/2009: Introduction G. Passaleva.

Slides:



Advertisements
Similar presentations
Davide Piccolo INFN Napoli Muon Annul Review Cern 15 September 2003 Chamber Production QA/QC MUON ANNUAL REVIEW On RESISTIVE PLATE CHMABERS CERN, 15 September.
Advertisements

18 Bit ADC Status Collaboration meeting May 18, 2007.
March 02, 2009LHCb Muon Commissioning meeting 1 First week of chambers test Alessandro Cardini, Davide Pinci, Fernando Rodrigues, Maria Luisa Porto, Rafael.
27/02/2002M.D.P. - ATLAS Muon Week1 First results of Atlas RPC cosmic rays test Massimo Della Pietra Atlas RPC Group Napoli ( M. Alviggi, V. Canale, M.
Pavia 25/11/2003Davide Piccolo INFN Napoli Status of assembling and Chamber results at HT Pavia 25/11/2003 Davide Piccolo.
Marzo 2004Flavio Dal Corso INFN-Pd1 Results from May 2003 Test Beam First test of all the electronics integrated in a MB1 Minicrate Items tested: Hardware.
SPD commissioning Ricci, Míriam, Daniel, Edu, Hugo et al. from 1.
Imprecise Computing Yavuz Yetim. Overview Motivation Background Definition and Causes of Imprecision Solution Approaches Discussion of Two Methods Future.
Status of the MICE SciFi Simulation Edward McKigney Imperial College London.
Beam Position Monitors MICE CM Harbin January, 2009.
Octal ASD Certification Tests at Michigan J. Chapman, Tiesheng Dai, & Tuan Bui August 30, CERN.
Test Pulse Analysis Carl Goodrich 7/31/07. Test Pulse The Test Pulse was injected into channels 4 and 23 –We expect channels 3, 4, 5, and 22, 23, 24 to.
Luminosity Monitor MWPCs, test beam 22 results. A.Kiselev OLYMPUS Collaboration Meeting DESY, Hamburg,
ACORDE REPORT Pedro Podesta UAS Mexico. Geometry ( No changes) Alignment (No changes) QA (No changes ) Shuttle (In progress) To do Outline.
K.Hoepfner, RWTH Aachen IIIAQuality Control at Aachen Production site1 (Selected Items on) Quality Control at Aachen.
1 ECS CALO HV Control CALO Piquet Training Session Anatoli Konoplyannikov /ITEP/ Outline  ECS HV control of the ECAL and HCAL.  ECS HV control.
Chamber Construction QC at CIEMAT B. de la Cruz CIEMAT (Madrid) CMS Week June 2002.
Noise studies: hardware tests and preliminary results Anna, Anton, Giovanni, Pigi, Silvia, A. Boiano, A. Vanzanella.
RPC Readiness for Data-taking RPC Collaboration 1.
Andrew Glenn 4/21/02 Commissioning and Performance of the. Muon Identifier Andrew Glenn (University of Tennessee), for the PHENIX collaboration April APS.
Ivan Vitev & E906 Muon Identifier Status Patrick McGaughey and the muon radiography team E866 Meeting at FNAL June 20-21, 2007 Large Muon Tracker at LANSCE.
Debugging of M2-M5 G. Passaleva. 11/02/2009 Muon System mini review G. Passaleva 2 outline Short summary of Muon readout channel organization Connectivity.
COMPTON POLARIMETRY Collected data Cavity power Status on counting methods Systematic errors and hardware issues.
ATLAS Liquid Argon Calorimeter Monitoring & Data Quality Jessica Levêque Centre de Physique des Particules de Marseille ATLAS Liquid Argon Calorimeter.
MuTR/MuTrig Readiness for Run13 Itaru Nakagawa on Behalf of MuTrig/MuTr Group 1.
CAF shifts and procedures Marcello, Raffaello, Alberto, Pigi, Sungeun, David, Silvia, Anna & all the 2009 shifters.
Muon System Safety Issues Burkhard Schmidt.
Detector Diagnostics Calibration Analysis Ped/LED/Laser RadDam Analysis Detector Optimization Lumi Detector Performance Monitoring DQM On/Offline Prompt.
1 xCAL monitoring Yu. Guz, IHEP, Protvino I.Machikhiliyan, ITEP, Moscow.
Muon commissioning status and plans G.P. C. De Plano.
Straw Working Group Status assembly at CERN Plans 10/2/14Straw WG.
4 th Workshop on ALICE Installation and Commissioning January 16 th & 17 th, CERN Muon Tracking (MUON_TRK, MCH, MTRK) Conclusion of the first ALICE COSMIC.
8/18/2004E. Monnier - CPPM - ICHEP04 - Beijing1 Atlas liquid argon calorimeter status E. Monnier on behalf of the Atlas liquid argon calorimeter group.
Bernhard Schmidt DESY - HH PRC open session, October 30, 2002 HERA-B.
cm 150 cm The Al foil is large as the M3 wall  we can put 1 raw (5 chambers) or 2 raws There is an insulating material (varnish) on the.
1 SDD: DA and preprocessor Francesco Prino INFN Sezione di Torino ALICE offline week – April 11th 2008.
T. Orimoto, ECAL in CRUZET 1 ECAL in CRUZET CRUZET Data Analysis Jamboree 30 May 2008 Toyoko Orimoto California Institute of Technology On behalf of the.
Chamber Monitor Panel Emiliano Furfaro 16 october 2012.
Performance of the PHENIX Muon Identifier Introduction Calibration with cosmic rays Performance in Au+Au collisions Summary Hiroki Sato, Kyoto University.
1 User guide for Muon shifter part 2 : control of LV, HV, TELL1 Preliminary version 9-July-08 (to be checked by Michela) I have simply put together the.
Muon Piquet Training V.0 W Baldini, E.Furfaro, O. Maev June 11-th 2015.
1 Plans for first beams - - triggers from the BRM group (BSC, BPTX) Gábor Veres for the BRM group CMS Trigger Technical Coordination Meeting 8 October,
Status of Muon Activities W.Baldini, N. Bondar, O.Maev, B. Schmidt LS1 Meeting Dec. 20-rd 2013.
Run2 Muon System Experts and other thoughts Alessandro Cardini INFN Cagliari.
Yu. Guz 21/04/20061 Database usage by calorimeters Yu. Guz IHEP Protvino.
10/2/2002MJL - MuTr DC Report Muon Tracking Status South North.
15/6/2006Gaia Lanfranchi - LNF-INFN1 Why do we have to measure efficiencies in the Muon Detector? Muon Software Meeting, June 15th G. Lanfranchi LNF-INFN.
Muon System Update: Next Steps Alessandro Cardini INFN Cagliari.
In the (rare) normal operation mode main actions for editing the settings of the muon system and for checking the configuration and the noise level of.
S.MonteilPS/SPD COMMISSIONING1 OUTLINE 1)PROGRESS REPORT. 2)PLANS. 3)CONCLUSION. COMMISSIONING MEETING – JUNE 2008.
December 3, 20031Muon Integration Meeting Outline: Status of Calorimeter and Muon system Plug simulations Status of plug dimensions Conclusions Reminder:
Calorimeter global commissioning: progress and plans Patrick Robbe, LAL Orsay & CERN, 25 jun 2008.
Muon HLT: status of the algorithms and performance Sergio Grancagnolo for the Muon HLT group.
27 December 2006 LHCb Status Report (A.Vorobyov) 1 LHCb.
1 Installation Status Remaining Issues RIKEN/RBRC Itaru Nakagawa.
Status of the Muon detector Alessandro Cardini CERN & INFN Cagliari Thanks do Davide, Rafael, Maurizio, Oleg, for part of the material included here.
E.Gushchin,S.Filippov(INR,Moscow) 16 April 2008Calo commissioning meeting CERN PS/SPD LED monitoring system status General status LED signal is used for.
1 Methods of PSD energy calibration. 2 Dependence of energy resolution on many factors Constant term is essential only for energy measurement of single.
Trigger & Tracking detector for CMS
EC Software Suite 1 EcMon: Monitors raw, calibrated and reconstructed data in real-time with detector map navigation, strip- charts, histograms. Single-event,
Feb C.Smith UVA EC energy calibration – g13 pass0 For pass0 data were cooked with CALDB calibration constants reset to nominal 10 channels / MeV.
Approved Plots from CMS Cosmic Runs (mostly CRUZET, some earlier)
News on second coordinate readout
Francesco Gonnella NA62 Collaboration meeting Washington DC, U.S.A.
ScECAL+AHCAL+TCMT Combined Beam FNAL
مهندسی کنترل صدا و تجهیزات حفاظت شنوایی
VELO Software Status Some highlights of recent work
ВОМР Подмярка 19.2 Възможности за финансиране
Споразумение за партньорство
J. Rutherfoord & P. Schacht 17 May 2004
Presentation transcript:

Muon Meeting 11/11/2009: Introduction G. Passaleva

29/11/2006 Muon Meeting Status Muon system is in good shape Muon  L0 Ok Noise: a few noisy channels to “understand” – Set up the final thresholds and HV settings Timing: generally OK; a few subtle “bugs” are being corrected; reference timing will be determined with the latest cosmic runs Hardware:  all the logical channels OK (except for a few units (<0.1%)  HV, a few sparking gaps disconnected

29/11/2006 Muon Meeting Organization DPG:  Alessia, Roberta, Bombepo: noise, timing, efficiency, hardware performance studies  Giulia, Rolf, Walter: noise, timing, optimization  Giacomo, GP: timing, monitoring, efficiency  Stefania, Silvia, Patrizia,Giulia: alignment, efficiency  Burkhard, Lukas: noise, threshold settings  Sandro, Caterina, Davide: ECS, timing, thresholds  Gaia, Alessio, Matteo muon ID Other items ?, other names ?