Zack Wolf BFW Fiducialization October 20, 2005 1 Beam Finder Wire (BFW) Fiducialization Zack Wolf, Dean Walters, James.

Slides:



Advertisements
Similar presentations
Abstract Mechanical Inspection and Survey Steven Seiler, NSLS-II Project The Survey and Alignment Group is often the first and last to work with the Storage.
Advertisements

Deviations from fiducial locations are unacceptable in areas despite high accuracy at alignment points.
Rodd Pope, SLAC Undulator System October 12-13, 2006 FAC Meeting 1 Undulator System Assembly Plans Rodd Pope, SLAC.
Alignment of DB and MB quadrupoles Hélène MAINAUD DURAND 17/11/2011 With a lot of input from Sylvain GRIFFET.
Multipole Girders - Alignment & Stability (Multipole Girder Alignment technology & R&D) S. Sharma ASD: J. Skaritka, D. Hseuh, V. Ravindranath, G. Miglionico,
XFD – XF Engineering Group November 15-th, 2004LCLS Undulator Final Design Review1 Undulator for the LCLS project - design of the support and mover system.
Heinz-Dieter Nuhn, SLAC / LCLS Undulator Checkout and Startup Plans November 12, Undulator Checkout and Startup Plans Heinz-Dieter.
FAC review, 10/27 D. Schultz 1 e-Beams System Update Injector System Installation has started. Linac System Preparing for ’06 installation. Controls System.
October 12, 2006 Heinz-Dieter Nuhn, SLAC / LCLS Undulator Good Field Region and Tuning Strategy 1 Undulator Good Field Region and.
Apr. 16, 2007 Undulator Breakout Dean R. Walters 1 Vacuum System Undulator Vacuum System Dean R. Walters Soon-Hong Lee, James Bailey, James.
Undulator Alignment Strategy – April 20, 2006 Heinz-Dieter Nuhn, SLAC / LCLS FAC 1 Undulator Alignment Strategy Heinz-Dieter Nuhn,
Zachary Wolf Undulator Tuning June 17, 2008 Undulator Tuning Status Z. Wolf, S. Anderson, R. Colon, S. Jansson, S.Kaplunenko,
Tagger and Vacuum Chamber Assembly Procedure. Preassembly of second bottom yokes and poleshoes. a) Install special support. b) Place the second bottom.
Venkat Srinivasan FAC: BFW Test Update 06/17/ Facility Advisory Committee BFW Calibration Test Results on behalf of: Jim.
LCLS Undulators October 14, 2004 Heinz-Dieter Nuhn, SLAC / SSRL MMF Review Introduction to the LCLS Undulators Heinz-Dieter Nuhn,
Geoff Pile FAC Review - Undulator 17 June 2008 LCLS Undulator System Status and Schedule Geoff Pile.
Yurii Levashov Undula t or fiducialization test Oct. 14, 2004 Undulator Fiducialization Test Results Fiducialization Tolerances.
Zack Wolf Quadrupole Fiducialization October 20, A Vibrating Wire System For Quadrupole Fiducialization Zack Wolf,
October 20-21, 2005 Internal LCLS Undulator Alignment and Motion Review Catherine LeCocq, SLAC 1 Undulator Alignment Concept &
Linac Coherent Light Source Stanford Synchrotron Radiation Laboratory Stanford Linear Accelerator Center LCLS Undulator Systems.
Yurii Levashov LCLS Undulator Fiducialization October 20, 2005 *Work supported in part by DOE Contract DE-AC02-76SF LCLS.
Physics Requirements – October 20, 2005 Heinz-Dieter Nuhn, SLAC / LCLS Internal LCLS Undulator Alignment and Motion Review 1 Physics.
October 30, 2007 Heinz-Dieter Nuhn, SLAC / LCLS Undulator Physics Issues 1 Undulator Physics Issues Heinz-Dieter Nuhn, SLAC / LCLS.
Robert Ruland Installation Alignment -Magnetic Measurements – Fiducialization April 7-8, 2005 FAC Meeting 1 Installation Alignment,
TAGGER MAGNET DESIGN Presented by Tim Whitlatch Hall D Tagger Magnet Design Review July 10,
Robert Ruland MMF Introduction, Schedule, Budget October 14, 2004 MMF Review 1 MMF Introduction, Schedule, Budget Robert Ruland.
Stephen Milton Undulator System 20 April, 2006 LCLS Undulator System Update S. Milton, ANL FAC, April 20 th, 2006.
Rodd Pope, SLAC Undulator System April 20-21, 2006 FAC Meeting 1 Undulator System Assembly Plans Rodd Pope, SLAC In collaboration.
1 Heinz-Dieter Nuhn 1 BFW Results June 2009 FAC BFW Results Heinz-Dieter Nuhn – LCLS Undulator Group Leader June 9, 2009.
Linac Coherent Light Source Stanford Synchrotron Radiation Laboratory Stanford Linear Accelerator Center LCLS Undulator Physics.
Robert Ruland Intra Girder Assembly and Alignment - October 20, 2005 Internal LCLS Undulator Alignment and Motion Review 1 Intra.
Robert Ruland MMF Layout, Workflow October 14, 2004 MMF Review 1 MMF Layout, Workflow Robert Ruland Magnetic Measurements Facility.
D Walters Undulator System June 17, Undulator System Components Status Dean Walters.
Zachary Wolf LCLS Undulator October 30, LCLS Undulator Tuning And Fiducialization Zack Wolf, Yurii Levashov, Achim.
Geoff Pile LCLS Und. System Fabrication FAC 29 th, 30 th & 31 st October 2007 LCLS Undulator System Fabrication Schedule FAC.
LINAC LASER NOTCHER READINESS REVIEW August 5 th, 2014 Kevin Duel – Mechanical Support Engineer.
1/9 Hélène Mainaud Durand Sylvain GRIFFET, 28/11/2011 BE/ABP-SU/ Adjustment of 4 Drive Beam Quads positions on TM0 CLIC girders EDMS Document No
Zachary Wolf Undulator Oct 12, LCLS Undulator Tuning Zack Wolf, Yurii Levashov, Achim Weidemann, Seva Kaplounenko,
DELTA Quadrant Tuning Y. Levashov, E. Reese. 2 Tolerances for prototype quadrant tuning Magnet center deviations from a nominal center line < ± 50  m.
Alignment and assembling of the cryomodule Yun He, James Sears, Matthias Liepe MLC external review October 03, 2012.
Undulator Orientation & Electron Beam Spacing Should the undulator frames be toward the central aisle or the tunnel walls? What is the optimum spacing.
Argonne National Laboratory is managed by The University of Chicago for the U.S. Department of Energy LCLS Girder Support Concept Design Sushil Sharma.
SCU Segmented Cryostat Concept M. Leitner, S. Prestemon, D. Arbelaez, S. Myers September 2 nd, 2014.
Marion M. White Undulator System 27 October FAC LCLSLCLSLCLSLCLS Progress on the Undulator Module System Test Marion M.
HPS Collaboration Meeting JLAB, May Tracker Design Status M.Oriunno, SLAC.
BEPCII Prealignment Installation Survey and Alignment Accelerator Center of IHEP Xiaolong Wang
Alice overview New detector and chamber ALICE TC.
D Walters Undulator Systems – BFW April 30, 2008 Production Status of the Quad Spool J Morgan – Engineer Bellows Module Soon-Hong.
1.Placement of support base for 70 degree-dipole magnet(D) ・ Support base for 70 degree-dipole magnet(D) should be placed horizontally with a spirit level,
Fiducialisation and initial alignment of components for CLIC Mateusz Sosin on behalf of the CLIC active pre-alignment team CLIC Workshop 2015.
Feb. 20, 2006 Diagnostics-Vacuum Overview Dean R. Walters 1 LCLS Undulator Diagnostics and Vacuum System Overview Dean R. Walters.
October 27-28, 2005 FAC Meeting Undulator Metrology Catherine LeCocq, SLAC 1 Undulator Metrology Catherine LeCocq, SLAC October.
Clive Field, Reggie Rogers, Venkat Srinivasan Undulator Week: BFW Card Status Update 01/23/ BFW Card - Physics Requirements.
ESS DTL: Prototyping M.Comunian - F. Grespan – P. Mereu Lund– 10/04/2013F.Grespan.
Clive Field, Venkat Srinivasan Undulator Week: BFW Card Status Update 04/30/ BFW Card Status on behalf of: Keith Caban.
Jan , 2008 LCLS Undulator Week Dean R. Walters 1 Vacuum Components Undulator System SH Lee, J Morgan, and D Walters.
Four OTRs for ATF2 OTR History Current OTR setup New OTR design.
Tutorial On Fiducialization Of Accelerator Magnets And Undulators
SLAWG #15 ZS fiducialisation and alignment today
Magnetic Measurements For The LCLS Undulator System
LCLS Undulator Fiducialization
SHMS Downstream Beamline Large SHMS/HMS Angles (Config-1)
Beam Finder Wire Assembly Undulator System
Cryomodule Assembly Plan
Undulator System Components Status Dean Walters
Magnetic Measurements and Alignment at SLAC Robert Ruland & Zack Wolf
Undulator Tuning Status Heinz-Dieter Nuhn, SLAC / LCLS for Zack Wolf, Yurii Levashov, Achim Weidemann, Seva Kaplounenko, Scott Jansson, Ralph Colon, Dave.
LCLS Undulator System Status and Schedule
LCLS Undulator System Status and Schedule
Beam Finder Wire (BFW) Status
Presentation transcript:

Zack Wolf BFW Fiducialization October 20, Beam Finder Wire (BFW) Fiducialization Zack Wolf, Dean Walters, James Bailey, Eric Lundahl

Zack Wolf BFW Fiducialization October 20, Need For A BFW The undulator will not steer the beam. It will just radiate at the wrong wavelength. The BFW allows this to be detected.

Zack Wolf BFW Fiducialization October 20, BFW Specifications LCLS PRD

Zack Wolf BFW Fiducialization October 20, BFW Operation Out: The beam goes through a small beampipe making a smooth transition to external beampipes In: Wires are inserted into the beamline. The whole girder is moved to scan the wires across the beam.

Zack Wolf BFW Fiducialization October 20, BFW Use Either turn quad off, or use wire system to re-center on beam

Zack Wolf BFW Fiducialization October 20, Fiducialization Accuracy Requirements 1)Locate wire relative to local fiducials (optically): 25 um 2) Locate local fiducials relative to outside tooling balls (CMM): 15 um 3) Repeatability of positioning wires: 80 um in X, 30 um in Y Rough Error budget: LCLS PRD

Zack Wolf BFW Fiducialization October 20, Fiducializing the Beam Finder Wire Dean Walters, James Bailey,

Zack Wolf BFW Fiducialization October 20, Cases to Consider Fiducialization Case 1 - Initial installation of the BFW Below is the outline of the Initial Installation followed by the outline of the Replacement of the BFW Case 2 - Replacement of the BFW The replacement of the BFW is the more difficult case Since the case of replacement is constrained access-wise, careful placement of fiducials and the BFW/Vacuum Chamber is important.

Zack Wolf BFW Fiducialization October 20, Case 1 - Initial Fiducializing of the BFW Step 1 - Wire to BFW Frame Fiducials External Moving Fiducials (EMF) Wire External Stationary Fiducials (ESF) Beam Guide BFW Alignment Stand On the BFW Alignment Stand the position of each wire can be measured WRT the EMF Measure the Beam Guide WRT the EMF With the BFW actuated in each (up & down) position, adjust the stops for each position from the EMF to ESF per nominal dimensions. BFW Frame

Zack Wolf BFW Fiducialization October 20, Bolt BFW Frame to Vacuum Chamber and make vacuum seal. Adjust the lower stops to place the Beam Guide in the center of the Chamber ports. Then measure the EMF WRT to CSF Adjust the upper stops to correctly place the wires WRT the Girder Axis (GA) Then measure the EMF WRT to CSF Step 2 - BFW Frame to vacuum Chamber Alignment Chamber Stationary Fiducials (CSF) BFW Chamber Alignment Stand Case 1 - Initial Fiducializing of the BFW

Zack Wolf BFW Fiducialization October 20, The BFW Chamber along with the BFW is placed in the beam line. Adjust the Chamber supports to place the upstream port in line with the Undulator Vacuum chamber. The mating flanges will have the ability to self center to each other. Make up the vacuum flange seal. There will be the ability to make fine position adjustments after the seal is made. Re-measure the placement of the Chamber CSF and the EMF WRT to the GA Case 1 - Initial Fiducializing of the BFW Step 3 - Alignment of BFW/Vacuum Chamber to Undulator Vacuum Chamber

Zack Wolf BFW Fiducialization October 20, Assumptions for replacement of the BFW. a)The existing BFW was aligned b)The BFW/Vacuum Pump chamber stays in place in the beam line c)The BFW/Vacuum Pump Chamber is supported so that when the BFW is removed that it remains accurately in place Beam Finder Wire BFW/Vacuum Pump Chamber Case 2 - Replacement of the BFW

Zack Wolf BFW Fiducialization October 20, Step 1 – This is the same as Step 1 of the Initial Fiducialization Step 2 - In the case of replacement the data from Step 2 in the initial case will be used with the new BFW frame. Step 3 – This is different than the other Step 3 in that the stops will be adjusted in the field using the preexisting data. This will be more difficult since some lines-of-sight will be blocked due to existing installed equipment. Access to adjustments will also be more awkward in the field then in Case 1 where the adjustments will be made in the lab. The new installed assembly will be measured in both positions after all adjustments have been made to record the final placement. Case 2 - Replacement of the BFW

Zack Wolf BFW Fiducialization October 20, How Fiducialization Is Really Done Eric Lundahl

Zack Wolf BFW Fiducialization October 20, Optically Find Wires WRT Local Fiducials

Zack Wolf BFW Fiducialization October 20, Locate Tooling Balls With CMM

Zack Wolf BFW Fiducialization October 20, Previous SLAC Experience