1 Daya Bay Muon system Installation Workshop, Daya Bay, March 22, 2010 1 Daya Bay RPC Gas System Installation Plan Changguo Lu Princeton University.

Slides:



Advertisements
Similar presentations
The Care and Feeding of Silane Art Garcia FM Global March 23, 2006.
Advertisements

LST Mechanical Design Review Utility Routing, Cableways & Crate Locations Peter Kim October 21, 2003.
H2 Layout for EMU a brief report of a couple of visits by Darin A., Jay R., and FG.
Unit 206: Domestic hot water systems
1 Monitor of Isobutane Content in the RPC Gas Mixture Changguo Lu, Kirk McDonald Princeton University (10/22/2008)
Daya Bay RPC Gas Safety System FDR, June 19, Daya Bay RPC Gas Safety System Design Changguo Lu, Kirk McDonald Princeton University (June 19/20,
1Daya Bay RPC HV FDR 6/17/2008 RPC HV cable pick-up noise issue C. Lu, Princeton University (6/17/2008)
RACKS AND CABLES Peter Kim SLAC LST Install Readiness Review May 5, 2004.
C. Lu, K.T. McDonald RPC Gas System Final Design Review April 11, Daya Bay Reactor Antineutrino Experiment Resistive Plate Chamber Gas System Final.
Daya Bay RPC Gas System: Safety Subsystem Changguo Lu, Princeton University (Jan. 12, 2008)
E.H. #1 RPC Gas System Commissioning  “Leaky” modules’ study 1 Changguo Lu, Princeton University Qingmin Zhang, IHEP Shih-Kai Lin, University of Houston.
1 Daya Bay Muon system Installation Workshop, IHEP, July 14, Updated RPC Gas System Installation Plan Changguo Lu Princeton University.
1 May 6, 2009 C. Lu Continuously Monitoring the RPC Gas Mixture with a Gas Chromatograph C. Lu Princeton University.
C. Lu, RPC System Installation Workshop, 6/11/2009, CUHK 1 1 RPC gas system installation (step by step plan) (CUHK, 6/11/2009) Changguo Lu, Kirk McDonald.
Daya Bay RPC Gas System Installation at EH#1 Lu Changguo 1Daya Bay Muon SYstem Installation Workshop, Daya Bay, 10/18/2010 Our original gas system installation.
Daya Bay Muon Subsystem Review, 7/28-29/2007, IHEP, Beijing RPC Assembly Changguo Lu, Kirk McDonald, Bill Sands Princeton University (July 28, 2007)
1 May 6, 2009 C. Lu Continuously Monitoring the RPC Gas Mixture with a Gas Chromatograph C. Lu Princeton University.
Daya Bay Muon Subsystem Review, 7/28-29/2007, IHEP, Beijing Daya Bay RPC Gas System: Design Report & Budget Estimate Changguo Lu, Kirk McDonald Princeton.
C. Lu, RPC Gas Slow Control Workshop, 7/15/2008, Dongguan, China 1 1 Some thoughts on RPC gas system slow control (Dongguan, 7/15/2008) Changguo Lu Princeton.
RPC system cable routing Yang Changgen, Guan Mengyun IHEP, Beijing.
C. Lu, K.T. McDonald RPC Gas System Final Design Review April 11, 2008 Daya Bay RPC gas system fire safety issue Slides from Gas System FDR + a few more.
C. Lu, RPC Gas Slow Control Workshop, 6/10/2009, CUHK 1 1 RPC gas system slow control (CUHK, 6/10/2009) Changguo Lu Princeton University.
1 Fiber Optics FIBER OPTIC PATCH PANELS. 2 Fiber Optics Just like our copper cable plant the fiber cable plant incorporates many of the same hardware.
1 PBX installation considerations BASIC TELECOMMUNICATIONS.
How to Build a CAN Last Update Copyright Kenneth M. Chipps PhD 1.
Confidential and proprietary materials for authorized Verizon personnel and outside agencies only. Use, disclosure or distribution of this material is.
HVACR116 – Trade Skills Mechanical Drawings.
C. Lu, K.T. McDonald RPC Flammable Gas Monitor April 15, RPC Flammable Gas Monitor Based on Gas Chromatography Changguo Lu, Kirk T. McDonald Princeton.
P. 1Mario Deile – TOTEMino: Infrastructure Status and Schedule Mario Deile Zone 2.Gas system 3.Cabling 4.Cooling water 5.Counting-Room 6.Safety.
1 HVACR116 – Trade Skills Plumbing, HVAC, Electrical Overview.
Thomas Jefferson National Accelerator Facility Page 1 UITF Progress meeting Approved Labyrinth Fresh air pulled through “chicken wire” gate.
HVACR116 – Trade Skills Plumbing, HVAC, Electrical Overview.
Endcap Integration Workshop: June 11-14, CSC Commissioning Andrey Korytov.
V. Bobillier1 Long distance cable installation status Calorimeter commissioning meeting.
1 Discussion for basic options — engineering video conference July 12, 2006 Outline Water pool — advantages — issues, problems, engineering options Aquarium.
Installation and Commissioning Planning Leslie Camilleri Calorimeter Commissioning Meeting 5 th September 2006.
Thomas Jefferson National Accelerator Facility Page 1 Hall B Drift Chambers Review, March 2007 George Jacobs Jefferson Lab Hall B 12 GeV Upgrade Drift.
EH#1 RPC Gas System Repair Report - Zhijian Zhang; Y. Lei; Qiang Xiao & Changguo Lu 11/5/2013.
Daya Bay Muon Subsystem Review, 7/28-29/2007, IHEP, Beijing Muon System PMT Cable Routing Kirk McDonald Princeton University (July 28, 2007)
July LEReC Review July 2014 Low Energy RHIC electron Cooling Al Pendzick LEReC Civil Construction.
Some questions:  In which order cables will be put ?  Who, where will put PS signal cables in bundles ?  Which kind of cable binders: velcro or panduit.
ALICE Collaboration Meeting Heidelberg Services Update  Progress on services Detector cabling Gas systems Cooling systems  Rack footprint  Primary electrical.
Progress Completed Order/Fabricate SS Piping for HBD Purge gas from all detectors DAQ tests Prep. for Shutdown work (open doors, move carriages, etc. Pave.
G. Pugliese RPC requests for GIF++ G.Pugliese, N. Zaganidis and I. Pedraza on behalf of the RPC group 1.
Test Tube Activities at Ohio State (8/5/03) Two (very useful) sub-group meetings after last weekly meeting –Mechanics (Bill, Lu, Mark, Jim, Charlie, Klaus)
Paolo Guglielmini - TS / CV LHCb Install Meeting - 20/04/2005 LHCb Install Meeting 20/04/05 TS / CV / Detector Cooling Installations.
1 US Cost & Schedule Summary W. R. Edwards US Project Manager CD-2/3a Review January 8, 2008 BNL.
1 Daya Bay RPC Gas Safety System - Gas Cabinet Test Report Changguo Lu, Kirk McDonald Princeton University (October 11, 2009)
CM 28 – 6 th October 2010 LH2 Infrastructure M Hills M Courthold T Bradshaw I Mullacrane P Warburton.
Progress on Remote Handling Systems TAC 12 Magnus Göhran – WPM 15 th October 2015.
C. Lu, K.T. McDonald RPC Connections October 27, RPC Module Signal and HV Connections (October 27, 2008) Changguo Lu, Kirk T. McDonald Princeton.
PHENIX WEEKLY PLANNING 2/9/06 Don Lynch. Prep Schedule for Run 6 BBC N&S dried, tested re-installed, final tested [DONE] MuTr FEE and anode purge lines.
8/31/05DR Lynch1 HBD Preparations in the IR Don Lynch.
Summary Plans Content Module assembly at CERN and Dubna Readout DAQ Procurement Stacking Summary.
February 14, Comprehensive Review B. Schmidt Outline: Status and overview of activities: –Platforms and staircases –Muon Filters and beam plugs.
V. Bobillier1 Cable installation status.
RPC Operation Jilei, Qingmin, Changguo, Ningzhe 2013/4/3.
PHENIX WEEKLY PLANNING 3/02/06 Don Lynch. BLM Test.
M1 Central Part Cable Routing R3 FAR R2 CLOSE R2 FAR + GEM A3 B From chain GEM R2 CLOSE R2 FAR A1 20 A1 A1 A2 A CHAIN Access Front Dané.
22/07/2003TOF Gas System PRR (C. R. Gregory) 1 TOF GAS SYSTEM Production Readiness Review SYSTEM INTEGRATION.
CMS-GEM gas system GEMs for CMS High Eta Muons - Workshop III, CERN April R.Guida PH-DT-DI.
1 hcal installation and commissioning status pawel de barbaro, vitali smirnov, june 11, 2007.
SPHENIX MECHANICAL D. Lynch August 21, /15/2014sPHENIX Mechanical Design.
TRD Gas System Layouts Production Readiness Review 03 – Nov F. Hahn.
Straw Working group Ferrara 4/9/2014. Outline Status and Plans Installation of Chambers 1-3 Chamber 4 Vacuum test SRB Readout, monitoring and software.
Example of a LAN Last Update Copyright 2009 Kenneth M. Chipps Ph.D.
LST Installation Readiness Review
Reuters - on the left once you see this leaving Vesenaz
IT Set-up Plan Corporate Process Innovation Dept. Date: June 2014
Presentation transcript:

1 Daya Bay Muon system Installation Workshop, Daya Bay, March 22, Daya Bay RPC Gas System Installation Plan Changguo Lu Princeton University

2 Daya Bay Muon system Installation Workshop, Daya Bay, March 22, Outline of the installation schedule The tasks relevant to RPC gas system installation in MuonInstallationRLS.mpp Gas roomGas mix room Gas room

3 Daya Bay Muon system Installation Workshop, Daya Bay, March 22, Gas/Gas Mixing Rooms Door of gas mixing room, gas cylinders will be entering gas rooms through this door. The door is 1.2m wide and 2m height. View from gas mixing room to EH#1, water pool can be seen through the door. The Air ventilation pipe is installed on the wall. Fresh air flows into the gas mixing room through this pipe. The air circulation is driven by this pipe and the exhaust pipe in the gas room, which is under negative air pressure. Open louvers here to allow air circulation between gas/mixing rooms. View from gas room to mixing room, air ventilation pipe can be seen through the door.

4 Daya Bay Muon system Installation Workshop, Daya Bay, March 22, Gas/Gas Mixing Room

5 Daya Bay Muon system Installation Workshop, Daya Bay, March 22, Layout of the gas/gas mixing rooms

6 Daya Bay Muon system Installation Workshop, Daya Bay, March 22, Detailed plan for WBS items Daya Bay near hall RPC gas system and three GC systems delivered to Daya Bay by 6/30/2010; Install gas mixing/control system and 3 GC systems in 7/8 – 8/5/2010 Prerequisites: Shipping boxes of gas mixing/control system and GCs delivered to gas/gas mixing rooms; Network wall plugs activated; Desk for PC and GC; Power line activated; Water line for sprinkler installed. Manpower: C. Lu, S. Chidzik (Princeton) + Chinese labor contractor.

7 Daya Bay Muon system Installation Workshop, Daya Bay, March 22, Detailed plan for WBS items (cont’d) Chinese labor contractor tasks: Install gas manifolds for Argon, SF6 and R134A in gas mixing room; Route copper gas pipe from gas mixing panel to EH1; Hook up 6” gas ventilation pipe of the gas cabinet to gas room venting port; Connect water pipe to gas cabinet sprinkler; Mount emergency shut-off switch on wall and route wires to gas control panel. Coordination with other Muon installation tasks: Since this part of gas system installation is within gas/gas mixing rooms, it won’t interfere with any other installation tasks.

8 Daya Bay Muon system Installation Workshop, Daya Bay, March 22, Detailed plan for WBS items (cont’d) Install gas distribution and digital bubbler system in 8/6 – 8/26/2010 Prerequisites: Gas racks are installed on RPC module supporting structure. Manpower: Princeton will take care of this installation. Occasionally may need 1 or 2 assistants from labor contractor. Coordination with other Muon installation tasks: There is no foreseeable conflict with other installation tasks during this period.

9 Daya Bay Muon system Installation Workshop, Daya Bay, March 22, Detailed plan for WBS items (cont’d) 6.8 Connect gas tubing between RPC modules and gas distribution & digital bubbler crates in 9/17 – 9/30/2010. Prerequisites: Gas distribution/digital bubbler crates installed and tested; Utility tray on RPC module supporting structure installed. Manpower: Princeton will supervise the installation, Chinese labor will perform the installation. Coordination with other Muon installation tasks: Since HV cables also need to be installed into the utility tray, we need to coordinate these two tasks. Chinese labor contractor’s tasks: Cut plastic tubing to length and label two ends of each tube; Connect each end to its destination connector.

10 Daya Bay Muon system Installation Workshop, Daya Bay, March 22, Detailed plan for WBS items (cont’d) 6.9 RPC system test in 10/1 – 12/20/2010 Princeton will maintain the gas system at this start-up period, locally or remotely. Right now it is still too early to make detailed plan for this task.