Everglades Protection Area Tributary Basins January 15, 2004 Tracey Piccone, P.E.

Slides:



Advertisements
Similar presentations
Status Update on Future Water Quality Strategies for the Refuge Kenneth G. Ammon, P.E., Deputy Executive Director, Everglades Restoration and Capital Projects.
Advertisements

Flood the Sugar Cane Farms Now to Save the Estuaries: Is This Feasible ? Water Resources Advisory Commission January 5, 2006 Meeting.
US Army Corps of Engineers Northwestern Division Northwestern Division 1 System Flood Control Review: Regional Agency Review Briefing Lonnie Mettler Northwestern.
Clean Water Act Integrated Planning Framework Sewer Smart Summit October 23, 2012.
Imperial River: Water Quality Status and Basin Management Action Plan.
Everglades Protection Area Tributary Basins Long-Term Plan for Achieving Water Quality Goals Everglades Protection Area Tributary Basins Long-Term Plan.
C51 RESERVOIR PROJECT UPDATE Design, Permitting and Coordination NOVEMBER 10, 2014.
Expedited Projects + Innovative Teamwork = Measurable Improvements to the Health of Lake Okeechobee and the St. Lucie and Caloosahatchee Estuaries.
Naples Bay Surface Water Improvement and Management (SWIM) Plan
Watershed Management Framework Mission of watershed management –Coordinate and integrate the programs, tools, and resources of multiple stakeholder groups.
Chapter 8: Implementation of the Long-Term Plan for Achieving Water Quality Goals in the Everglades Protection Area 2006 South Florida Environmental Report.
Lecture(3) Instructor : Dr. Abed Al-Majed Nassar
Framework Agreement Principals Meeting #5 March 23, 2015 Everglades Water Quality Restoration.
Impaired and TMDL Waterbody Listings Impacts on DoD Facilities Bill Melville, Regional TMDL Coordinator
In-Delta Storage Process OverviewProcess Overview Program BenefitsProgram Benefits Project CostsProject Costs IssuesIssues Proposed Work Plan for FY 2003Proposed.
Acme Basin B Discharge Public Workshop May 22, 2002 COMPREHENSIVE EVERGLADES RESTORATION PLAN.
Everglades Protection Area Tributary Basins Long-Term Plan for Achieving Water Quality Goals Everglades Protection Area Tributary Basins Long-Term Plan.
Jan 2005 Kissimmee Basin Projects Jan Kissimmee Basin Projects Kissimmee River Restoration Project (KRR) Kissimmee Chain of Lakes Long Term Management.
Interim Update: Preliminary Analyses of Excursions in the A.R.M. Loxahatchee National Wildlife Refuge August 18, 2009 Prepared by SFWMD and FDEP as part.
Capital Improvement Program. During the Annual Strategic Action Plan (SAP) evaluation, long-term needs and priorities are identified by City Council Capital.
Columbia River Water Management Program (CRWMP) Review of Year One Upper Crab Creek Planning Unit Meeting April 17, 2007.
Water Supply Planning Initiative State Water Commission November 22, 2004.
Everglades Protection Area Tributary Basins Long-Term Plan for Achieving Water Quality Goals Everglades Protection Area Tributary Basins Long-Term Plan.
Everglades Protection Area Tributary Basins February 26, 2004 First Annual Public Meeting on Implementation Progress.
Regional Grant Funding Coordination for Implementation of Watershed Management Plans Project Clean Water Summit July 15, 2004 David W. Gibson SDRWQCB
Everglades Protection Area Tributary Basins Long-Term Plan for Achieving Water Quality Goals Everglades Protection Area Tributary Basins Long-Term Plan.
Water Resources Advisory Commission January 5, 2006.
Everglades Protection Area Tributary Basins Long-Term Plan for Achieving Water Quality Goals Everglades Protection Area Tributary Basins Long-Term Plan.
Water Quality Program Financial Assistance Progress and Plans for Meeting RCW Requirements (Joint Legislative Audit and Review Committee)
WRAC Issues Workshop EAA/STA-2 Expansion Cell 4 April 11, 2005 Acceler8 Overview.
Everglades Protection Area Tributary Basins Long-Term Plan for Achieving Water Quality Goals Everglades Protection Area Tributary Basins Long-Term Plan.
Briefing to the Central Valley Flood Protection Board June 28, 2013 Status of State-Led Basin-Wide Feasibility Studies.
Rulemaking for Central Florida Coordination Area Coordinated Rulemaking by the South Florida, St. Johns River and Southwest Florida Water Management Districts.
Tracey Piccone, P.E. August 10, 2004 Tracey Piccone, P.E. August 10, 2004 STA-1W Cell 5 Limerock Berm 2003 Outstanding Project of the Year Palm Beach County.
Suzanne Trevena EPA Water Protection Division Chair Milestone Workgroup December 4,
Basin-Specific Feasibility Studies STA and Reservoir Alternatives Basin-Specific Feasibility Studies STA and Reservoir Alternatives November 21, 2002 Presentation.
Integrated Ecological Assessment February 28, 2006 Long-Term Plan Annual Update Carl Fitz Recovery Model Development and.
Robert M. Summers, Ph.D. September 16, 2015 How can we make sure the Chesapeake Bay Restoration really works?
Everglades Protection Area Tributary Basins Long-Term Plan for Achieving Water Quality Goals Everglades Protection Area Tributary Basins Long-Term Plan.
Everglades Protection Area Tributary Basins Long-Term Plan for Achieving Water Quality Goals Everglades Protection Area Tributary Basins Long-Term Plan.
KWWOA Annual Conference April 2014 Development of a Kentucky Nutrient Strategy Paulette Akers Kentucky Division of Water Frankfort, KY.
Basin-Specific Feasibility Studies, ECP Basins Evaluation of Alternatives Basin-Specific Feasibility Studies, ECP Basins Evaluation of Alternatives August.
Basin Specific Feasibility Studies Everglades Stormwater Program Basins Preliminary Findings Contract C-E024 HSA Engineers & Scientists DB Environmental.
STA Performance Update February 28, 2006 Long-Term Plan Annual Update Tracey Piccone, P.E. February 28, 2006 Long-Term Plan Annual Update Tracey Piccone,
Lee County Water Resource Initiative: Community Sustainability Committee June 16, 2010 Kurt Harclerode Operations Manager Lee County Natural Resources.
WRAC Acme Basin B Discharge Project February 2, 2006.
THE CHARACTERISATION OF A RIVER BASIN DISTRICT Case study on the construction of the baseline scenario Inspired from the Oise case (F) Most elements picked.
Everglades Protection Area Tributary Basins Long-Term Plan for Achieving Water Quality Goals Everglades Protection Area Tributary Basins Long-Term Plan.
Everglades Protection Area Tributary Basins February 28, 2006 Third Annual Public Meeting on Implementation Progress.
Central & Southern Florida Project George Horne Deputy Executive Director Operations & Maintenance Resource Area.
Revisions to the Long-Term Plan for Achieving Everglades Water Quality Goals November 18, 2004 Gary Goforth Chief Consulting Engineer South Florida Water.
Everglades Protection Area Tributary Basins Long-Term Plan for Achieving Water Quality Goals Everglades Protection Area Tributary Basins Long-Term Plan.
Proposed Revisions to the Long-Term Plan Long-Term Plan Communications Meeting August 25, 2004 Gary Goforth Chief Consulting Engineer South Florida Water.
The Lake Okeechobee Protection Plan Evaluation Update, 2007 The Lake Okeechobee Protection Plan Evaluation Update February 8, 2007.
Evaluate Phase Pertemuan Matakuliah: A0774/Information Technology Capital Budgeting Tahun: 2009.
Town of Genoa October 6, Agenda Why are we here? Background Capacity Analysis & Facilities Plan Preferred Alternative Board Direction Implementation.
Slide 1 February 21, 2006 Oakdale Irrigation District Water Resources Plan A Community Plan. A Successful Future. Water Supply Reliability Oakdale Irrigation.
California Water Plan Update Advisory Committee Meeting January 20, 2005.
Everglades Protection Area Tributary Basins February 23, 2005 Second Annual Public Meeting on Implementation Progress.
Santa Rosa Plain Groundwater Management Planning Update Fall 2013.
Basin-Specific Feasibility Studies, ECP Basins Evaluation of Alternatives Basin-Specific Feasibility Studies, ECP Basins Evaluation of Alternatives August.
RECOVER PDT Workshop COMPREHENSIVE EVERGLADES RESTORATION PLAN April 18, 2002.
Everglades Protection Area Tributary Basins Long-Term Plan for Achieving Water Quality Goals Everglades Protection Area Tributary Basins Long-Term Plan.
Basin-Specific Feasibility Studies, ECP Basins Evaluation of Alternatives Basin-Specific Feasibility Studies, ECP Basins Evaluation of Alternatives August.
RECOVER Role/Science Guidance during Design, Construction and Implementation Phases RECOVER Science Meeting March 1, 2016.
Beth Kacvinsky - Lead Project Manager Office of Everglades Policy and Coordination March 1, 2016 IRL-S / C-44 Overview.
Road Investment Decision Framework
Integrated Regional Water Management Grant Program Implemented Jointly by Department of Water Resources and State Water Resources Control Board.
Framework for CSO Control Planning
Town of Melbourne Beach
Presentation transcript:

Everglades Protection Area Tributary Basins January 15, 2004 Tracey Piccone, P.E.

Basins Addressed Seven Everglades Construction Project (ECP) Basins Six Everglades Stormwater Program (ESP) Basins

Everglades Protection Area Tributary Basins Long-Term Plan for Achieving Water Quality Goals Everglades Protection Area Tributary Basins Long-Term Plan for Achieving Water Quality Goals The ECP Basins Seven ECP Basins ØS-5A, S-6, S-7, S-8, C- 139 & C-139 Annex, and C-51 West ØGrouped into six STA- specific areas (STA-1E, STA-1W, STA-2, STA- 3/4, STA-5, STA-6)

Everglades Protection Area Tributary Basins Long-Term Plan for Achieving Water Quality Goals Everglades Protection Area Tributary Basins Long-Term Plan for Achieving Water Quality Goals The ESP Basins Six ESP Basins ØAcme Improvement District, Basin B ØNorth Springs Improvement District ØNorth New River Canal ØC-11 West ØL-28 ØFeeder Canal

Everglades Protection Area Tributary Basins Long-Term Plan for Achieving Water Quality Goals Everglades Protection Area Tributary Basins Long-Term Plan for Achieving Water Quality Goals Technical Basis Primary sources of information used in Plan development were the SFWMD’s Basin-Specific Feasibility Studies completed in October ØFor the ECP Basins, prepared by Burns & McDonnell. ØFor the ESP Basins, prepared by Brown & Caldwell

Everglades Protection Area Tributary Basins Long-Term Plan for Achieving Water Quality Goals Everglades Protection Area Tributary Basins Long-Term Plan for Achieving Water Quality Goals Technical Basis Projections of Plan performance in reducing TP loads discharged to EPA based on daily simulation of 31-year period, both Pre-CERP and Post-CERP ØPre-CERP inflow volumes and TP concentrations taken from SFWMD’s May 2001 Baseline Data. ØPost-CERP hydrologic data taken from supplemental simulation prepared by SFWMD in March 2002.

Everglades Protection Area Tributary Basins Long-Term Plan for Achieving Water Quality Goals Everglades Protection Area Tributary Basins Long-Term Plan for Achieving Water Quality Goals Technical Basis TP concentrations and loads for Post- CERP simulation based on same algorithms and methods as for Pre- CERP ØIn the ECP Basins, it was also necessary to estimate the influence of the EAA Storage Reservoirs Projects on inflow TP concentrations to STAs.

Everglades Protection Area Tributary Basins Long-Term Plan for Achieving Water Quality Goals Everglades Protection Area Tributary Basins Long-Term Plan for Achieving Water Quality Goals Technical Basis In STA-type treatment areas, projections were developed using DMSTA with best available information relative to performance of various vegetative communities ØCalibrations based on results of published, peer-reviewed reports on a wide variety of research projects

Everglades Protection Area Tributary Basins Long-Term Plan for Achieving Water Quality Goals Everglades Protection Area Tributary Basins Long-Term Plan for Achieving Water Quality Goals Planning Objective All analyses were directed to obtaining a Long-Term Geometric Mean TP Concentration in discharges to the EPA of 10 ppb. ØConsistent with phosphorus criterion proposed at the time by FDEP ØPhosphorus criterion finally adopted by ERC varies in detail.

Everglades Protection Area Tributary Basins Long-Term Plan for Achieving Water Quality Goals Everglades Protection Area Tributary Basins Long-Term Plan for Achieving Water Quality Goals Substantial Uncertainties Remain Most Significant Uncertainties- ØInflow volumes and TP loads, both now and Post-CERP ØVariable performance of vegetative communities in STAs - need to continue to improve understanding and reliability of forecasts

Everglades Protection Area Tributary Basins Long-Term Plan for Achieving Water Quality Goals Everglades Protection Area Tributary Basins Long-Term Plan for Achieving Water Quality Goals Sensitivity Analyses Given the substantial uncertainties, the Basin-Specific Feasibility Studies included extensive sensitivity analyses to assess potential range in performance of alternatives considered

Everglades Protection Area Tributary Basins Long-Term Plan for Achieving Water Quality Goals Everglades Protection Area Tributary Basins Long-Term Plan for Achieving Water Quality Goals Principal Conclusions In each basin, a strategy was identified that is capable, within the anticipated range of performance, of meeting the Planning Objective. Remaining uncertainties suggest it would be imprudent to fully rely on the strategies identified. Additional future steps may be necessary.

Everglades Protection Area Tributary Basins Long-Term Plan for Achieving Water Quality Goals Everglades Protection Area Tributary Basins Long-Term Plan for Achieving Water Quality Goals Principal Conclusions In the ESP Basins in particular, substantial savings of public monies could result from improved integration of water quality improvement strategies with CERP projects as formulated. ØBSFS and subsequent analyses suggest savings on the order of $640 million in the ESP basins. ØSavings result not from modification of CERP projects, but from recognizing their impact on TP loads discharged to the EPA (due to diversion for other beneficial purposes).

Everglades Protection Area Tributary Basins Long-Term Plan for Achieving Water Quality Goals Everglades Protection Area Tributary Basins Long-Term Plan for Achieving Water Quality Goals Overall Strategy All scientifically defensible steps are taken at earliest achievable dates Focused efforts are directed to improving the scientific and technical basis for additional steps Incremental implementation of additional steps as soon as their need and utility is confirmed

Everglades Protection Area Tributary Basins Long-Term Plan for Achieving Water Quality Goals Everglades Protection Area Tributary Basins Long-Term Plan for Achieving Water Quality Goals Basic Precepts Substantive scientific uncertainties remain Maximum water quality improvement will require an adaptive implementation process

Everglades Protection Area Tributary Basins Long-Term Plan for Achieving Water Quality Goals Everglades Protection Area Tributary Basins Long-Term Plan for Achieving Water Quality Goals Building Blocks Maximize the benefit realized from integration of this effort with CERP Operate, maintain and monitor existing and proposed treatment works to maximize their treatment effectiveness Take active steps to accelerate the recovery of impacted areas in the EPA

Everglades Protection Area Tributary Basins Long-Term Plan for Achieving Water Quality Goals Everglades Protection Area Tributary Basins Long-Term Plan for Achieving Water Quality Goals Plan Components Three principal plan components ØPre-2006 Projects ØProcess Development and Engineering ØPost-2006 Strategy

Everglades Protection Area Tributary Basins Long-Term Plan for Achieving Water Quality Goals Everglades Protection Area Tributary Basins Long-Term Plan for Achieving Water Quality Goals Pre-2006 Projects Include all structural and operational modifications that can be supported by the current scientific and engineering knowledge base, to be implemented by 12/31/06 ØStructural modification and enhancement of each STA ØAggressive operation, maintenance and monitoring of the STAs

Everglades Protection Area Tributary Basins Long-Term Plan for Achieving Water Quality Goals Everglades Protection Area Tributary Basins Long-Term Plan for Achieving Water Quality Goals Pre-2006 Projects In the ECP Basins (STAs) ØAdditional compartmentalization ØVegetation management and conversion to more effective communities ØOperational refinements In the ESP Basins ØPrimary reliance on source controls and CERP Projects as formulated and scheduled in the July 2001 CERP master implementation schedule

Everglades Protection Area Tributary Basins Long-Term Plan for Achieving Water Quality Goals Everglades Protection Area Tributary Basins Long-Term Plan for Achieving Water Quality Goals Pre-2006 Projects ECP Basins Possibility that planning objective can be achieved through implementation of pre projects. ØDepends heavily on ability to optimize SAV performance; that ability is one principal focus of the Process Development and Engineering component of the Plan

Everglades Protection Area Tributary Basins Long-Term Plan for Achieving Water Quality Goals Everglades Protection Area Tributary Basins Long-Term Plan for Achieving Water Quality Goals Pre-2006 Projects ECP Basins All complete before 12/31/06 Total estimated capital cost of $31.5 million* Incremental operations and maintenance cost through Fiscal Year 2016 of $20.0 million* Total estimated cost for enhancements and modifications of $51.5 million* *All costs include 3% annual escalation

Everglades Protection Area Tributary Basins Long-Term Plan for Achieving Water Quality Goals Everglades Protection Area Tributary Basins Long-Term Plan for Achieving Water Quality Goals Projected Performance Varies by STA Upon completion of pre-2006 STA enhancements ØRange of long-term geometric mean TP concentration of ppb

Everglades Protection Area Tributary Basins Long-Term Plan for Achieving Water Quality Goals Everglades Protection Area Tributary Basins Long-Term Plan for Achieving Water Quality Goals Estimated Total Cost, ECP Basins Through Fiscal Year 2016, Ø$51.5 million for recommended enhancements and modifications to STAs Ø$150.5 million for maintenance and operation of ECP as presently planned Ø$50.2 million for compliance monitoring Ø$51.2 million for operations monitoring and additional operational support necessary to optimize performance and support the PDE Plan component

Everglades Protection Area Tributary Basins Long-Term Plan for Achieving Water Quality Goals Everglades Protection Area Tributary Basins Long-Term Plan for Achieving Water Quality Goals Recommended Strategy ESP Basins Primary reliance on CERP projects ØIn Acme Basin B and L-28 Basins, CERP process to finalize definition of projects ØIn other 4 basins, rely on CERP projects as defined in the “Yellow Book” Couple with funding for source control programs and analysis of improved integration; total of $1.9 million through Fiscal Year 2006.

Everglades Protection Area Tributary Basins Long-Term Plan for Achieving Water Quality Goals Everglades Protection Area Tributary Basins Long-Term Plan for Achieving Water Quality Goals NSID, NNR Canal, and C-11W Basins In NSID, NNRC and C-11W, CERP projects are intended to divert water now discharged to the EPA for other beneficial uses CERP projects as originally formulated will essentially result in achieving the planning objective ØPlan also includes assistance to local communities for implementing urban source controls, evaluation of possible addition of water quality components to C-11W Basin current project

Everglades Protection Area Tributary Basins Long-Term Plan for Achieving Water Quality Goals Everglades Protection Area Tributary Basins Long-Term Plan for Achieving Water Quality Goals Acme Basin B Plan includes further definition of one of the Acme Basin B alternatives considered in the Basin-Specific Feasibility Studies (diversion of Basin B runoff to STA-1E for treatment); additional information and details are provided for consideration by CERP PDT.

Everglades Protection Area Tributary Basins Long-Term Plan for Achieving Water Quality Goals Everglades Protection Area Tributary Basins Long-Term Plan for Achieving Water Quality Goals Western Basins L-28 Basin and Feeder Canal Basin ØAdditional alternatives were developed as part of the Long-Term Plan for consideration by CERP PDT ØAccelerated implementation of CERP projects is recommended

Everglades Protection Area Tributary Basins Long-Term Plan for Achieving Water Quality Goals Everglades Protection Area Tributary Basins Long-Term Plan for Achieving Water Quality Goals Projected Performance in ESP Basins Average annual TP load discharged to EPA reduces from 26 metric tons per year to less than 2 metric tons per year by the end of 2010.

Everglades Protection Area Tributary Basins Long-Term Plan for Achieving Water Quality Goals Everglades Protection Area Tributary Basins Long-Term Plan for Achieving Water Quality Goals Process Development and Engineering (PDE) PDE contains seven primary elements ØIdentify means and methods to replicate the optimal performance of SAV ØDevelop engineering criteria and forecasting tools for additional measures which can be applied within the footprint of existing STAs. ØRefine estimated impacts of CERP projects on basin discharge volumes and pollutant loads

Everglades Protection Area Tributary Basins Long-Term Plan for Achieving Water Quality Goals Everglades Protection Area Tributary Basins Long-Term Plan for Achieving Water Quality Goals Process Development and Engineering (PDE) ØIdentify opportunities to maintain and improve performance of urban and agricultural source controls ØEnhanced control and monitoring of water quality improvement measures now in place ØImprove the reliability of estimated STA inflow volumes and pollutant loads ØDetermine the relationship between quality of water discharged into, and water quality within, the EPA

Everglades Protection Area Tributary Basins Long-Term Plan for Achieving Water Quality Goals Everglades Protection Area Tributary Basins Long-Term Plan for Achieving Water Quality Goals Process Development and Engineering (PDE) PDE will continue through FY 2016 Total budget of $45 million Comprehensive report to Governor and Legislature 12/31/08, presents status of overall effort and recommends further measures

Everglades Protection Area Tributary Basins Long-Term Plan for Achieving Water Quality Goals Everglades Protection Area Tributary Basins Long-Term Plan for Achieving Water Quality Goals Projected PDE Expenditures Through FY 2016 Investigate structural modifications - $1.3 million BMP investigations - $2.1 million Enhanced control and monitoring - $26.5 million Improved analytical & forecasting tools – $11.8 million Optimize SAV performance - $1.2 million Improved reliability of inflow forecasts - $2.1 million Total = $45 million

Everglades Protection Area Tributary Basins Long-Term Plan for Achieving Water Quality Goals Everglades Protection Area Tributary Basins Long-Term Plan for Achieving Water Quality Goals Post-2006 Strategy Identification and adaptive implementation of additional water quality improvement measures following completion of pre-2006 projects ØImplement as soon as their functionality and need is determined ØBased on ongoing analysis of actual performance and the PDE effort ØRecommended funding of $36 million

Everglades Protection Area Tributary Basins Long-Term Plan for Achieving Water Quality Goals Everglades Protection Area Tributary Basins Long-Term Plan for Achieving Water Quality Goals Post-2006 Strategy Possible measures for adaptive implementation within proposed budget includes: ØConversion of additional lands to SAV, PSTA or other vegetative communities ØAdditional structural and operational modifications within existing STAs ØInterbasin transfer of water for more integrated and improved operation ØIntegration of water quality improvement strategies into CERP projects ØImplement more aggressive urban and agricultural source control programs

Everglades Protection Area Tributary Basins Long-Term Plan for Achieving Water Quality Goals Everglades Protection Area Tributary Basins Long-Term Plan for Achieving Water Quality Goals Post-2006 Strategy Implement steps to accelerate recovery of impacted areas ØIncludes final completion of hydropattern restoration works (East WCA-3A, West WCA-3A, and WCA-2A) following a comprehensive benefit/risk assessment ØRecommended funding of $44.5 million through 2016

Everglades Protection Area Tributary Basins Long-Term Plan for Achieving Water Quality Goals Everglades Protection Area Tributary Basins Long-Term Plan for Achieving Water Quality Goals Projected Costs Long-Term Plan total recommended funding of $444 million through Fiscal Year 2016 ØIncludes $13.2 million in program management costs

Everglades Protection Area Tributary Basins Long-Term Plan for Achieving Water Quality Goals Everglades Protection Area Tributary Basins Long-Term Plan for Achieving Water Quality Goals Plan was submitted to FDEP as part of long-term permit application due by December 31, 2003 Plan is being implemented ØSTA Enhancement designs are underway ØResearch & monitoring are progressing ØIntegration with CERP is happening Implementation progress will be presented at 1st annual public meeting on February 26, 2004 Summary

Everglades Protection Area Tributary Basins Long-Term Plan for Achieving Water Quality Goals Everglades Protection Area Tributary Basins Long-Term Plan for Achieving Water Quality Goals Summary Questions?