Stefan Moeller XES Plan for FAC Review - April 20, 2006 X-Ray Endstation Systems (XES) Status and Plan for FY06 Stefan Moeller.

Slides:



Advertisements
Similar presentations
Richard M. Boyce FAC Review – Accelerator Installation October 29-31, Installation – Accelerator Systems Installation Planning.
Advertisements

LCLS Transition to Science DOE Status Review of the LUSI MIE Project LCLS NEH ARR John Arthur LCLS Experimental Facilities Division August 11, 2009 Welcome.
John Arthur X-ray October 12, 2004 X-Ray Detector Program Status John Arthur.
Hal Tompkins FEE/FEL June 16, FEE/FEL Commissioning Overview By Hal Tompkins Photon Beam Systems Deputy.
FAC, 4/20/06 D. Schultz 1 e-Beams System Update Linac System Preparing for downtime installation. Injector System Installation has started. Undulator System.
1 John Arthur 1 FEH Status CXI Review June 3, 2009 FEH Layout, Status John Arthur – LCLS Expt’l Facilities Div June 3, 2009.
Stefan Moeller XES FAC Review – April 16, 2006 X-Ray Endstation Systems (XES) Status Stefan Moeller.
John N. Galayda LCLS Facility Advisory November 11, LCLS Update November 11, 2008 Construction Status LCLS Instruments.
Kathleen Ratcliffe LTU Installation October 30, LTU Installation Coordination Kathleen Ratcliffe.
John Arthur X-ray November 11, 2008 SLAC National Accelerator Laboratory 1 X-ray Overview LCLS Directorate structure.
Richard M. Bionta XTOD October 12, 2004 UCRL-PRES-XXXXX X Ray Transport, Optics, and Diagnostics, Overview Facility Advisory Committee.
John N. Galayda LCLS FAC 20 April Linac Coherent Light Source Overview and Charge Facility Advisory Committee John.
Stefan Moeller Revised XES April 7, 2005 Revised X-Ray Endstation Scope Stefan Moeller.
John Arthur X-ray June 17, X-ray Overview XTOD current status XES current status Schedule to first experiments.
Diffraction studies of stimulated dynamics (pump-probe) Coherent-scattering studies of nanoscale fluctuations Atomic, molecular and optical science High.
1 Stefan Moeller 1 AMO Instrument Schedule ARR AMO Instrument Schedule Stefan Moeller – XES Manager June 30, 2009.
Mark Reichanadter LCLS FAC April 20-21, 2006 Meeting of the LCLS Facilities Advisory Committee LCLS Project Management M.
John Arthur Photon Systems April 16, LCLS Photon Systems Status Technical status and accomplishments Response to.
John Arthur Photon October 18, 2005 LCLS Photon Systems Status John Arthur SLAC.
John Arthur Photon October 29, Photon Systems Update FAC recommendations Current status New plan for Photon Systems.
Jess Albino Facility Advisory October 29, 2007 FACILITY ADVISORY COMMITTEE PLENARY CONVENTIONAL FACILITIES UPDATE October.
John Arthur Photon October 27, Photon Systems Overview John Arthur SLAC.
M. Reichanadter LCLS Project June 2008 FAC Meeting Report to the LCLS Facilities Advisory Committee Project Management.
LCLS Transition to Science DOE Status Review of the LUSI MIE Project NEH status and XFD operations Hal Tompkins, John Arthur LCLS Experimental Facilities.
John N. Galayda LCLS FAC October Linac Coherent Light Source Overview and Charge Facility Advisory Committee.
John Arthur Photon April 20, 2006 Photon Systems Update John Arthur SLAC Photon Systems Manager.
1 Michael Rowen 1 SXR Instrument FAC SXR Instrument Michael Rowen – Engineering Physicist June 9, 2009.
John N. Galayda LCLS Facility Advisory 29 October 2007 Linac Coherent Light Source Overview 29 October 2007  Project.
John Arthur X-Ray Endstation April 29, 2004 X-Ray Endstations Overview John Arthur.
John Arthur X-ray April 7, 2005 LCLS Detector Development Plans John Arthur.
Hamid Shoaee LCLS FAC Controls June 17, LCLS Control System Personnel Linac & BC2 Controls progress LTU, Dump Controls.
Stefan Moeller X-Ray October 27, X-Ray Detectors Stefan Moeller.
Bill White Laser Installation and April 20, Laser Installation and Commissioning April 20, 2006 Procedures.
John Arthur PIXEL Project April 7, 2005 Status of the Proposed PIXEL Project John Arthur SSRL/SLAC Photon Instrumentation.
John Arthur X-ray April 20, 2006 X-Ray Beamline and Experiment Layout John Arthur LCLS Photon Systems Manager.
Hamid Shoaee LCLS FAC Review – October Control System Overview Hamid Shoaee Controls System Manager Injector control system commissioning & Support.
John Arthur Photon October 12, Photon Systems Update John Arthur SLAC 1.
Hal Tompkins Photon October 30, LCLS Photon Systems Installation and Commissioning Presentation to Facility Advisory.
Hamid Shoaee LCLS Control April 20, 2006 LCLS Control System Organization & Integration with the rest of the lab, Accelerator.
John Arthur Photon Systems April 7, 2005 Photon Systems Overview John Arthur.
Hamid Shoaee Accelerator Readiness Dec. 2, ‘08 SLAC National Accelerator Laboratory Controls Department LCLS Maintenance.
Hamid Shoaee LCLS Control April 20, 2006 LCLS Control System Controls Organization Overview A Progress Report Hamid Shoaee.
NEH ARR PPS 11AUG09 LCLS NEH Hutch Protection System E. Michael Saleski; QC Manager Michael G. Harms, Patrick Bong, James Murphy, Alan Hill; Engineers.
Keith O. Hodgson SSRL Director Brief Update on the Linac Coherent Light Source - LCLS February 26, 2002 Basic Energy Sciences Advisory Committee Undulator.
David Schultz Accelerator Readiness Dec. 2, ‘08 SLAC National Accelerator Laboratory 1 Undulator Complex Status LCLS Introduction.
John Arthur LUSI DOE Review August 19, 2008 Transition to Operations p. 1 From construction project to operating facility Structure.
M. Reichanadter LCLS Project November 2008 FAC Meeting Slac National Accelerator Laboratory Report to the LCLS.
Mark Reichanadter LCLS FAC October 12-13, 2006 Report to the LCLS Facilities Advisory Committee LCLS Project Management.
John N. Galayda LCLS Accelerator Readiness December 2, LCLS Overview December 2, 2008 Project Construction Status.
DOE Stanford Site Office Office of Science U.S. Department of Energy 1 U.S. Department of Energy’s Office of Science Office of Science Review of the LCLS.
LUSI Coordination with LCLS
Experimental Facilities Planning
LCLS Ultrafast Science Instruments
Stefan Moeller – XES Manager May 14, 2009
John N. Galayda – Director of LCLS Construction March 30, 2009
X-Ray Endstation Design & Management/Commissioning
X-Ray Endstations Update
Project Management Issues John N. Galayda, SLAC April 24, 2002
Endstation Systems, Installation Costs and Schedule J. Hastings
Experimental Program and Endstations System (WBS ) J
John Arthur – LCLS Experimental Operations
NEH - Status Stefan Moeller.
The Transition to User Operations
PIXEL Project Status John Arthur Photon Instrumentation for
X-Ray Endstation Design & Management/Commissioning
X-Ray Endstation Systems (XES) 2006 Schedule
Control System Overview Hamid Shoaee LCLS Control System Manager
LCLS Instrument MIE Project: Staffing, Schedule
LCLS Photon Systems Overview
LUSI Controls and Data Systems W.B.S. 1.6
Presentation transcript:

Stefan Moeller XES Plan for FAC Review - April 20, 2006 X-Ray Endstation Systems (XES) Status and Plan for FY06 Stefan Moeller

XES Plan for FAC Review - April 20, 2006 Outline Scope Layout Milestones Status Plan for FY06 Summary

Stefan Moeller XES Plan for FAC Review - April 20, 2006 Scope and Goals The X-Ray Endstation Systems (XES) group will create the infrastructure required for experimenters to make best scientific use of the LCLS radiation safely XES will equip a complete instrument for Atomic Physics Experiments Coordinate all safety related aspects for the user environment and the experiments

Stefan Moeller XES Plan for FAC Review - April 20, 2006 Endstation Systems Location and Layout FEE, NEH, XR Tunnel, FEH: Controls, Cabling, Network, PPS, MPS NEH: AMO Instrument, Beam-line Controls, Laser, Mech./Vacuum 646 ft XR Tunnel FEH FEE NEH

Stefan Moeller XES Plan for FAC Review - April 20, 2006 Recent Changes: Reorganization: LCLS Controls owns controls effort in each WBS (includes Technical, Cost and Schedule) Hamid Shoaee is Control Account manager of XES Controls (WBS 1.6.2): Network, Beamline Controls, PPS, MPS Scope: Reduced Streak Camera, Imaging and Intensity Detector Added (May 06): Undulator diagnostic (FEE)

Stefan Moeller XES Plan for FAC Review - April 20, 2006 Photon System Manager J. Arthur H. Tompkins LCLS 1.5 X-Ray Transport &Diagnostics R. Bionta (LLNL) 1.6 Endstation Systems S. Moeller Science Advice J. Hastings Project Planning J. Doubrava Laser Systems Bill White

Stefan Moeller XES Plan for FAC Review - April 20, 2006 LCLS XES Lasers Bill White +2 people Detectors Niels van Bakel Atomic Physics (incl. Mech. and Vacuum) John Bozek +3 engineers Controls Hamid Shoaee Bob Dalesio Mike Saleski (PPS) +7 people Installation Hal Tompkins +Inst Team

Stefan Moeller XES Plan for FAC Review - April 20, 2006 XES L3 Milestones Level 3 FY05 Complete 2D Detector Statement of Work Award Initial R&D Funding for 2D Detector FY06 Hire Atomic Physicist Hire Detector Physicist Design Review #1 for 2D Detector Specification for Streak Camera FY07 Design Review #2 for 2D Detector CT: Network Final Design Review CT: Beamline Control Final Design Review Laser Final Design Review Order Lasers FY08 Start Installation in FEH Laser Operating in NEH CT: Complete Beamline Controls Complete Mech./Vacuum Installation CT: Complete Network and Cabling Complete Acceptance Tests of Detectors Complete Installation in NEH First Atomic Physics Experiment

Stefan Moeller XES Plan for FAC Review - April 20, 2006 Status and Plan for FY06 - Detectors Detector Physicist hired: Niels van Bakel (2/06) LDAC Review #2 for FY05 (Feb , 2006) Next Review (#3) in July 06 Cornell 2 D Detector On schedule Design and layout for 2nd submission in May Mayor Review planned for end of 06 Start Streak Camera developing specs, requirements with users defining contract with LBL

Stefan Moeller XES Plan for FAC Review - April 20, 2006 Status and Plan for FY06 - AMO Atomic Physicist hired: John Bozek (1/06) Coordinating with AMOS science group Defining experimental program and requirements of AMOS station Starting with specs, design AMOS Instrument Coordination with LCLS Controls on beamline controls

Stefan Moeller XES Plan for FAC Review - April 20, 2006 Status and Plan for FY06 – Controls (Responsibility of LCLS Controls) PPS Engineer hired: Mike Saleski (1/06) Started PPS, BCS specs Contracted FY06 controls tasks: Bob Dalesio (3/06) Coordinate with LCLS Controls Develop layout of XES Controls architecture Specification XES Network Specification XES Beamline Control

Stefan Moeller XES Plan for FAC Review - April 20, 2006 Tasks for FY06 Now ongoing: Developing detailed schedule for XES Coordinate XES Controls requirements with LCLS Controls Identifying resource needs (PPS, MPS, Beamline Control Engineer, Network) Design PPS, MPS (7/06) Start Specification Network (7/06) Start Specification Beamline Control (7/06) User safeguards (7/06) Coordinate with Laser Systems Laser Engineer, Laser PPS (7/06) Start Design AMO Instrument (6/06)

Stefan Moeller XES Plan for FAC Review - April 20, 2006 Summary XES is staffing up according to plan Atomic Physicist, Detector Physicist on board Start detailed design of AMOS Instrument Continue 2D Detector program with Cornell Coordinate with AMOS working group and LUSI Coordinate with LCLS Laser group Develop Installation and Commissioning Plan Coordinate with LCLS Controls: Hired PPS Manager (LCLS wide) Hired Controls Engineer, (Network, Beamline Controls) Start with Controls design (PPS, Network)