Prototype Mechanical / optical considerations 1.Current LED system performance 2.New APD / Fiber /Strong Back integration scheme.

Slides:



Advertisements
Similar presentations
Development of scintillation detectors with MRS APD light readout for CBM Muon system and ECAL preshower Alexander Akindinov ITEP(Moscow) on behalf of.
Advertisements

1 ALICE EMCal Electronics Outline: PHOS Electronics review Design Specifications –Why PHOS readout is suitable –Necessary differences from PHOS Shaping.
TileCal Electronics A Status Report J. Pilcher 17-Sept-1998.
1 Secondary Emission Beam Profile Monitor H. Haseroth, CERN.
Slide 1 Diamonds in Flash Steve Schnetzer Rd42 Collaboration Meeting May 14.
SiD EMCal Testbeam Prototype M. Breidenbach for the SiD EMCal and Electronics Subsystems.
Cost estimation for production & installation of Calorimeter System V. Issakov Physics Department, Yale University, New Haven, CT /9/2004.
Status of EIC Calorimeter R&D at BNL EIC Detector R&D Committee Meeting January 13, 2014 S.Boose, J.Haggerty, E.Kistenev, E,Mannel, S.Stoll, C.Woody PHENIX.
AHCAL – Electromechanical Integration EUDET annual meeting – Paris Oct M. Reinecke.
GLD Calorimeter Status Oct 学術創成会議 S. Uozumi Shinshu University FJPPL meeting held at the end of September. Preparation underway toward the ECAL.
The Design of Barrel Electromagnetic Calorimeter (BEMC) October Lu Jun-guang.
Study of response uniformity of LHCb ECAL Mikhail Prokudin, ITEP.
Anatoli Konoplyannikov Design and integration of HV, LED monitoring and calibration system for HCAL Overview of the subsystems design High voltage.
Status of Projectile Spectator Detector A.Kurepin (Institute for Nuclear Research, Moscow) I. Introduction to PSD. II. Conception and design. III. Development.
R&D on W-SciFi Calorimeters for EIC at Brookhaven E.Kistenev, S.Stoll, A.Sukhanov, C.Woody PHENIX Group E.Aschenauer and S.Fazio Spin and EIC Group Physics.
Status of the NO ν A Near Detector Prototype Timothy Kutnink Iowa State University For the NOvA Collaboration.
The Scintillator ECAL Beam Test at FNAL Adil Khan International Linear Collider Workshop 2010 LCWS10 & ILC10, Beijing, China CALICE Scintillator ECAL group.
GLAST LAT ProjectI&T&C Pre PDR, October 2, 2001 E. do Couto e Silva1 I&T&C Organization Chart I&T&C Manager Elliott Bloom WBS I&T Engineer B. Grist.
A N DY Status Commissioning with colliding beams (p  +p  at  s=500 GeV) L.C.Bland, for AnDY 8 March 2011 Time Meeting, BNL.
Light Calibration System (LCS) Temperature & Voltage Dependence Option 2: Optical system Option 2: LED driver Calibration of the Hadronic Calorimeter Prototype.
Munich, 18 Oct 2006J. Cvach, annual JRA31 JRA3 Institute of Physics ASCR Prague 1.ECAL, VFCAL (V. Vrba) 2.HCAL (J. Cvach) 3.Exchange in NA2 (travels 8.5.
Future Beam Test Plans of the GLD Calorimeter Aug 学術創成会議 Satoru Uozumi (Shinshu) for the GLD calorimeter group We are planning to have two beam.
The CMS Electromagnetic Calorimeter Roger Rusack The University of Minnesota On behalf of the CMS ECAL collaboration.
Fiber Tracker Update Edward McKigney Imperial College July 3 rd, 2002.
Status of the PSD upgrade - Status of production of new temperature, HV control systems MAPD gain monitoring system. -Status of the PSD temperature stabilization.
1 Prototype Calibration System for Forward Hadron Calorimeter L. Almeida, M. Baarmand, L. Caraway, M. Hohlmann, T. Qureshi, I. Vodopianov FLORIDA TECH.
GEM chambers for SoLID Nilanga Liyanage University of Virginia.
July 19, 2006VLCW-06 Vancouver1 Scint/MAPMT Muon Prototype Operation Robert Abrams Indiana University.
Prototypes of high rate MRPC for CBM TOF Jingbo Wang Department of Engineering Physics, Tsinghua University, Beijing, China RPC-2010-Darmstadt, Germany.
ECL trigger for Super Belle B.G. Cheon (Hanyang U)‏ KEK 1 st open meeting of the Super KEKB Collaboration.
LCTPC photoelectron calibration system D. Karlen / U. Victoria & TRIUMF LCTPC subsystems meeting DESY, February 25-26, 2008.
12 October 2001, M. LefebvreHEC-Athena Tutorial: HEC beam test primer1 HEC Beam Test Primer Production modules of the HEC have been tested in particle.
PSD upgrade: concept and plans - Why the PSD upgrade is necessary? - Concept and status of the PSD temperature control - Concept of the PSD analog part.
first results from EMCal test beam
SiPM for CBM Michael Danilov ITEP(Moscow) Muon Detector and/or Preshower CBM Meeting ITEP
Main HCAL, JUL1,2008Ivo Polak, IP_ASCR, Prague1 Calibration system with optical fibers HCAL main meeting, DESY.
1 Overview of the HCAL LED monitoring PRR note CALO meeting Anatoli Konoplyannikov ABSTRACT In this note the design and integration of the LED.
DESY BT analysis - MPPC Saturation Correction - S. Uozumi Feb Sci-ECAL meeting 1.MPPC Gain Measurement (with LED data) 2.Inter-calibration of readout.
Systematics on ScECAL 1 st prototype DESY Apr , CALICE Satoru Uozumi for the CALICE collaboration NIM A, 763 (2014) 278.
Nantes — 2008, July Analysis of results from EmCal beam test at CERN PS (and SPS) energies P. La Rocca & F. Riggi University & INFN Catania University.
Short report on MPPC gain monitoring system S. Uozumi Jun ScECAL meeting At the FNAL BT, having the gain monitoring system for all the channel.
The 2 nd SCECAL module for the Fermilab beam test - tentative idea - S. Uozumi (Shinshu) Jun GLDCAL meeting Next beam test will be held likely.
Hall A Installation Review John J. LeRose 2/25/2009.
Six modules Micromegas TPC beam test & Test bench 12/4/2012W.Wang_RD51 mini week1 D. Attié, P. Colas, M. Dixit, P. Hayman, W. Wang.
PSD upgrade: concept and plans - Why the PSD upgrade is necessary? - Concept of the PSD temperature stabilization and control - Upgrade of HV control system.
Strip-scintillator/Si avalanche photo-diode Muon System Fermilab Test beam + Inst INFN Udine APDs Notre Dame Scint /WLS Baseline: Resistive Plate Chambers.
Paolo Rumerio, CERN On behalf of the CMS Electromagnetic Calorimeter Group CALOR 2006 Chicago, June 5 th – 9 th, 2006 Commissioning of the CMS Electromagnetic.
D. Attié, P. Colas, E. Delagnes, M. Riallot M. Dixit, J.-P. Martin, S. Bhattacharya, S. Mukhopadhyay Linear Collider Power Distribution & Pulsing Workshop.
1 ATF2 Q-BPM Magnet Movers & 1 st Pulse Calibration Progress from May 7-11 J. May, D. McCormick, T.Smith (SLAC) S. Boogert (RH)
CDMS II Shielding To Installation To Construction From Design.
Sergey BarsukElectromagnetic Calorimeter for 1 Electromagnetic Calorimeter for the LHCb experiment Perugia, Italy March 29 – April 2, 2004 ECAL CALO Sergey.
Status of NEWCHOD E.Guschin (INR), S.Kholodenko (IHEP), Yu.Kudenko (INR), I.Mannelli (Pisa), O.Mineev (INR), V.Obraztsov (IHEP), V.Semenov(IHEP), V.Sugonyaev.
FEE for Muon System (Range System) Status & Plans G.Alexeev on behalf of Dubna group Turin, 16 June, 2009.
Future Beam Test Plans of the Calorimeter Group Aug 学術創成会議 Satoru Uozumi (Shinshu) for the GLD calorimeter group We are planning to have two beam.
R. Michaels, JLab PREX Mtg, July 2008 Recent Cavity Monitor Tests Credit: John Musson, Anna Boehle, Vince Sulkosky Good position & current for 10 nA to.
The ALICE Electromagnetic Calorimeter
The dynamic range extension system for the LHAASO-WCDA experiment
The PSD at Pb-Pb run PSD drawbacks at Ar beam
Light mixer proposal Arjan Heering, Anton Karneyeu
Atlas: Upgrade Phase I Massimo Della Pietra.
Viewport 1, Sep. 26, 2007 Temperature (ºC) on HPU display Primary : 72
New pre study The setup results.
Power pulsing of AFTER in magnetic field
Design of the He and HB ODU
CERN SPS and PS Tests 2007 Goals: Show we have a working EMCal system
ILC Detector Activities in Korea
EMC Barrel Electronics Status
ScECAL+AHCAL+TCMT Combined Beam FNAL
Gamma-ray Large Area Space Telescope
Collaboration between Hall C and Hall D
Presentation transcript:

Prototype Mechanical / optical considerations 1.Current LED system performance 2.New APD / Fiber /Strong Back integration scheme

LED Calibration and Monitoring System

Optical router for 12 LED pulses for the 12 Modules in a strip module

Module gain monitoring signal compared to cosmic ray peak

Recent Improvements: Last measurement of LED signal from the tower with 0.5 mm fibers corresponds to ~4 GeV electrons For the test beam prototype, increase diameter of secondary fibers up to 0.75 mm and use a jacketed fibers to increase optical isolation. Estimated improvement ~2 times. New LED board up a signal ~2 times. (Hans Schedule ??) Goal is to have LED system capable of ~ 16 GeV pulses

New APD/Fiber/Strong Back integration scheme.

Old APD/Fiber/Strong Back integration scheme.

Three proposed variants of new APD/Fiber integration scheme. Deeper cavity variant adopted Leaf spring

New integration Scheme Adopted for test beam

New integration Scheme Adopted for test beam