CS Brick connection at Nagoya O.Sato

Slides:



Advertisements
Similar presentations
1 Status report of the PEANUT analysis Giovanni De Lellis Collaboration Meeting, June 5th 2007, Maiori.
Advertisements

PEANUT Nagoya 2006/12/08 M. Komatsu. Scanning trials Feb : BL039,040,041,050,052,060 –PL1 and 2 scanned with S-UTS prototype. –SFT matching.
Track ranking in CS analysis T. Fukuda 20/Jan ‘09 OPERA–JAPAN (Mizunami) meeting.
Π 0 search N.Kitagawa Flab Nagoya University OPERA Emulsion Workshop 2008/01/22-23.
SUTS data taking and processing K.Morishima. Introduction to Morishima ・ Refresh ・ Development of Plate Changer ・ Development of Dry lens scanning ・ Development.
Slides for the discussion Cosmic ray density. Cosmic ray density. Cosmic ray is  useful for the alignment between plates. Decay search Momentum measurement.
SUTS Data taking and processing with Monitoring K. Morishima Flab Nagoya Univ. OPERA Emulsion Workshop 2008/01/22-23.
Emulsion scanning: present status and plans for the coming run Giovanni De Lellis.
Vertex location status of Japan Nagoya vertex hunting team Y.Nonoyama, K.Hamada, S.Takahashi, H.Kubota, R.Komatani 2009 Jan 22 OPERA Japan Meeting.
Support to the event location in CS Scanning Station Fabio Pupilli LNGS Scanning Team OPERA Collaboration Meeting 20/01/2009 MIZUNAMI.
WG-3 summary CS scanning. People O.SatoNagoya Y.NonoyamaNagoya S.MiyamotoNagoya J.YoshidaNagoya T.FukudaNagoya T.NakanoNagoya S.AokiKobe Luigi Salvatore.
Performance of Compton Alignment in OPERA CS, 2008 run Seigo Miyamoto Jan., 2009, MIZUNAMI.
OPERA experiment T.Toshito (Nagoya univ. Japan) for the OPERA collaboration Apr
Volume Scan 福田 努 (Tsutomu Fukuda) Nagoya-univ.. Event Brick#CC/NC Stop Plate CC PL CC PL NC PL
OPERA brick (16215) scanning results Luisa Arrabito on behalf of Lyon Scanning Group Emulsion Workshop Nagoya 22th-23th January 2008.
Cristiano Bozza – European Emulsion Scanning Group – Nagoya Jan OPERA brick scanning by the European Scanning System.
Automatic Track Follow Program A program to trace a given set of tracks automatically –Event location for PEANUT and OPERA –DONUT “not-located” events.
CSd analysis Natalia for the European CS Scanning Team.
NetScan for BL118 PEANUT Fermilab 22-23/Jan/2007.
Stack to Stack connection O.Sato. Motivation Emulsion coordinate aligned to TT coordinate by Komatsu :: CTransEmulToTT(*); Emulsion tracks.
CS Distortion Kazuyama Yoshioka. Scanning Samples Realistic CS film x 10  2 nd refresh from ’06 July (include Aug. run TTCS)  Some are installed to.
Status and activities in Salerno Cristiano Bozza Salerno Emulsion Group Nagoya Dec 2006.
Electron identification and shower analysis in ECC T.Toshito (Nagoya Univ.) 8.Mar.2002
CS LNGS Current status and perspectives.
Application of the Beta-ray alignment for the OPERA CSDs Seigo Miyamoto.
Edge Scanning: new plate design for the European Scanning System G. Sirri for Bologna group.
PEANUT Brick Scanning for NETSCAN by S-UTS Kunihiro Morishima F-Lab Nagoya University BL118 Peanut Fermi Lab 2007/01/22-23.
Regina Rescigno, Cristiano Bozza – Salerno Emulsion Group – Apr Scanning Report from Salerno Brick scanning overview Pending Events An Interesting.
I. Kreslo, LHEP, Bern Bern Scanning Laboratory Hunting muonless interactions...
Location in CSD of electronic detector reconstructed events Scanning results from LNGS scanning lab N. D’Ambrosio, N. Di Marco, L.S. Esposito, P. Monacelli.
Summary of the event location in Europe Giovanni De Lellis.
E-pair Search in CSD Tsutomu Fukuda Nagoya-univ..
Film Storage and book-keeping Scanning Quality Control Cosmic Ray Density Vertex Confirmation Vertex Location WG4 summary.
CS Scan report at Nagoya Film samples August run Rock muon events Comic ray events October run Rock muon events 1 event (1 Brick) Cosmic.
NC like event location 9 th /Dec/2006 OPERA Emulsion Work Shop T. Fukuda, K. Morishima, N. Nagoya univ.
Time stamping for Emulsion Tracks with Gyaku Data Base method Y.Nonoyama.
Support to the event location in CS Scanning Station Fabio Pupilli LNGS Scanning Team OPERA Collaboration Meeting 02/04/2009 ANKARA.
CS LNGS Current status and perspectives Luigi Esposito (European CS Scanning Team)
BL007, BL039 and BL040 PL01-PL02 Scanning Result K. Narita Nagoya University Dec PEANUT meeting.
Neutrino Event location Connection from Electric Detector to Emulsion Detector Tsutomu FUKUDA Fundamental Particle Physics Lab, Nagoya-univ 9th March,
CS general status on behalf of JAPAN CS Analysis task force team T.Fukuda, S.Miyamoto, Y.Sakatani, Y.Taira 2nd April, OPERA Collaboration
Umut Kose Neutrino interaction location in the OPERA Experiment New Development of Flavor Physics, , Tennomaru, Gamagori Nagoya University.
1 Status of Located Event Analysis On behalf of Nagoya Scanning Group Umut KOSE OPERA Emulsion Workshop, January 2008, Nagoya, JAPAN.
Jean Favier OPERA Meeting Ankara 3/04/09 1 Some ECC features studied with GenIma Efficiency with no fog Efficiencies with fog Micro-track number versus.
CS Edge part Distortion analysis T.Yoshioka M.Kazuyama.
Tomokazu Matsuo TOHO University.M2 Experience: CS Production in Gran Sasso CS Scan, Manual check ECC Vertex analysis Main works: Make plate changer #2.
CS to brick and track follow-up ● Cosmic ray test ● CS scanning ● CS to brick connection ● Track following Napoli Scanning Lab.
Research History of Tsutomu FUKUDA Tono-Refresh facility Facility construction Mass production shift leader Refreshing control Sensitivity.
CSd scanning report from LNGS Nagoya OPERA workshop January 22 nd, 2008.
Status of the OPERA experiment Yoshiaki Nonoyama Nagoya Univ.
BOLOGNA Scanning Lab INFN - Sezione di BOLOGNA Physics Dep. of Alma Mater Studiorum Università di Bologna M.Pozzato – Ankara – 09/04/02.
LNGS Scanning Station Nicola D’Ambrosio (LNGS group) Maiori, 4-6 June 2007.
1 RUN 2008 OPERA events: Status Report M. Ieva on behalf of Bari Emulsion Lab OPERA Collaboration Meeting, April 1st - 5th, 2009.
Bologna Report M. Pozzato on behalf of Bologna Group Cetara Meeting – 13/09/2010.
DE/dX measurement by OPERA film Tsutomu Fukuda (Nagoya Univ) Emulsion work shop (11/12,2005)
OPERA Emulsion Workshop – Nagoya, 7-9 Dec From CS to Brick: first results from low density cosmic ray exposure at LNGS M. De Serio from Bari emulsion.
Emulsion Development Activity C.Sirignano Opera CM - Mizunami - 20/01/2009.
Event location and decay search in Switzerland Swiss group.
OPERA Physics Coordination, CERN, 03/05/2006 Effect of  and  radiation on the on-line emulsion scanning M. Cozzi for the Bologna group.
European Scanning System: status report. DRY Fill factor 92.4 ± 1.6 % DB-driven Scan-back and Total Scan in Bari OIL Fill factor 93.1 ± 1.2 % Brick #8,
Event Location Rehearsal in PEANUT Bricks OPERA collaboration meeting Gran Sasso, May 2006 Kodama, Sato, Fukuda, Komatsu, Narita, Nonoyama NAGOYA.
The Detector Performance Study for the Barrel Section of the ATLAS Semiconductor Tracker (SCT) with Cosmic Rays Yoshikazu Nagai (Univ. of Tsukuba) For.
G.Sirri – INFN Bologna LNGS /19 Status Report of the Bologna Scanning Lab Bologna Scanning Lab Last activities in the Bologna scanning lab.
MuID Twopack Efficiencies: Measurements with Cosmic Rays & High Voltage inforamtion.
Emulsion Test Beam first results Annarita Buonaura, Valeri Tioukov On behalf of Napoli emulsion group This activity was supported by AIDA2020.
The Status of the OPERA experiment II
Edge Scanning: new plate design for the European Scanning System
Status of the OPERA experiment
Pure  exposure for e/ separation
Bari emulsion lab: status report
Presentation transcript:

CS Brick connection at Nagoya O.Sato

Sample October run Cosmic ray (4 min.) 3 Bricks Brick ID CSD FD(Chiara) ECC FD(Chiara) # /(10um)** /(10um)**3 # # ECC films is first shipment. k

Scanning Area/Condition of CSD SUTS scanned 8 x 7 cm2 Angle [-0.5,0.5] for X,Y 50 to 100 micro tracks / (100 um)**2

CSD track pick up condition Making Base tracks under tolerance (micro track angle – Base track angle) < 0.07 for each projection. Shrinkage 15% error is accepted So.. dax < *ax_base day < *ax_base Coincidence CS1 base track & CS2 base track -Allowance of CS1 & CS2 difference of base angles < difference of base track surface <50 um (each proj.) -Some lose Pulse height cut

CSD track picked up track |  proj  |  proj  d<20um manuacl check on CSD tracks 31 tracks 30 tracks not done tracks 47 tracks  44 tracks ok all real tracks 43 tracks 42 tracks not done A additional cut d<20 um Actually all 47 tracks |  proj  were manually checked And dropped 3 were fakes [1] Real track in CS2 but chance coincidence fake track in CS1 [2] (Compton + Fog chance coincidence) for CS1,CS2 [3] (Fog chance coincidence+ Fog chance coincidence) for CS1,CS have lower number of tracks was found. We will take CSD data again but just used for connection test.

dy dx ax ay day y x

dy dx ax ay day y x

Making Prediction on ECC pl1 ECC pl1 Most down stream one. Jump Gap :: plastic + Spider + CS box + CS pack :: 4340 um Using CS Xrays on CSD and PL1. PL1 and CSD were calibrated. Then. All tracks by final selection were scanned about 1.2mmx1.2mm by UTS. Just technical reason, Pl1 and Pl2 were independently scanned by UTS using Predictions extrapolating from CSD. k

Scanned result (# , pl1, UTS)

scanned result (# , Pl2, UTS)

scanned result (# , Pl1, UTS)

scanned result (# , Pl2, UTS)

Pl1(PL2) connecting conditin A temporary loose cut are applied to count connected tracks - Angle tolerance from CSD found angle < 40 mrad. - Position tolerance from prediction < 200 um ( each projections).

CS->Brick result # of UTS scanned prediction :: 44 Additional Gap = 160 um # of candidate /Prediction pl1 pl Coincidence pl1 & pl2 33 pl1(single) & pl2(single) 32 one of pl1 or pl2 9 Non 2 And 40 tracks were continue to Location procedure in Brick and passing through the Brick (demonstrated yesterday) !

CS->Brick result # of UTS scanned prediction :: 42 Additional gap =160 um # of candidate /Prediction pl1 pl Coincidence pl1 & pl2 26 pl1(single) & pl2(single) 24 one of pl1 or pl2 12 Non 4 Ready to location procedure. About 32 tracks

CS->Brick result # of UTS scanned prediction :: 30 Additional Gap =0 um; # of candidate /Prediction pl1 pl (include above) 10 8 Multi rate is high.., Remind you, this film was high fog density as 30/(10um)**3 (Chiara). This films are affected by “Safety right dose” by early stage. Already several tracks picked at most down stream were confirmed as passing in the Brick by plate changer system. Location is possible even such a case !

Summary CS  Brick connection scanning was done for 3 BAM made Bricks. About 8 cm x 7 cm scanning on CSD gives about 40 real tracks for connection test to Brick. Then the connection residual is well small value a few 100 um shift deviation level of 100 um. in all 3 bricks Connection efficiency is high as 90 to 95% ( , ) will be carefully tested. We will investigate the reason of PL1 PL2 not found tracks. (Maybe they are low momentum tracks..) Remark :: Location can be done, event looks very Black film ( ) And this is really worst case and never in future..