Everglades Protection Area Tributary Basins Long-Term Plan for Achieving Water Quality Goals Everglades Protection Area Tributary Basins Long-Term Plan.

Similar presentations


Presentation on theme: "Everglades Protection Area Tributary Basins Long-Term Plan for Achieving Water Quality Goals Everglades Protection Area Tributary Basins Long-Term Plan."— Presentation transcript:

1 Everglades Protection Area Tributary Basins Long-Term Plan for Achieving Water Quality Goals Everglades Protection Area Tributary Basins Long-Term Plan for Achieving Water Quality Goals Long-Term Plan Update Source Control Projects Carlos Adorisio

2 Everglades Protection Area Tributary Basins Long-Term Plan for Achieving Water Quality Goals Everglades Protection Area Tributary Basins Long-Term Plan for Achieving Water Quality Goals Bc71 NSID Basin Project Manager: Vince Peluso/Carlos Adorisio Project Description: Perform a hydraulic evaluation of storm events in the NSID basin to determine if there will be negative impacts from redirecting water currently discharged to WCA 2A to the Hillsboro Canal as well as evaluation of the potential for connecting adjacent mining pits to the NSID water management system for additional surface water storage.

3 Everglades Protection Area Tributary Basins Long-Term Plan for Achieving Water Quality Goals Everglades Protection Area Tributary Basins Long-Term Plan for Achieving Water Quality Goals Bc71 NSID Basin Project status Work completed to date ØDeveloped base hydraulic model for NSID ØDeveloped alternative hydraulic model for NSID basin which includes additional surface water storage area

4 Everglades Protection Area Tributary Basins Long-Term Plan for Achieving Water Quality Goals Everglades Protection Area Tributary Basins Long-Term Plan for Achieving Water Quality Goals Bc71 NSID Basin Project status Work planned for remainder of FY04 ØDevelopment of base and alternative hydraulic models of Hillsboro Canal to determine impact of redirecting additional stormwater (May 2004)

5 Everglades Protection Area Tributary Basins Long-Term Plan for Achieving Water Quality Goals Everglades Protection Area Tributary Basins Long-Term Plan for Achieving Water Quality Goals Source Controls NSID Basin SFWMD has entered into a $50,000 agreement with NSID to monitor and improve water quality NSID has implemented operational BMPs that have reduced discharges into EPA NSID requires renewal of permits for surface water management system every 5 years NSID will implement inter-basin transfers of stormwater and will install a telemetry system to further reduce discharges into EPA Agricultural areas being converted to residential and commercial uses will include additional storage and water quality treatment District staff has met with representatives of Coral Springs and Parkland to pursue public outreach and pollution prevention activities Public outreach initiatives for NSID will be developed as part of the ESP POP

6 Everglades Protection Area Tributary Basins Long-Term Plan for Achieving Water Quality Goals Everglades Protection Area Tributary Basins Long-Term Plan for Achieving Water Quality Goals Bc72 NNRC Basin Project Manager: Carlos Adorisio Project Description: A flood impact analysis will be performed to ensure that the basin’s current level of flood protection is maintained if the use of structure G-123 is discontinued

7 Everglades Protection Area Tributary Basins Long-Term Plan for Achieving Water Quality Goals Everglades Protection Area Tributary Basins Long-Term Plan for Achieving Water Quality Goals Bc72 NNRC Basin Project status Work completed to date ØPrepared draft SOW for flood impact analysis Work planned for remainder of FY04 ØPerform flood impact analysis (June thru September 2004)

8 Everglades Protection Area Tributary Basins Long-Term Plan for Achieving Water Quality Goals Everglades Protection Area Tributary Basins Long-Term Plan for Achieving Water Quality Goals Source Controls NNRC Basin

9 Everglades Protection Area Tributary Basins Long-Term Plan for Achieving Water Quality Goals Everglades Protection Area Tributary Basins Long-Term Plan for Achieving Water Quality Goals Source Controls NNRC Basin SFWMD has entered into agreements totaling $100,000 with drainage districts and/or cities to monitor upstream structures and implement appropriate BMPs All drainage districts require renewal of permits for surface water management systems every 5 years BDD’s Landscape contractor follows BMPs for Turf and Landscape PAID will install automated systems at all pump stations PAID will improve road side swales OPWCD will install remote sensing systems that will allow reduced discharges into EPA Public outreach initiatives for the drainage districts and cities within NNRC Basin will be developed as part of the ESP POP

10 Everglades Protection Area Tributary Basins Long-Term Plan for Achieving Water Quality Goals Everglades Protection Area Tributary Basins Long-Term Plan for Achieving Water Quality Goals Bc73 C-11 W Basin Project Manager: Carlos Adorisio Project Description: Assist local communities in developing, evaluating and implementing source controls. Perform feasibility analysis and conceptual design of water quality improvement measures for consideration in the Western C-11 Impoundment PIR. Analysis to include evaluation of potential connection between the Western C-11 Impoundment and the WCA-3A/3B Levee Seepage Management CERP projects.

11 Everglades Protection Area Tributary Basins Long-Term Plan for Achieving Water Quality Goals Everglades Protection Area Tributary Basins Long-Term Plan for Achieving Water Quality Goals Bc73 C-11 W Basin Project status Work completed to date ØDeveloped Draft Public Outreach Plan (POP) ØDeveloped enhanced Know-The-Flow course ØEstablished in conjunction with FDACS Nursery and Equine working groups to develop BMPs

12 Everglades Protection Area Tributary Basins Long-Term Plan for Achieving Water Quality Goals Everglades Protection Area Tributary Basins Long-Term Plan for Achieving Water Quality Goals Bc73 C-11 W Basin Project status Work completed to date (cont’d) ØAwarded contract to perform preliminary evaluation of treatment potential of Western C-11 Impoundment ØInitiated preliminary evaluation of potential connection of 3-A Seepage Management Area (Buffer Area) to Western C-11 Impoundment (work done in-house)

13 Everglades Protection Area Tributary Basins Long-Term Plan for Achieving Water Quality Goals Everglades Protection Area Tributary Basins Long-Term Plan for Achieving Water Quality Goals Bc73 C-11 W Basin Project status Work planned for remainder of FY04 ØDevelop in coordination with Broward County a countywide Turf and Landscape BMP manual (September 2004) ØDevelop Nursery and Equine BMP manuals (September 2004) ØEstablish a Broward County Pollution Prevention Task Force (May 2004) ØFinalize POP (September 2004)

14 Everglades Protection Area Tributary Basins Long-Term Plan for Achieving Water Quality Goals Everglades Protection Area Tributary Basins Long-Term Plan for Achieving Water Quality Goals Bc73 C-11 W Basin Project status Work planned for remainder of FY04 (cont’d) ØComplete preliminary evaluation of treatment potential of Western C-11 Impoundment (March 2004) ØPrepare report with findings of preliminary evaluation of potential connection of Buffer Area to Western C- 11 Impoundment (April 2004)

15 Everglades Protection Area Tributary Basins Long-Term Plan for Achieving Water Quality Goals Everglades Protection Area Tributary Basins Long-Term Plan for Achieving Water Quality Goals Source Controls C-11 W Basin

16 Everglades Protection Area Tributary Basins Long-Term Plan for Achieving Water Quality Goals Everglades Protection Area Tributary Basins Long-Term Plan for Achieving Water Quality Goals Source Controls C-11 W Basin SFWMD has entered into agreements totaling $115,000 with drainage districts to monitor upstream structures, establish public involvement activities and implement appropriate BMPs SFWMD requires (when needed) additional pretreatment facilities/features for new development A Turf and Landscape BMP Manual was developed for the C-11 West Basin SFWMD and CBWCD have posted pollution prevention message signs along the C-11 Canal and CBWCD’s secondary canals CBWCD staff does water quality presentations at local elementary schools All drainage districts require renewal of permits for surface water management systems every 5 years and CBWCD’s engineering requirements include addition of special or more stringent requirements Landscape contractors for ITDD follow BMPs for Turf and Landscape

17 Everglades Protection Area Tributary Basins Long-Term Plan for Achieving Water Quality Goals Everglades Protection Area Tributary Basins Long-Term Plan for Achieving Water Quality Goals Source Controls C-11 W Basin SBDD will install control structures at all discharge points that will provide additional storage and water quality treatment (SFWMD’s CERP division is to contribute $1M) SBDD will modify operation of S-8 pump station to provide additional storage and water quality treatment SFWMD will investigate if ITDD pumping system could provide additional storage and water quality treatment CBWCD is planning to install control structures at all discharge points that will provide additional storage and water quality treatment (SFWMD is requesting a legislative appropriation for $1M in FY05 ) SFWMD will implement a Nursery BMP Grant Program Additional public outreach initiatives for the C-11 West Basin will be developed as part of the ESP POP

18 Everglades Protection Area Tributary Basins Long-Term Plan for Achieving Water Quality Goals Everglades Protection Area Tributary Basins Long-Term Plan for Achieving Water Quality Goals Bc75 Acme Basin B Project Manager: Damon Meiers Project Description: Assist Village of Wellington in developing, evaluating and implementing source controls. CERP directly addresses Acme Basin B as an Other Project Element (OPE)

19 Everglades Protection Area Tributary Basins Long-Term Plan for Achieving Water Quality Goals Everglades Protection Area Tributary Basins Long-Term Plan for Achieving Water Quality Goals Bc75 Acme Basin B Project status Work completed to date ØLTP funding for source controls scheduled to begin in FY05 ØCERP project is in PIR phase with alternatives analysis concentrating on discharging Basin B to STA1-E Work planned for remainder of FY04 ØSFWMD, Wellington and USACE are pursuing schedule for completion of CERP project by the end of 2006

20 Everglades Protection Area Tributary Basins Long-Term Plan for Achieving Water Quality Goals Everglades Protection Area Tributary Basins Long-Term Plan for Achieving Water Quality Goals Source Controls Acme Basin B Cooperative agreement to improve water quality monitoring program throughout Wellington, including autosamplers w/ telemetry at pump stations Cooperative agreement to implement BMPs that led to an ordinance regulating livestock waste storage and hauling and application of low P fertilizer only. Village has dedicated compliance staff for BMP ordinance. Purchase of 374 acres within Section 24 ($4.1 mil) for future use in CERP project as a WQ improvement and environmental feature Enhanced requirements for WQ treatment in ERP applications for Basin B Dedicated SFWMD staff members to oversee increased compliance and enforcement activities in Basin B Cooperative agreement to provide $50,000 for implementation of BMPs Village has implemented WQ and BMP education campaign A canal maintenance program has been revised to include removal of excess vegetation and practices to keep sediments away from canal banks

21 Everglades Protection Area Tributary Basins Long-Term Plan for Achieving Water Quality Goals Everglades Protection Area Tributary Basins Long-Term Plan for Achieving Water Quality Goals Long-Term Plan Update Source Control Projects Carmela Bedregal

22 Everglades Protection Area Tributary Basins Long-Term Plan for Achieving Water Quality Goals Everglades Protection Area Tributary Basins Long-Term Plan for Achieving Water Quality Goals Bc74 Feeder Canal Basin Project Manager: Carmela Bedregal Project Description: Develop and implement a voluntary BMP program in the West Feeder Canal Sub-basin Wingate Mill Canal

23 Everglades Protection Area Tributary Basins Long-Term Plan for Achieving Water Quality Goals Everglades Protection Area Tributary Basins Long-Term Plan for Achieving Water Quality Goals Bc74 Feeder Canal Basin Project status Work completed to date ØDeveloped a BMP Grant Program for all Western Basins, including L-28 (NRCS partner). Milestone: $200K reimbursed for completed projects ØHeld second Western Basins Interagency Working Group meeting to discuss source control WQ improvement strategies Work planned for remainder of FY04 ØContinue monitoring progress of grant projects and sub-basin water quality ØEvaluate additional BMP Grant Program proposals ØOffer BMP workshops

24 Everglades Protection Area Tributary Basins Long-Term Plan for Achieving Water Quality Goals Everglades Protection Area Tributary Basins Long-Term Plan for Achieving Water Quality Goals Bc74 Feeder Canal Basin Concurrent Basin Efforts ØReview SW permits compliance ØUpdate new or modified SW permits conditions to incorporate applicable BMPs ØWorking with North Feeder landowners to implement water management BMPs ØEvaluating alternative WQ improvement projects (e.g., diversion of a portion of L-28 flows) ØOptimization of District structures (PC17A sediment traps)

25 Everglades Protection Area Tributary Basins Long-Term Plan for Achieving Water Quality Goals Everglades Protection Area Tributary Basins Long-Term Plan for Achieving Water Quality Goals Bc81(2) C-139 Basin Project Manager: Carmela Bedregal Project Description: Identify discharges that are candidates for implementation of cost effective source controls Characterize management practices on lands or processes tributary to those discharges Implement these source controls in concert with landowners or municipalities

26 Everglades Protection Area Tributary Basins Long-Term Plan for Achieving Water Quality Goals Everglades Protection Area Tributary Basins Long-Term Plan for Achieving Water Quality Goals Bc81(2) C-139 Basin Project status Work completed to date ØInitiated inspections to verify implementation of rule mandated Level I BMPs ØDeveloped BMP Grant Program for voluntary implementation of BMPs (partnership with NRCS & FDACS) Work planned for remainder of FY04 ØMonitor progress of the grant funded BMP projects ØDevelop and initiate an evaluation for potential regional BMPs ØOffer BMP workshops Concurrent Efforts ØReview Surface Water Permit compliance and update conditions as necessary for new or modified permits

27 Everglades Protection Area Tributary Basins Long-Term Plan for Achieving Water Quality Goals Everglades Protection Area Tributary Basins Long-Term Plan for Achieving Water Quality Goals Bc81(1) EAA Basins Project Manager: Carmela Bedregal Project Description: Identify discharges that are candidates for cost effective implementation of source controls Characterize management practices on lands or processes tributary to those discharges Implement cost effective source controls in concert with landowners or municipalities

28 Everglades Protection Area Tributary Basins Long-Term Plan for Achieving Water Quality Goals Everglades Protection Area Tributary Basins Long-Term Plan for Achieving Water Quality Goals Bc81(1) EAA Basins Project status Work completed to date ØInitiated farm data analysis to identify areas of opportunity ØOn-going BMP Regulatory Program with inspections and reporting requirements ØNRCS funded nutrient and drainage management BMPs Work planned for remainder of FY04 ØContinued analysis of farm level data ØEstablish a technical advisory working group with landowners ØOffer BMP workshops

29 Everglades Protection Area Tributary Basins Long-Term Plan for Achieving Water Quality Goals Everglades Protection Area Tributary Basins Long-Term Plan for Achieving Water Quality Goals Long-Term Plan Update Public Comment