COST286 meeting Barcelona 14/15 April 20051 BUTE Part 1 Conducted and radiated disturbance regulations for PLC devices János Löcher; György Varjú BUTE.

Slides:



Advertisements
Similar presentations
Seminar Report On Digital Power Line Carrier Communication
Advertisements

Mitigation of AC Induced Voltage On Buried Metallic Pipelines
Conducted Immunity IEC
Cable Broadband EOC (Ethernet On Cable) By Introduction.
Safecom INGRESS GATE technology (Patent p)
1 Chelmsford Amateur Radio Society Intermediate Licence Course Carl Thomson G3PEM Slide Set 9: v1.2, 31-May-2009 Antennas & Feeders Chelmsford Amateur.
Principles of Telecommunications Technology Chapter 2.
UNIVERSITI MALAYSIA PERLIS
Designing a EMC Compatible Electronic Meter using AD7755 a.
Principles of Telecommunications Technology Chapter 2.
Powerline Communications: Channel Characterization and Modem Design Yangpo Gao Helsinki University of Technology
SE35presentation.ppt France Telecom R&D CEPT ERC SE35 activities on compatibility between radio services and PLT (Power Line Telecommunications) Dubrovnik,
ESE – Andrew Rusek Applications of Computer Modeling in Electromagnetic Compatibility (EMC) Tests (Part1) P8. Field Pattern of Three Radiating.
“Broadband over Power Lines” Prepared by Muneer Al-Marhoun Abdulrazaq Al-dandan.
Crosstalk Overview and Modes.
Cost 286 Wroclav 17-18/09/20031/27 Budapest University of Technology and Economics Faculty of Electrical Engineering and Informatics Department of Electric.
Current research work and plans Zbigniew M. Jóskiewicz Wroclaw University of Technology Institute of Telecommunication and Acoustics Wybrzeże Wyspiańskiego.
Industrial Solutions and Services Your Success is Our Goal EMC Testing for Emission and Immunity Diethard E. C. Moehr, I&S CTF EMC.
COST286 EMC in Diffused Communications Systems Professor Andy Marvin Chairman, COST 286 Management Committee.
Electromagnetic Wave Theory
ULg - EMC Lab Budapest Oct 17 - JTA2 - Cost 2861 COST JTA 2 - EMC analysis of LF unstructured telecom networks Ir. V.Beauvois
How to efficiently use the electrical distribution underground cables for Power Line Communications and to achieve the Smart grid’s goals. Energy Smart.
May 2005 Radio Research Laboratory Ministry of Information and Communication Designation of Testing laboratories.
Lecture Notes #5 Antennas and Propagation
Possible Impact of VDSL on Stations Operating in the Amateur Radio Service Ed Hare, W1RFI ARRL Laboratory Manager 225 Main St Newington,CT 06111
RADAR SPECTRUM ENGINEERING CRITERIA (RSEC) A Comprehensive Review
Transmission Media / Channels. Introduction Provides the connection between the transmitter and receiver. 1.Pair of wires – carry electric signal. 2.Optical.
Electromagnetic Compatibility of a DC Power Distribution System for the ATLAS Liquid Argon Calorimeter G. BLANCHOT CERN, CH-1211 Geneva 23, Switzerland.
G Cameron Telecom NZ Ltd. NZCCPTS Noise Interference Guide Good pragmatic overview Due to high variability in nature of: noise sources within power systems.
Power Line Communication using an Audio Input
Lecture 6.
Investigating EMC policies for the SKA Paul van der Merwe Prof. HC Reader Stellenbosch University.
Copyright 2005 International EMC Standards Activity 1 EMC International Standards Update CISPR SC A and I Activity Don Heirman Don HEIRMAN Consultants.
Lecture 16 In this lecture we will discuss comparisons between theoretical predictions of radiation and actual measurements. The experiments consider simple.
Lecture 8 Cable Certification & Testing:. Cable Distribution Cable Distribution Equipment UTP (Unshielded Twisted Pair) UTP Cable Termination Tools UTP.
Power Line Carrier Communication VAIBHAV RAI EN VI-B
Reproduction interdite © ALMA EUROPEAN CONSORTIUM Reproduction forbidden Design, Manufacture, Transport and Integration in Chile of ALMA Antennas Page.
Transmission Lines No. 1  Seattle Pacific University Transmission Lines Kevin Bolding Electrical Engineering Seattle Pacific University.
Bits (0s and 1s) need to be transmitted from one host to another. Each bit is placed on the cable as an electrical signal or pulse. On copper cable the.
Overview of the ATLAS Electromagnetic Compatibility Policy G. BLANCHOT CERN, CH-1211 Geneva 23, Switzerland 10th Workshop on Electronics.
24/03/2003Jacques MdM / REF France1 HF Receivers desensitisation from wideband noise spurious in HF bands (1.8 to 30 MHZ) Impact of spurious radiations.
Background information on GRE/2012/44 (EMC) Proposal for the 05 series of amendments of Regulation No. 10 October 2012 Informal document GRE (68th.
Electromagnetic Compatibility Test for CMS Experiment. Authors C. Rivetta– Fermilab F. Arteche, F. Szoncso, - CERN.
Definitions Electromagnetic Compatibility : (EMC) The capability of electrical and electronic systems, equipment, and devices to operate in their intended.
Hoeffelman_BE_ALPHA 2_Block 1 Barcelona May EMI-EMF update Recent achievement and work going on in relevant WG’s Jean Hoeffelman ELIA- Belgium.
Prof R T KennedyEMC & COMPLIANCE ENGINEERING 1 EET 422 EMC & COMPLIANCE ENGINEERING.
1.PLC Field trial in Arnhem The Netherlands 2. Radiating characteristics of LowVoltage Distribution Networks Experiments related to network issues.
Part 3  Transmission Media & EM Propagations.  Provides the connection between the transmitter and receiver. 1.Pair of wires – carry electric signal.
Part I: Dipoles by Marc C. Tarplee Ph.D. N4UFP
Grounding.
BENATO IT Session 4 – Block 3 – Question 6 Barcelona May 2003 THE ISLANDING PROBLEM PASSIVE PROTECTIONS AS DEMONSTRATE THE POSSIBILITY OF FAILING.
Protection of Power Systems
Noise propagation issues in complex power cables for HEP detectors M. Iglesias, I. Echeverria,F. Arteche 12 th Meeting of the Spanish Network for future.
PXD – DEPFET PS noise emission tests Mateo Iglesias Fernando Arteche.
Developing Cabling Module Situation at August 2006 Vello Vanem.
By Prof. Dr. Mousa A. Abd-Allah Electromagnetic Compatibility.
PLCC OVERVIEW :PRESENTED BY BIMAL NANDA
Committed to connecting the world Overview of ITU-T SG5 Work on Damage protection and safety Guy-Michel KOUAKOU Chairman of Study Group 5 Regional Group.
SunSpec EMC Compatibility Considerations Charles Razzell.
Piero Belforte, CSELT 1999: AEI_EMC_, EMC basics by Flavio Maggioni.
Grounding.
Software TS9975 uses EMC32. I-Key -> E+.
Pulse Processing and Shaping
Richard J. Mohr President, R. J. Mohr Associates, Inc.
Safecom INGRESS GATE technology (US,EP Patent) 28dB UPSTREAM RF & INGRESS NOISE BLOCKER Solving the “Funneling Effect” at HFC & RFoG networks Allows carrier.
Powerline Communications: Channel Characterization and Modem Design
Authors C. Rivetta– Fermilab. F. Arteche , F. Szoncso, - CERN
A. Linearity B. Sensitivity C. Selectivity
Impedance of the 2x50 to 100 ohm transformers.
Presentation transcript:

COST286 meeting Barcelona 14/15 April BUTE Part 1 Conducted and radiated disturbance regulations for PLC devices János Löcher; György Varjú BUTE BUTE Part 2 Site Trial using the low voltage feeder of RBS sited on HV power line tower EPFL Part 3 Mitigation of electromagnetic field radiated by PLC systems (in indoor environment) EPFL

COST286 meeting Barcelona 14/15 April BUTE Part 1 Conducted and radiated disturbance regulations for PLC devices

COST286 meeting Barcelona 14/15 April IEC Signaling on low voltage electrical installations  No radiated interference limits apply below 30 MHz  Limits of mains terminal interference voltage

COST286 meeting Barcelona 14/15 April CLC/prTS50437:2004 Draft Technical Specification for electromagnetic emissions fromaccess powerline communications networks  Limits of conducted common mode (asymmetric mode) disturbances at network cables  Limits of radiated disturbances from networks cables

COST286 meeting Barcelona 14/15 April ITU-T K.60 Emission limits and test methods for telecommunication networks  Limits for unwanted disturbance emissions from telecommunication networks  No conducted interference limits apply

COST286 meeting Barcelona 14/15 April H-field limits converted to E-field using the far field correction of 51.5 dB

COST286 meeting Barcelona 14/15 April BUTE Part 2 Site Trial using the low voltage feeder of RBS sited on HV power line tower

COST286 meeting Barcelona 14/15 April Site Trial using the low voltage feeder of RBS sited on HV power line tower

COST286 meeting Barcelona 14/15 April HE Modem Signal injection Radiated field metering Measuring concept 3 phase Low Voltage feeder PVC insulated phase conductors wounded around a bare neutral

COST286 meeting Barcelona 14/15 April Coupling PLT HE: (capacitive, inductive) - one, two or three phase to neutral - phase to phase - any other combination PLT Modem: (only capacitive) - only phase to neutral Used frequency Upstream:13.8 – 16.3 MHz (512 carrier) Downstream:19 – 22.8 MHz (768 carrier) Injected signal level max. 30 dBm Data transfer rate Downstream:max. 27 Mbps Upstream:max. 18 Mbps System overview

COST286 meeting Barcelona 14/15 April Characteristics to be measured K-factor measurement - H-field - Noise floor - Injected signal Ingression Noise LCL, TCL measurement - CM current Attenuation characteristics measurement Assessment of a technique to mitigate electromagnetic radiation from PLC Note: Regarding the measuring procedures, see: (JTA) “EMC analysis of LF unstructured telecom networks”

COST286 meeting Barcelona 14/15 April EPFL Part 3 Mitigation of electromagnetic field radiated by PLC systems (in indoor environment)

COST286 meeting Barcelona 14/15 April Mitigation of emissions V comp + - I comp - + V PLC I PLC E PLC =V PLC h PLC (f) h PLC (f) E comp =V comp h comp (f) h comp (f) V comp h comp (f)= -V PLC h PLC (f) ? V comp =-V PLC h PLC (f) h comp (f) Injection of an auxiliary compensation signal)

COST286 meeting Barcelona 14/15 April Classical Coupling of PLC Signals

COST286 meeting Barcelona 14/15 April Antenna mode and TL mode Currents

COST286 meeting Barcelona 14/15 April Mitigation u Idea: inject an auxiliary signal S 2 into the line formed by the ground and the neutral conductors u The auxiliary signal S 2 has the same amplitude and waveshape as the original PLC signal S 1, but with opposite polarity

COST286 meeting Barcelona 14/15 April Proposed Coupling: Power Splitter

COST286 meeting Barcelona 14/15 April Bidirectional Data Transmission

COST286 meeting Barcelona 14/15 April Test Configurations

COST286 meeting Barcelona 14/15 April Measurements

COST286 meeting Barcelona 14/15 April Measurement Results