K. Long, 13 July, 2015  Target K. Long, Monday, 06 July 2009.

Slides:



Advertisements
Similar presentations
Objective Explain basic arc welding procedures.
Advertisements

MICE Target Shaft Joint Change l MICE Target Ti shaft »Baseline stock material = drawn tube lower joined to solid upper (rather than manufacture from solid)
5.8 Project Management Chapter 37 HL - Only.
CPA Exam Preparation Presented by: Steve Shin March 26, 2014.
Chapter 20 Benchmarking.
Fermilab E906 Schedule Paul E. Reimer 20 June 2008.
Screw Lift Prepared by : Areen abu kishek Amjad Haj Yousef Julia Thaher Heba Asmar Mohammed Qasrawi Presented To : Eng. Jad Mouqadi.
1 Applications of Extrema OBJECTIVE  Solve maximum and minimum problems using calculus. 6.2.
30 th August 2006 ALTERNATIVE OPTIONS FOR SOLAR SERVICE DELIVERY Saliya J. Ranasinghe.
Class 8 Systems Development Asper School of Business - MBA 6150 Management of Information Systems & Technology April-June 2009 Instructor: Bob Travica.
MICE Target Report Chris Booth (for target team) Sheffield 7 th May 2009.
Technical Coordinator’s Report (KL for PD) Solenoid problems & Schedule Actions on –KL/CN: plan for work to December shutdown –KL/CN: plan for work in.
McGraw-Hill/Irwin ©2008 The McGraw-Hill Companies, All Rights Reserved SECTION 12.1 PROJECT MANAGEMENT.
K. Long, 13 June, 2015  Target K. Long, Friday, 24 th April 2009.
K. Long, 14 June, 2015  Target K. Long, Friday, 24 th April 2009.
K. Long, 16 June, 2015 MICE Muon Beam. Beam line and decay solenoid: Pressure reducing valves: Fitted to Q7—9; To be fitted to Q4—6 Upstream MLI: Plan.
K. Long, 27 June, 2015  Target K. Long, Monday, 06 July 2009.
Target Assembly and Installation Update 20 th August 2009 Paul Hodgson The University of Sheffield.
Section 4.0 Project Implementation. Factors that Ensure Success  Update the project plan  Stay within scope  Authorized change implementation  Providing.
 Target K. Long, 23 August 2009 Sunday 23Aug09 Water and power connections made Test water, check power Will plan soak test.
Project Management: Planning and Control How can we make money? (or at least avoid losing it) Dr. David R. Doucette, PE Senior Vice President KLD Engineering.
8/15/2015 New Product Development Pricing 8/15/2015 The Six Discussion Questions + 1. What is incremental pricing and how does one go about using it?
3X3X3 LED CUBE By JASON WU CET4711 FINAL PROJECT.
A few key points about living by grace.... False teaching about grace leads to faulty thinking. Faulty thinking leads a loss of daily freedom and future.
08/24/07Shutdown’07 Week 3 F.G. Garcia1 MTA beam line installation Weekly Report August 24, 2007 Period covered: August 17 th to August 24 th (Week 3)
Effective Methods for Software and Systems Integration
Environment & Sustainability
Systems Development Lifecycle Project Identification & Selection Project Initiation & Planning Analysis Logical Design Physical Design Implementation Maintenance.
Copyright 2010, The World Bank Group. All Rights Reserved. Statistical Work Plan Development Section B 1.
Fraud Awareness Conference FEDERAL TRANSIT ADMINISTRATION Corey Walker Office of Program Management Sound Transit Steel Casing Product Substitution Review.
Perry Lapper Progress. Frame With Actuators Outside Frame.
Community Wellness Prevention Initiative. Target Population Student impacted by their own substance use or abuse Students impacted by substance abusing.
MICE Target Mechanical Design l Status of Target ref. Schedule »Drawings –Drawing list created (see next slide) includes inventory –Drawings being released.
Here are 10 problems to help you practice long division. Solve the problems step by step on a piece of paper, and click your mouse after each step to see.
Jason Tarrant / November 2008 MICE Target Mechanical Design l Jason Tarrant – STFC l Introduction »Investigations into target shaft failure »Current suspicions.
KDM Quicklist. The Problem “Small” but critical company data “lists” are important to businesses. These “lists” are scattered in “One-Off” locations.
GUPCO Kamose Fatality Incident Toolbox Talk Lessons pack Presenter’s Name Title Department Prepared By Dave Goodwill for Dave Blevins.
MICE Project Report Alan Bross (for Paul Drumm). Project Issues ● Key dates: – ISIS Synchrotron start-up scheduled for 1st August ● Shielded area around.
VC117 February 2009Jean-Sébastien GraulichSlide 1 MOM Report o Yagmur Torun ( June 15 - July 14) o J.S. Graulich ( July 13 - August 7) Jean-Sebastien Graulich,
Keeping on Track 5 th February 2014 NBP16 PEG PAIR PURPOSEFUL ASPIRATIONAL INDEPENDENT RESILIENT.
NEW BRUNSWICK COUNSELING CENTER IMPROVING INTERNAL BILLING PROCESSES August 2012.
1 MICE PM Report General Update –Phase I nearing completion –MICE Power –Actions for Decay solenoid & target –Follow-ups from last VC –Conclusions MICE.
By: Matthew Forbes DO 1: PROJECT MANAGEMENT.  Taking last weeks do 1 to the next level  Duration and completion  Planned expenses  To be able to know.
Chris Booth & Paul Smith Sheffield 16 th August 2007 MICE Target Installation.
WELDING Basic Angles Project Copyright © Texas Education Agency, All rights reserved.
1 Meeting the Future Together Update on The Garfield County “Socio-Economic” Impacts Study Energy Advisory Board April 7, 2005.
BINGO GAME. Target Area Cognitive Area Materials Bingo Game Set.
Mu2e Mu2e Remote Handling Review Comparisons: Costs, Risks & Maintainability Ryan Schultz Deputy L3 Manager Target Station 3/3/2015.
Module 3: Vision and Driving Topics 2-6
RFQ Installation Plan PIP-II Meeting, 14-July-2015 C. Baffes for R. Andrews, A. Chen, Y. Czajkowski, S. Kazakov, R. Pasquinelli, D. Peterson, O. Pronitchev,
Schedule and Milestones Roy Preece STFC RAL FAC 17 th April 2015.
Vocabulary Workshop Level B: Unit 2 Review
Target Installation Plan
ISCOM 305 OUTLET Master of Education in Teaching/iscom305outlet.com
ISCOM 305 TUTORIALS Massive Success / iscom305tutorials.com
P.I.I.M.T American University of Leadership
Nodal Status Report: Program Controls Update
BUSI 620 MENTOR creative knowledge /busi620mentor.com
Project scheduling Chapter 10 Copyright ©2016 Pearson Education, Inc.
STR 581 HELP Experience Tradition / str581help.com.
BUSI 620 MENTOR Lessons in Excellence--busi620mentor.com.
BUSI 620 MENTOR Education for Service--busi620mentor.com.
Comprehensive Rate Study & Cost Allocation Analysis
Senge: Chapter 15 THE FIFTH DISCIPLINE
Bridge Report Team Total Domination. Bridge Report Team Total Domination.
Project Scheduling: Lagging, Crashing and Activity Networks
Week 14 – Information System Development
10 Ways to Outsource Business Processes Effectively outsource-business-processes-effectively/
Environment Design and Manufacture National 4 & 5.
Presentation transcript:

K. Long, 13 July, 2015  Target K. Long, Monday, 06 July 2009

Critical path: Issue: target shaft: – Two approaches to shaft manufacture planned: ‘One piece’: weld two pieces together, then grind to size ‘Two piece’: grind to size, then weld – One-piece shaft has failed: Grinding company removed too much material and compromised weld: – One shaft ‘fell apart’ at grinders; – Others have too little material for weld to be considered sound – Therefore now moving on to weld preparation for two-piece shafts

Impact on schedule: Shaft manufacture now ~3 weeks behind schedule Can recover, but need to take care fixing two pieces of shaft together: – Electron-beam weld ‘baseline’: – Alternatives are being considered: Pin, pin and weld, … – If Jason concludes that an alternative fixing scheme should be adopted will present paper to TB for consideration There is risk here! – Well aware of need to install target in August shutdown Also well aware of continuing requirement to maintain high standards of quality control and tracking of manufacture