DBS 2.3.4 to DBS i 5.0 Environment Strategy. Agenda Recommended Reference Information Roles & Responsibilities Environment Activities by Phase o Pre-Planning.

Slides:



Advertisements
Similar presentations
Web Hosting. The purpose of this Startup Guide is to familiarize you with Own Web Now's Web Hosting. Own Web Now offers two web hosting platforms, one.
Advertisements

Corporate Interface Architecture George Palios. Contents Outlines the activities undertaken to enhance the quality of service of the Corporate interfacing.
McGraw-Hill/Irwin Copyright © 2007 by The McGraw-Hill Companies, Inc. All rights reserved. Chapter 20 Systems Operations and Support.
Get in touch with Microsoft Dynamics Sure Step Saied Alhamwi, PMP Business Application Manager ACWA Holding
RealProperty PLUS IT Professionals Security Implementation and Utilities © 2009 Domin-8 Enterprise Solutions LLC. All rights reserved.
ITIL: Service Transition
Database Optimization & Maintenance Tim Richard ECM Training Conference#dbwestECM Agenda SQL Configuration OnBase DB Planning Backups Integrity.
Hands-On Microsoft Windows Server 2003 Chapter 2 Installing Windows Server 2003, Standard Edition.
CON7911: Building the Roadmap to a Successful Oracle Commerce Upgrade
Microsoft Dynamics AX Technical Conference 2013
DBS to DBSi 5.0 Environment Strategy. Agenda Recommended Reference Information Roles & Responsibilities Full vs. Minimal Assistance Environment.
PowerPoint Presentation by Charlie Cook Copyright © 2004 South-Western. All rights reserved. Chapter 7 System Design and Implementation System Design and.
000000_1 Confidential and proprietary information of Ingram Micro Inc. — Do not distribute or duplicate without Ingram Micro's express written permission.
Chapter 17 Acquiring and Implementing Accounting Information Systems
National Finance Center’s 2008 Customer Forum EmpowHR 9.0 Billy Dantagnan Teracore.
Microsoft ® Application Virtualization 4.6 Infrastructure Planning and Design Published: September 2008 Updated: February 2010.
Release & Deployment ITIL Version 3
N A managed approach to planning and controlling the implementation of complex application software. n A flexible tool kit, designed to support the Project.
November 2009 Network Disaster Recovery October 2014.
DBSi 5.0 Deployment Overview
Federation of Tax Administrators Technology Conference Tax Systems Integration Initiatives Federation of Tax Administrators Technology Conference Tax Systems.
Migration to NSM r11. © 2005 Computer Associates International, Inc. (CA). All trademarks, trade names, services marks and logos referenced herein belong.
FireRMS SQL Audit, Archiving & Purging Presented by Laura Small FireRMS Quality Assurance.
Customer focused. Results-driven. Moving your business to a new level. 1 December 2010 DBS to 5.0 Delta Presentation Notes Receivable.
Benjamin Lavalley, Sr. Product Marketing Manager Kaseya 2 Upgrade Review.
Microsoft ® SQL Server ® 2008 and SQL Server 2008 R2 Infrastructure Planning and Design Published: February 2009 Updated: January 2012.
DBSi to 5.0 Conversion Overview
New Features Line Item Accounting Customizable windows Family Walkout Date Based Reporting.
DBS to DBSi 5.0 Environment Strategy Quinn March 22, 2011.
11 SECURITY TEMPLATES AND PLANNING Chapter 7. Chapter 7: SECURITY TEMPLATES AND PLANNING2 OVERVIEW  Understand the uses of security templates  Explain.
Lesson 14: Installing and Uninstalling Programs how to install a new program what to do if the new program doesn’t work how to uninstall a program © CCI.
Bring Your Business into the 21 st Century : Part 1 WasteExpo 2011 Improving Your Financial Management System.
DBSi 5.0 Data Cleansing January Agenda Introduction Customer Information Special Characters & Validity Checks Sample Sequel Related documentation.
6 th Annual Focus Users’ Conference Manage Integrations Presented by: Mike Morris.
Chris Wright Senior Systems Engineer, Lucity MOVING TO ONE DATABASE FOR SQL SERVER.
CSI-MAXIMUS, Inc CSI Comprehensive Service & Support Implementing the CSI Way.
TrainingRegister® Training Management Software Maintain Permanent Training Records for Each Individual Monitor and Track Required Training Know Who Needs.
Installation of Storage Foundation for Windows High Availability 5.1 SP2 1 Daniel Schnack Principle Technical Support Engineer.
DBSi 5.0 Data Cleansing. Agenda Introduction Customer Information Special Characters & Validity Checks Sample Sequel Related documentation Questions.
Page 1 of 38 Lenovo Confidential Lenovo Confidential Lenovo Confidential Lenovo Confidential Lenovo Confidential Please Note: Information contained in.
1 Object-Oriented Analysis and Design with the Unified Process Figure 13-1 Implementation discipline activities.
The World Is Our Office 11i Upgrade Versus Install 10 Questions to Consider.
Cognos 8 BI Configuration, Administration, and Upgrade Cognos 8 BI.
Customer focused. Results-driven. Moving your business to a new level. 1 February 2011 DBSi 5.0 Credit Integration.
CACI Proprietary Information | Date 1 PD² SR13 Client Upgrade Name: Semarria Rosemond Title: Systems Analyst, Lead Date: December 8, 2011.
Copyright © 2010 Pearson Education, Inc. or its affiliate(s). All rights reserved.1 | Assessment & Information 1 Online Testing Administrator Training.
CACI Proprietary Information | Date 1 Sybase Open Client 15.5 ESD#6 Name: Semarria Rosemond Title: Systems Analyst, Lead Date: December 8, 2011.
Customer focused. Results-driven. Moving your business to a new level. 1 February 2011 DBS i 5.0 Accounting Integration.
1 #AXUGFocus. Shaun McMikle, RSM US THE UPGRADE PATH AND YOU - GOING FROM R3 TO THE NEW AX.
Case Management Updates.  During the of week April 11, 2011, the ETO system experienced technical difficulties.  As of April 13, 2011, the errors have.
Copyright © 2010 Accenture All Rights Reserved. 1 Copyright © 2010 Accenture All Rights Reserved. Accenture, its logo, and High Performance Delivered are.
ITIL: Service Transition
This is the cover slide..
Roles and Responsibilities
SAP University Alliances
Moving to Epicor ERP version 10: Experiences so far
IEEE Std 1074: Standard for Software Lifecycle
Step by Step Guide for QuickBooks Enterprise Installation QuickBooks Enterprise is a robust accounting software which makes handling business easier for.
3000A - ZIMS Studbooks Deployment/Migration
“All Lawson, All the Time!”
SAP R/3 Installation on WIN NT-ORACLE
SYSTEMS ANALYSIS & DESIGN
3000A - ZIMS Studbooks Deployment/Migration
Systems Operations and Support
Closing the Month in SAGE 300 CRE
System Analysis and Design:
Cutover Strategy (with details becomes Cutover Kickoff) Client
UpgradeX and CloudSuite
Executive Sponsor: Tom Church, Cabinet Secretary
Presentation transcript:

DBS to DBS i 5.0 Environment Strategy

Agenda Recommended Reference Information Roles & Responsibilities Environment Activities by Phase o Pre-Planning o Planning o Dealer Configuration o TEST Conversion Test o Production Conversions o Mock Cutover / Business Testing o Production Cutover (Go Live) © 2010 Accenture. All rights reserved. 2

Before proceeding with any of the following activities, please be sure to have the following reference documentation available, especially if installing these products without deployment assistance. These documents are available on the website for viewing. CODA V11.3 Prerequisites CODA Database Backup Procedures CODA & 3rd Party Software Integrations Operations Guide * For reference only, most setup will be handled by Accenture DBS 2.34 to DBSi 5.0 Coda Conversion Menu Installation Guide *For reference only Accenture will install – dealer will download script DBS 2.34 to DBSi 5.0 Core Installation Guide (DBCI) * For reference only Accenture will install – dealer will download script Reference Information © 2010 Accenture. All rights reserved. 3

Environment tasks and responsibilities Below are the environment build related services to expect: NOTE: The dealer is responsible for making sure the environments are properly sized prior to executing these packages. © 2010 Accenture. All rights reserved. TaskResponsibility Download Coda applicationDealer Install Coda applicationAccenture Download Finance Conversion Menu from website Dealer Install Finance Conversion MenuAccenture Download the DBCI PackageDealer Perform the 5.0 Upgrade (DBCI)Accenture 4

Pre - Planning Identify hardware requirements to host a DBSi 5.0 Test environment (see DBSi Infrastructure Architecture Blueprint for detailed specifications) CODA test environment will be utilized for the mock conversion Acquire the necessary Intel Servers to support Coda Financials Review DASD requirements for additional Finance Conversion package and temporary storage Download software packages: Coda install, Conversion Menu, and DBCi - details and location will be available on request TaskResponsibility Identify Hardware RequirementsShared Separate Deployment LPAR Dealer Additional DASD required? Dealer Acquire Intel Servers for CODA Dealer Full System Save (build Test Environment) Dealer Request DBS to DBSi 5.0 Software Packages Dealer © 2010 Accenture. All rights reserved. 5

Dealer Planning Install Coda Finance Application on Intel Servers Apply Finance Conversion Package to Production and Test environments (NOTE: Test environment for conversions needs to be at a DBS level) A suggestion to take a recent save of the production DBS environment and use that to build a DBSi 5.0 Test environment in which would be upgraded using the provided DBS to DBSi 5.0 Upgrade package TaskResponsibility Install Coda Financials Server Software Accenture Apply Finance Conversion Package to Test, Prod Accenture Build DBSi 5.0 Development Environment Accenture © 2010 Accenture. All rights reserved. 6

Dealer Configuration Coda Financials configuration is recommended to be done on the Coda TEST instance. This instance is also where the Conversion testing should be done as well as against the DBS test environment The dealer is responsible for identifying if any database tuning or indexing requirements on the Coda Financials database are needed to improve performance issues (these can be customized based on dealer configuration) DBS configuration and TEST testing should occur against the DBSi 5.0 Development environment NOTE: Accenture will provide Application Service Packs that may need to be reviewed and applied based on the deployment cycle (not recommended to apply service packs once in Mock testing) © 2010 Accenture. All rights reserved. 7

Conversion Test Coda will help configure the necessary information to the TEST instance of Coda financials. Execute conversion programs from the DBS Conversion Menu that are applicable for the data conversion from IAS to Coda. Testing duration is usually 2 weeks and recommends execution of all masters with some converted historical postings. © 2010 Accenture. All rights reserved. 8

Production Conversions Copy final tested TEST Coda Financials configuration to the Production instance of Coda Financials Make sure the appropriate cross reference spreadsheets are updated and ready for the to 5.0 upgrade (DBCI) Execute the applicable conversions in the DBS production environment updating the production instance of Coda Note: It is recommended to continue daily backups of the Coda test and production databases during this phase © 2010 Accenture. All rights reserved. 9

Mock Cutover (Business Testing) Take a copy of the production Coda Financials database and use it to replace or refresh the information in the TEST instance of Coda Copy the necessary conversion files from production to the test DBS environment Execute the DBS to DBSi 5.0 Upgrade process in the Mock Cutover Plan Copy necessary configured Safe source files from the DBSi 5.0 TEST environment if applicable. Copy the Mock instance of Coda to the TRN (Training) instance if desired to keep any configuration information not already in production. TaskResponsibility Refresh DBS Mock Test Environment Dealer Execute DBSi 5.0 Upgrade (Mock Cutover)Shared © 2010 Accenture. All rights reserved. 10

Production Cutover Execute Month End Close activities (optional – can choose not to convert following a month end) Take a full system After Batch save once Month End Close and preparatory activities are completed Execute the DBS to DBSi 5.0 Upgrade using the Production Cutover Plan developed Apply Application Service Packs where applicable Request application of hot/high fixes where applicable. Validate the DBSi 5.0 environment is built/working correctly Perform a second full system save once validation is complete. TaskResponsibility Full system Save (PRD) prior to CutoverDealer DBS to 5.0 Upgrade (Production Cutover Plan) Application Service Pack, Hot/High fixes Shared Apply FDC/DDC changesDealer Full system Batch Save (after upgrade)Dealer © 2010 Accenture. All rights reserved. 11

Post Production Cutover Revise your current production backup schedule to include new DBSi 5.0 libraries and remove obsolete DBS libraries where applicable Refresh the DBSi 5.0 Test (TEST) environment for testing future service packs and bug/fixes Retire the DBSi 5.0 Mock environment (when applicable) Retire the IAS Finance application within 6 weeks following Go Live Uninstall the Finance Conversion and related temporary files within 6 weeks following Go Live (be sure to save off any files you may want to keep longer term) TaskResponsibility Refresh Test 5.0 environment from productionDealer Remove Finance Conversion toolsDealer Remove IAS Application/LicenseShared Remove DBSi Mock (TEST) environment if applicableDealer © 2010 Accenture. All rights reserved. 12

Where to Get More Information ADMS Website ( Application Service Packs Technical  5.0 Application Service Packs CODA Help from CODA main menu Contact your Accenture Deployment Lead For non-deployment related issues, please continue to contact Accenture Dealer Management Services (ADMS): ADMS support center: or +54 (11) © 2010 Accenture. All rights reserved. 13

Questions / Comments © 2010 Accenture. All rights reserved. 14