BUILDING STRONG ® USACE/FEMA 2011 Remedial Action Program Workshop December 6-9, 2011 Orlando, FL.

Slides:



Advertisements
Similar presentations
Crisis Management and GIS at the Local Level Using GIS in the Recovery of the April 27 th Tornadoes.
Advertisements

New FEMA Regulations and Guidelines for Disaster Recovery Plans MWMA Fall Summit 2007 Philadelphia, PA.
Prepare + Prevent + Respond + Recover + Mitigate 1 Credit Resolution Initiative GOHSEPs focus is on proactively working with applicants to: – Identify.
1 DEBRIS MANAGEMENT OVERVIEW PRESENTER: GREG KELLER, Disaster Recovery Branch Grants Administrator/Public Assistance Officer (614)
Hurricane Katrina Update: PD&R Assistance Dana Bres, P.E. Research Engineer Affordable Housing Research and Technology Division Office of Research, Evaluation.
Public Assistance Alternative Procedure Pilot Program Debris
BUILDING STRONG ® USACE/FEMA 2011 Remedial Action Program Workshop December 6-9, 2011 Orlando, FL.
MODULE 3. MANAGING EMERGENCY RESPONSE Dick Evans.
@TxSchoolSafety Continuity of Operations Planning Workshop Devolution & Reconstitution.
Module 30 Homeland Security and Civil Emergency Management Civil Works Orientation Course - FY 11.
US Army Corps of Engineers BUILDING STRONG ® COASTAL DAMAGE REDUCTION FLOOD DAMAGE REDUCTION NAVIGATION ECOSYSTEM RESTORATIONREGULATORY INTERAGENCY & INTERNATIONAL.
BUILDING STRONG ® Engineer Research and Development Center USACE Reachback Operations Center (UROC)
Flood Risk Management Program Ed Hecker, Chief, Office of Homeland Security National Levee Summit February 2008 St Louis, MO.
Update Training Meeting
Sandy Recovery Improvement Act (SRIA) of 2013 Sandy Recovery Improvement Act (SRIA) of 2013 Public Assistance Program Alternate Procedures Pilot Program.
US Army Corps of Engineers BUILDING STRONG ® Ty Brumfield (LNO to FEMA –RSF-IS National Coordinator Office of Homeland Security Directorate of Contingency.
US Army Corps of Engineers BUILDING STRONG ® Overview of Public Law (PL) Advanced Measures Contingency Operations Directorate.
BUILDING STRONG ® USACE/FEMA 2011 Remedial Action Program Workshop December 6-9, 2011 Orlando, FL.
1 Briefing on Post Gustav Efforts September 5, :00 pm EDT.
BUILDING STRONG ® USACE/FEMA 2011 Remedial Action Program Workshop December 6-9, 2011 Orlando, FL.
BUILDING STRONG ® USACE/FEMA 2011 Remedial Action Program Workshop December 6-9, 2011 Orlando, FL.
State Debris Management Plan California the “Disney Land of Disasters”
Risk and Emergency Management Division Southside Hampton Roads Hazard Mitigation Plan.
Introduction to Operation: Military Kids and OMK Implementation Framework.
US Army Corps of Engineers BUILDING STRONG ® Missouri River Flood Task Force (MRFTF) Concept Briefing
US Army Corps of Engineers BUILDING STRONG ® Flood Risk Management Update Stephanie Bray 12/10/2013.
Flood Risk Management Program Rolf Olsen Institute for Water Resources U.S. Army Corps of Engineers.
Texas Department of Public Safety Division of Emergency Management Debris Management Overview.
NGAC Interagency Data Sharing and Collaboration Spotlight Session: Best Practices and Lessons Learned Robert F. Austin, PhD, GISP Washington, DC March.
AmeriCorps in Times of Disaster AmeriCorps Conference July 23,
Eere.energy.gov Outline Goals & Principles Approach & Delivery Accessing TA –Online resources: Solution Center –Provider network: Technical Assistance.
Workforce Training and Education Coordinating Board 9/11/2015 WEDA Spring/Summer Conference Tools for the Recovery Workforce Development.
Readiness and Homeland Security Workshop Streamer Requirements Update And USACE Response Capabilities.
NRT/RRT Co-Chairs Meeting Columbia Shuttle Incident Overview Debbie Dietrich NRT Chair, National Response Team March 4, 2003.
Unit 8:COOP Plan and Procedures  Explain purpose of a COOP plan  Propose an outline for a COOP plan  Identify procedures that can effectively support.
Dam Hazard Consequences Assessment
Technical Assistance Workshop – Fiscal Year 2004 TechnologyOpportunities Program Program.
Disaster Debris Preparedness Planning Angeline McInerny Wake County Environmental Services Department.
BUILDING STRONG ® WELCOME to the 2011 USACE/FEMA Remedial Action Program Workshop December 6-8, 2011 Orlando, FL.
ESF #3 – Public Works and Engineering IS-803 – February 2009 Visual 1 Public Works and Engineering ESF #3.
US Army Corps of Engineers BUILDING STRONG ® USACE – Stafford Act Contracting Opportunities Peter Navesky HQ USQACE Disaster Program Manager June 2010.
The New Public Assistance ProgramOV-1 Objectives  Describe the purpose of the New Public Assistance Program  Identify the components of the New Public.
Program Name or Ancillary Texteere.energy.gov April 1, 2010 Molly Lunn, SEP and EECBG Technical Assistance Lead Technical Assistance Overview Resources.
Our Mission MITIGATIONS. MEANING OF MITIGATION MITIGATION IS THE PERMANENT REDUCTION OF THE RISK OF DISASTER MITIGATION IS THE PERMANENT REDUCTION OF.
US Army Corps of Engineers BUILDING STRONG ® Debris Management Mobile District.
Emergency Management Training and Education System Protection and National Preparedness National Preparedness Directorate National Training and Education.
Presented by Michael W. Sydow, PE Chief, Environmental and IIS Management Branch USAED Savannah Performance Based Contracting A USACE Perspective.
McClain County Multi- Jurisdictional Multi-Hazard Mitigation Plan Update Image from
US Army Corps of Engineers BUILDING STRONG ® Emergency Response Policy Revision Update ( ER & EP ) Jeffrey Jensen CECW-HS USACE Flood Risk Management.
Republic of Sudan Federal Ministry Of Health Thematic Area 5 progress Health Emergency Preperdness and Response.
BUILDING STRONG ® USACE/FEMA 2011 Remedial Action Program Workshop December 6-9, 2011 Orlando, FL.
US Army Corps of Engineers BUILDING STRONG ® US Army Corps of Engineers BUILDING STRONG ® USACE / FEMA Remedial Action Program (RAP) Workshop.
0 FEMA Region 6 Floods: The Response and the Costs Bob Bennett Response Division FEMA Region 6.
2015 USACE Exercise – December 1, 2015 New Madrid Seismic Zone – Earthquake FEMA Mission, Legal Authorities and Regional Capability Overview Gus Wulfkuhle.
CVFPB Executive Committee Meeting – Agenda Item No. 4C Central Valley Flood Protection Board.
Arkansas Department of Emergency Management Arkansas’ Homeland Security & Preparedness Agency Sandy Recovery Improvement Act of 2013 Public Assistance.
BUILDING STRONG ® 1 Risk Management Center Silver Jackets Program Overview Jennifer Dunn USACE, Institute for Water Resources Silver Jackets Program Manager.
EXPECT THE UNEXPECTED Prepare Your Business for Disaster.
Nassau County Disaster Debris Management Plan Debris Planning Team Meeting 1, April 24.
Business Continuity Planning 101
US Army Corps of Engineers BUILDING STRONG ® Flood Fighting and Planning US Army Corps of Engineers Omaha District Joel Ames Tribal Liaison.
US Army Corps of Engineers BUILDING STRONG ® Huntington District Floodplain Management Services Dan Bailey, CFM Huntington District August 2012.
Critical Situation Management, Inc. Automating Response Processes with 4 command ™
EMERGENCY CONTRACTING AND HURRICANE KATRINA Thomas H. Gourlay, Jr. Chief Trial Attorney U.S. Army Corps of Engineers.
PUBLIC ASSISTANCE GRANTS
Disaster and Emergency Planning
Hyper-V Cloud Proof of Concept Kickoff Meeting <Customer Name>
Office of Emergency Communications
Remedial Action Program Workshop
Revolutionize USACE Civil Works
Presentation transcript:

BUILDING STRONG ® USACE/FEMA 2011 Remedial Action Program Workshop December 6-9, 2011 Orlando, FL

BUILDING STRONG ® Debris 2011 USACE/FEMA RAP Workshop

BUILDING STRONG ®  Mission The Debris Management Mission provides capabilities such as removal, reduction and disposal of disaster debris in support of the National Response Framework. Debris management missions may be executed by the U.S. Army Corps of Engineers (USACE) as a Direct Federal Assistance mission, other alternatives are for USACE to provide FEMA and local governments with technical assistance and federal operations support.  Capabilities ► Debris Planning and Response Teams (PRTs): 8 ► Debris Subject Matter Experts (SME’s): 22 ► Debris Specialist: 15 ► ACI Contracts: $ 2.7 B capacity  Automated Debris Management System (ADMS)  PSMA: TA and DFA Debris

BUILDING STRONG ® 2010/2011 Deployments: Direct Federal Assistance (DFA) Missions  MS tornados 2010 MVK  MS Tornado 2011 MVK (Mission assignment to fiscal closeout in 60 days)  AL Tornados 2011 SAM (64 applicants in Alabama (record))  MO tornados 2011 NWP  ND floods 2011 MVK Technical Assistance (TA) Missions  Deployed SME’s over 15 separate events. During 2011 entire Debris SME Cadre was deployed. Improvements  ADMS used AL & MO 2011  Tested Scanner MO 2011  Utilized SDIC Rapid Contract in Missouri; Contract provided capability for immediate response.  Reconstituted New Orleans PRT  New ACI Strategy (Each MSC 1 Small Business and 1 large unrestricted with backup) Each MSC KO SME  Tested Droid with MICA for documenting ROE’s and PPDR during North Dakota flood event.  Supported FEMA Region VI with Data Collection Tool development.

BUILDING STRONG ® Debris IssueRecommendationsStatus 1.Action #1: FEMA AAR and draft analysis Start Date: Aug 2011 Est. Completion Date: Dec 2011 Action Lead: FEMA PA 2.Action #2: Development of additional guidance….fact sheet, SOP Start Date: Dec 2011 Est. Completion Date: TBD Action Lead: FEMA PA Ongoing Resolutions: In review Obstacles: Federal, State and Local issues PDT Members: FEMA USACE Issue Title: Operation Clean Sweep and/or Expedited Debris Removal Problem Statement: The pilot “initiative” was delivered without clear, consistent and timely guidance and was confusing to USACE, FEMA, State EMA and applicants. Key Discussion Points: Incorporated lessons learned during Alabama Tornado event into Missouri Tornado event. Program Expedited Private Property Debris Removal (PPDR) Accelerated recovery time NGA System for Depicting Catastrophic and Extensive Damaged Areas Authorization Timeframe Cost (USACE/FEMA) Insurance Issues Not a “one-size fits all” program Trained Personnel Possible Contract concerns

BUILDING STRONG ® Debris IssueRecommendationsStatus 1.Action #1: Research and evaluate potential new innovative systems Start Date: 2012 Est. Completion Date: TBD Action Lead: FEMA USACE, UROC 2.Action #2: Development of a new technology plan Start Date: 2012 Est. Completion Date: TBD Action Lead: FEMA Ongoing Resolutions: In review Obstacles: Funding System compatibility and security PDT Members: FEMA USACE Issue Title: Implementing New Technology for Debris Management Systems Problem Statement: Technology currently in use restricts efficiencies, accuracy, accountability and real time reporting consequently requiring adaptation to new advanced innovative systems. Key Discussion Points: Increase/Decrease in cost Detailed estimates and Expedited Debris Eligibility Calls Grants based on estimates Detailed mapping of debris and ROE’s Droid, iPhone and iPad