1 Project Overview n Review current and future problems n Develop Solutions that will provide the customer with high quality reliable power n Test the.

Slides:



Advertisements
Similar presentations
Southwest Rhode Island Transmission Supply Study Long Term Needs and Solutions.
Advertisements

NERC Footnote b / 12 – Load Loss
Houston Region Import Capacity Project Planning for Reliable Power.
Study Committee Representatives Annual Report December, 2012
March 26, 2014 Transmission Coordination and Planning Committee 2014 Q1 Stakeholder Meeting.
New Energy Horizons Opportunities and Challenges Fault Current Contributions from Wind Plants Dean Miller PacifiCorp July 25,
Sistan & Balouchestan Electric Power Distribution Company
Power Grid Reinforcement Fall Presentation Team 9b: – Jon Brown – Kyle Reininger – Alan Myers – Karl Homburg – Dan Sinnott.
Company LOGO Cleco Planning Process. Models Cleco uses SPP’s annual series of models to determine the NERC reliability violations. Cleco uses SPP or VST.
Regional Planning Group Project
Transmission Transporting Electricity by Wire Darcy Neigum Montana-Dakota Utilities Co.
Reporting the Economics of Reliable Energy Ralph Fehr, P.E. Engineering Consultant Reliability of the U.S. Power Grid.
Cleco Transmission Planning Summit 2011 Coughlin Transmission Operations Center April 15, :00 – 11:00am.
Arrowhead  Weston Transmission Line Project Dave Van House Minnesota Power.
KURTEN SWITCH PROJECT (BRYAN/ COLLEGE STATION AREA UPGRADES) Technical Advisory Committee December 1, 2005 Transmission Services.
Houston Region Import Capacity Project August 27, 2013 Regional Planning Group Meeting.
1 Team BUSS Backup Storage Source. 2 Team BUSS Backup Storage Source EHV Substation Second DC Storage Source Sponsor Idaho Power Company Team Members.
Technical Advisory Committee December 6, 2010 Summary of the CREZ Reactive Study Warren Lasher Manager, Long-Term Planning and Policy.
RiversidePublicUtilities.com Arts & Innovation RiversidePublicUtilities.com Challenges and Solutions for Large-Scale PV Integration on RPU’s Distribution.
1 Entergy Louisiana, LLC (South) & Entergy New Orleans, Inc. Proposed Transmission Reliability Projects Entergy Transmission Planning Summit New Orleans,
Team BUSS Backup Storage Source. Team BUSS Idaho Power Company Backup Storage Source Project Title Extra High Voltage (EHV) Station Second DC Storage.
Distributed Power Systems ELCT 908
Interconnection of Distributed Generation
Jan 13, 2012 RPG Meeting El Campo – Vanderbilt 69 kV Project – Status report Ehsan Ur Rehman Planning Engineer ERCOT.
Visibility 10/1/ Agenda Visibility Overview Status –WECC –ColumbiaGrid Issues Preliminary Thoughts Regarding Conclusions and Recommendations Next.
Review of progress and future work SQSS Sub Group 2 August 2006 DTI / OFGEM OFFSHORE TRANSMISSION EXPERTS GROUP.
SUSTAINABLE ENERGY REGULATION AND POLICY-MAKING FOR AFRICA Module 13 Energy Efficiency Module 13: SUPPLY-SIDE MANAGEMENT.
PQSynergy TM 2011 Harmonic Assessment of PEA North1, Chiangmai’s Customers in North Industrial Estate Chotepong Pongsriwat. M.Eng(EE) Chief of Power.
Report on the NCTPC 2006 Collaborative Transmission Plan Mark Byrd, Manager – Transmission Planning Progress Energy Carolinas, Inc January 25, 2007.
ISO Exhibit 13 Federal Energy Regulatory Commission Technical Conference on Connecticut Infrastructure Reliability and Operability Committee Update Hartford,
The Value of Electric Transmission NASUCA Mid-Year Meeting June 25, 2012.
Grid, Smart grid, CURENT. Basic components of the Electric Grid Power Plant- Electricity generation Transmission- Transmit electricity to different areas.
1 Entergy Mississippi, Inc. Proposed Transmission Reliability Projects Transmission Planning Summit.
Reliable Power Reliable Markets Reliable People Performance Targets for the Customer Interconnection Process January, 2008.
Lyndonville Electric Department Feasibility Analysis Review December 2,
Using a Dispersed Strategy in Your Region By Mike Michaud Matrix Energy Solutions Edited and Presented By Brian Antonich Windustry.
Texas Wind Energy American Meteorological Society Summer Community Meeting – Norman Oklahoma Henry Durrwachter, P.E. August 12, 2009.
Ordering Tool Guideline
APS Overview Richard Nicosia. APS Snapshot Largest and longest serving electric utility Operations dating back to th largest employer headquartered.
1 Entergy Gulf States Louisiana, L.L.C. Proposed Transmission Reliability Projects.
Jones Creek Project Submitted to RPG on July 7, 2014 July 22, 2014 Regional Planning Group Meeting.
Current Export Initiatives Jerry Mossing Exports Workshop February, 16,2006, Metropolitan Center, Calgary.
Power Plant Construction and QA/QC Section 4.3 – Electrical Interconnections Engineering Technology Division.
Big Stone II – Delivery Study Phase 6 and Supplemental #2 For Northern MAPP SPG Meeting 4/3/07 Elk River Richard Dahl Missouri River Energy Services.
Level 2 Unit 2 Investigating Engineering Design Engineering Diploma Level 2 Unit 2 Investigating Engineering Design In this unit you will find out how.
Jesus A. Guerra, P.E. Distribution System Reliability CenterPoint Energy SWEDE 2011.
SPP.org 1. Status Update for Reliability and Economic Assessments Stakeholder Meeting June 20 th, 2008 Austin, TX.
Adding Nuclear Power to the Grid ASQ Energy and Environmental Conference August 28, 2006.
TRANSMISSION INFRASTRUCTURE IMPROVEMENTS — Current Projects — The Center for the New West “ The Sun Valley Energy Roundtables 2006” November 30 – December.
September 1, 2011 TAC Lower Rio Grande Valley Regional Planning Group Project Jeff Billo Manager, Mid-Term Planning.
Update on the North Carolina Transmission Planning Collaborative January 30, 2007 For the North Carolina Utilities Commission and the North Carolina Public.
June 3, 2010 Technical Advisory Group RMR Exit for Spencer 5 – Remedial Action Plans Jay Teixeira.
1 Entergy Mississippi, Inc. Proposed Transmission Reliability Projects Entergy Transmission Planning Summit New Orleans, LA July 10, 2003.
2006 Reliability Study James Manning Bryan Guy May 12, 2006.
June 26, 2008 Technical Advisory Committee American Electric Power Service Corporation Presidio Area Reliability Improvements Project James Teixeira Manager,
Presentation Topic: Circuit Breakers Represented to: Dr. M. Riaz Khan Represented by: M. Mujahid.
Conclusion: reliable post contingency capacitor switching should be feasible to be planned. However, the simulation needs to be repeated as new information.
Sub Station.
Protection Relay Modeling for Transient Stability Simulation 10/26/2016 CJ Jing, David Franklin, Kevin Moran.
Transmission Planning in ERCOT- Overview
SUB-STATIONS.
“Electricity Supply Reliability Project - Additional Financing”
Planning Tools Overview
POWER SYSTEM ANALYSIS INTRODUCTION.
Protection Relay Modeling for Transient Stability Simulation 10/26/2016 CJ Jing, David Franklin, Kevin Moran.
Term Project: Challenges in supplying Energy to Central Region
Review of Distribution Network Protection
Planning Tools Overview
Use of EDWG Data by the LTPT
M. Kezunovic (P.I.) S. S. Luo D. Ristanovic Texas A&M University
Presentation transcript:

1 Project Overview n Review current and future problems n Develop Solutions that will provide the customer with high quality reliable power n Test the solution against a 2004 base case using PTI’s PSS/E (Power Simulation Software). n Choose the best solution that will provide the customer with high quality reliable power, yet at a low cost. With de-regulation of the electric power industry immanent, the transmission system has to be highly reliable and cost effective.

2 Problem Definition n Low voltage problems in the Mecosta area during heavy load conditions. n Capacitor bank installed at the Mecosta 138kV substation to temporarily fix the problem. n During a single contingency (single problem) on the grid, the current design will not support the system. n The increasing load is leading to overloading problems that the system will not be able to tolerate much longer.

3 Problem Area The Problem Area is centered around Mecosta, Michigan, near Cadillac. The two primary customers in this part of the service territory are Acuglas and Evart Products.

4 Design Approach Low Voltage Problems l Add New Lines l Reconductor Lines l Add Capacitor Banks l Tie Into 345kV System IsolatedSystem Simulation/Testing Evaluate Solutions & Submit

5 Design Specifications n Equipment loading should not exceed 100% of its normal loading (line loading, transformer loading, etc). n Voltages on the EHV network should be between 0.97 & 1.05 p.u., during normal conditions (FERC Form 715). n Develop all solutions and contingencies under a 2004 base case. n Consider customer concerns and “right of way” when considering pole/tower designs. n Tweak solutions for economic and system stability reasons.

6 Tools and Standards Used n PTI’s PSS/E (Power System Simulator for Engineering). n Aspen Powerflow to Calculate impedance of lines n Federal Energy Regulatory Commission Standards (FERC form 715) n Consumers Energy Co. Standards and Specifications

7 Impedance Calculations n Used Aspen Line Constants Software to calculate impedance's to be entered into PSS/E

8 Possible Solutions Lake Co. ChaseOhman Rd. Jct. 19 miles 18 miles 1. Add New Conductor ClareOhman Rd. Jct. 27 miles 2. Add New Conductor Ohman Rd. Jct. Wexford 26 miles 3. Add New Conductor 138 kV $8.1 Million $5.6 Million $5.5 Million

9 Possible Solutions - continued New Sub (345kV) < 1 mile 4. Tie into 345kV grid (still in progress) Stronach (138 kV) ChaseOhman Rd. Jct. 18 miles 5. Add New Conductor ChaseOhman Rd. Jct. Clare 27 miles 18 miles 6. Add New Conductor $5.5 Million $4.1 Million $10 Million 138 kV

10 Contingencies x x x x x x x x x Tippy Generator Out Cobb Generator Out Croton Generator Out All other x’s indicate line taken out

11 Comparison of Base Case and Possible Solutions Without Any Contingencies

12 Comparison of Base Case and Possible Solutions With Contingency One

13 Comparison of Base Case and Possible Solutions With Contingency Three

14 Work In Progress n Look at each solution on a basis of: u engineering standards and specifications u cost of implementation u environmental factors n Using the information above, determine which solution will be of best interest to Consumers Energy and turn in the Concept Approval. n Design required additions to substations and transmission system. Create CAD drawings of these solutions. n Develop and present our final recommendations to Consumers Energy.

15 Conclusions n These solutions will support the current grid with a single contingency. n Each solution was developed with an estimated 2004 base case, ensuring reliability through the year n Simulation showed line reconductoring was not a very useful solution. Adding addition lines, capacitor banks, and tying into the 345kV system gave the best results.