Everglades Protection Area Tributary Basins Long-Term Plan for Achieving Water Quality Goals Everglades Protection Area Tributary Basins Long-Term Plan.

Similar presentations


Presentation on theme: "Everglades Protection Area Tributary Basins Long-Term Plan for Achieving Water Quality Goals Everglades Protection Area Tributary Basins Long-Term Plan."— Presentation transcript:

1 Everglades Protection Area Tributary Basins Long-Term Plan for Achieving Water Quality Goals Everglades Protection Area Tributary Basins Long-Term Plan for Achieving Water Quality Goals Long-Term Plan Update Source Control Projects Non-ECP Basins (ESP Basins) Carlos Adorisio, PE, SFWMD June 1, 2006

2 Everglades Protection Area Tributary Basins Long-Term Plan for Achieving Water Quality Goals Everglades Protection Area Tributary Basins Long-Term Plan for Achieving Water Quality Goals BASINS TRIBUTARY TO THE EVERGLADES

3 Everglades Protection Area Tributary Basins Long-Term Plan for Achieving Water Quality Goals Everglades Protection Area Tributary Basins Long-Term Plan for Achieving Water Quality Goals Long-Term Plan Update Introduction In general, the recommended strategy in the Non-ECP basins is to rely upon source controls and full integration with CERP to achieve water quality standards. In addition to the Non-ECP Permit requirements, Part 3 of the LTP (Pre-2006 Strategies, ESP Basins) defines supplemental strategies and approaches for water quality improvement in discharges from the Non-ECP Basins.

4 Everglades Protection Area Tributary Basins Long-Term Plan for Achieving Water Quality Goals Everglades Protection Area Tributary Basins Long-Term Plan for Achieving Water Quality Goals Source Controls Non-ECP Basins Objectives are to be carried out using an integrated approach balancing four distinct elements: Source Controls Voluntary BMPs Outreach Local BMP Initiatives Regional Initiatives

5 Everglades Protection Area Tributary Basins Long-Term Plan for Achieving Water Quality Goals Everglades Protection Area Tributary Basins Long-Term Plan for Achieving Water Quality Goals Source Controls Non-ECP Basins Source Controls Cooperative agreements - monitoring and implementation of BMPs On-going and/or proposed local capital improvement projects Non-structural BMPs: ØNew permit requirement and/or modification to address water quality concerns ØOperational changes ØPublic outreach - ESP Public Outreach Plan

6 Everglades Protection Area Tributary Basins Long-Term Plan for Achieving Water Quality Goals Everglades Protection Area Tributary Basins Long-Term Plan for Achieving Water Quality Goals Long-Term Plan Update Non-ECP strategies funded under LTP (FYs 04-06) Source controls ØBMP development and implementation: C-11 West and VOW ØBMP Grant program: Feeder Canal Additional analyses ØEnsure no impacts to flood protection: NSID and NNRC ØWater quality improvement measures: C-11 West

7 Everglades Protection Area Tributary Basins Long-Term Plan for Achieving Water Quality Goals Everglades Protection Area Tributary Basins Long-Term Plan for Achieving Water Quality Goals The Broward Everglades Working Group (BEWG) Background - In response to a request from Broward County EPD, LTP recognizes that reduction of phosphorus through source controls (i.e., urban BMPs) is of highest priority to achieve compliance with the phosphorus criterion. LTP Project Description - The SFWMD will assist Broward County in coordinating a county- wide working group to develop a comprehensive pollution prevention plan with specific water quality goals.

8 Everglades Protection Area Tributary Basins Long-Term Plan for Achieving Water Quality Goals Everglades Protection Area Tributary Basins Long-Term Plan for Achieving Water Quality Goals BEWG Accomplishments Stakeholders participated in the identification of various pollution reduction options, with each agency determining where they could contribute. Each party presented an overview of activities underway and to be undertaken in support of the Working Group’s objectives and Everglades Restoration. Activities and commitments of each stakeholder group were compiled as part of C-11 West Basin Pollution Reduction Action Plan (April 2006 Final Report).

9 Everglades Protection Area Tributary Basins Long-Term Plan for Achieving Water Quality Goals Everglades Protection Area Tributary Basins Long-Term Plan for Achieving Water Quality Goals BEWG Final Report http://www.broward.org/waterresources/c_11_pollution_actionplan.pdf

10 Everglades Protection Area Tributary Basins Long-Term Plan for Achieving Water Quality Goals Everglades Protection Area Tributary Basins Long-Term Plan for Achieving Water Quality Goals BEWG Next Steps Maintain momentum through frequent updates with participants, assist partners with implementation, and revise strategy as necessary Measure progress through water quality monitoring Continue partnership between Broward County & SFWMD to develop pollution reduction action plans for the NSID and NNRC basins and to expand outreach and technical support

11 Everglades Protection Area Tributary Basins Long-Term Plan for Achieving Water Quality Goals Everglades Protection Area Tributary Basins Long-Term Plan for Achieving Water Quality Goals C-11 W Basin Source Controls TP range: 16-19 ppb (average: 17 ppb) SFWMD: Ø$2 million to cost share local capital improvement projects ØSBDD and ITDD to modify permits ØStringent requirement for new development CBWCD Outreach: presentations at local elementary schools

12 Everglades Protection Area Tributary Basins Long-Term Plan for Achieving Water Quality Goals Everglades Protection Area Tributary Basins Long-Term Plan for Achieving Water Quality Goals C-11 W Basin - LTP Project Manager: Tjerk van Veen LTP Project Description: Assist local communities in developing, evaluating and implementing source controls Perform feasibility analysis and conceptual design of water quality improvement measures for consideration in the Broward County WPA project

13 Everglades Protection Area Tributary Basins Long-Term Plan for Achieving Water Quality Goals Everglades Protection Area Tributary Basins Long-Term Plan for Achieving Water Quality Goals C-11 W Basin - LTP Project Status Nursery BMP Grant Program - $360,000 since April 2005 Public Outreach – Website, Educational Videos Completed contract for preliminary design of Western C-11 Impoundment modifications to reduce phosphorus loads ØFinal Report (May 12, 2006): http://www.sfwmd.gov/org/erd/longtermplan/documents.shtml

14 Everglades Protection Area Tributary Basins Long-Term Plan for Achieving Water Quality Goals Everglades Protection Area Tributary Basins Long-Term Plan for Achieving Water Quality Goals C-11 W Basin - LTP Work planned for remainder of FY 06 Start 2 nd year of C-11 West Nursery BMP Grant program Continue public outreach activities

15 Everglades Protection Area Tributary Basins Long-Term Plan for Achieving Water Quality Goals Everglades Protection Area Tributary Basins Long-Term Plan for Achieving Water Quality Goals NSID Basin Source Controls TP range: 16-29 ppb (average: 18 ppb) Operational changes implemented by NSID: ØReduced discharges into WCA-2A ØInter-basin transfers of stormwater New development - include additional storage and water quality treatment Renewal of permits every 5 years

16 Everglades Protection Area Tributary Basins Long-Term Plan for Achieving Water Quality Goals Everglades Protection Area Tributary Basins Long-Term Plan for Achieving Water Quality Goals NSID Basin - LTP Project Manager: Jonathan Madden LTP Project Description: Perform a hydraulic evaluation to determine: ØImpacts to the Hillsboro Canal ØProvide additional surface water storage

17 Everglades Protection Area Tributary Basins Long-Term Plan for Achieving Water Quality Goals Everglades Protection Area Tributary Basins Long-Term Plan for Achieving Water Quality Goals NSID Basin - LTP Project Status Hydraulic analysis has been completed Final Report (November 14, 2005): http://www.sfwmd.gov/org/erd/longtermplan /documents.shtml

18 Everglades Protection Area Tributary Basins Long-Term Plan for Achieving Water Quality Goals Everglades Protection Area Tributary Basins Long-Term Plan for Achieving Water Quality Goals NSID Basin - LTP Work planned for remainder of FY 06 Review alternatives on how to proceed based on findings of study Develop pollution reduction action plan through BEWG Monitor and assist in implementation of source controls

19 Everglades Protection Area Tributary Basins Long-Term Plan for Achieving Water Quality Goals Everglades Protection Area Tributary Basins Long-Term Plan for Achieving Water Quality Goals NNRC Basin Source Controls TP range: 13-16 ppb (average: 15 ppb) Operational changes: ØSFWMD (G-123) ØOPWCD BDD’s Landscape contractor - BMPs for Turf and Landscape PAID - program to improve swales Renewal of permits every 5 years

20 Everglades Protection Area Tributary Basins Long-Term Plan for Achieving Water Quality Goals Everglades Protection Area Tributary Basins Long-Term Plan for Achieving Water Quality Goals NNRC Basin - LTP Project Manager: Jonathan Madden LTP Project Description: Perform flood impact analysis to ensure basin’s current level of flood protection is maintained if the use of structure G-123 is discontinued

21 Everglades Protection Area Tributary Basins Long-Term Plan for Achieving Water Quality Goals Everglades Protection Area Tributary Basins Long-Term Plan for Achieving Water Quality Goals NNRC Basin - LTP Project Status Flood impact analysis has been completed Final Report (September 2005): http://www.sfwmd.gov/org/erd/longtermplan/d ocuments.shtml

22 Everglades Protection Area Tributary Basins Long-Term Plan for Achieving Water Quality Goals Everglades Protection Area Tributary Basins Long-Term Plan for Achieving Water Quality Goals NNRC Basin - LTP Work planned for remainder of FY 06 Review alternatives on how to proceed based on findings of flood impact analysis Develop pollution reduction action plan through BEWG Monitor and assist in implementation of source controls

23 Everglades Protection Area Tributary Basins Long-Term Plan for Achieving Water Quality Goals Everglades Protection Area Tributary Basins Long-Term Plan for Achieving Water Quality Goals Village of Wellington Acme Basin B Source Controls TP range: 90-170 ppb (average: 119 ppb) Water quality treatment marsh “Equine Race Track Lake Expansion” Ordinances: Ølivestock waste storage and hauling Øapplication of low P fertilizer Øcompliance staff SFWMD – Basin B: ØStringent permit requirement Øcompliance and enforcement activities

24 Everglades Protection Area Tributary Basins Long-Term Plan for Achieving Water Quality Goals Everglades Protection Area Tributary Basins Long-Term Plan for Achieving Water Quality Goals Village of Wellington Acme Basin B - LTP Project Manager: Jonathan Madden LTP Project Description: Assist Village of Wellington in developing, evaluating and implementing source controls

25 Everglades Protection Area Tributary Basins Long-Term Plan for Achieving Water Quality Goals Everglades Protection Area Tributary Basins Long-Term Plan for Achieving Water Quality Goals Village of Wellington Acme Basin B - LTP Project Status Finalizing FY06 cost-share agreement with VOW to develop, evaluate, and implement additional BMPs

26 Everglades Protection Area Tributary Basins Long-Term Plan for Achieving Water Quality Goals Everglades Protection Area Tributary Basins Long-Term Plan for Achieving Water Quality Goals Village of Wellington Acme Basin B - LTP Work planned for remainder of FY 06 Assist VOW in developing BMP Implementation Plan ØLocate and remove nutrient rich sediment from canal system ØGIS database for BMP ordinance compliance Additional Public Outreach ØUpdate & distribute BMP flyers ØLocal educational videos for television

27 Everglades Protection Area Tributary Basins Long-Term Plan for Achieving Water Quality Goals Everglades Protection Area Tributary Basins Long-Term Plan for Achieving Water Quality Goals Feeder Canal Basin Source Controls TP range: 76-177 ppb (average: 98 ppb) Optimize upstream monitoring network Coordinate with Seminole Tribe Optimize BMPs to comply with water quality requirements Ensure new developments comply with water quality requirements

28 Everglades Protection Area Tributary Basins Long-Term Plan for Achieving Water Quality Goals Everglades Protection Area Tributary Basins Long-Term Plan for Achieving Water Quality Goals Feeder Canal Basin - LTP Project Manager: Hongying Zhao LTP Project Description: Develop and implement a voluntary BMP program in the West Feeder Canal Sub-basin Wingate Mill Canal

29 Everglades Protection Area Tributary Basins Long-Term Plan for Achieving Water Quality Goals Everglades Protection Area Tributary Basins Long-Term Plan for Achieving Water Quality Goals Feeder Canal Basin - LTP Project Status Approximately $580,000 awarded to projects in Feeder Canal Basin Work planned for remainder of FY 06 Continue to monitor implementation of funded BMP projects

30 Everglades Protection Area Tributary Basins Long-Term Plan for Achieving Water Quality Goals Everglades Protection Area Tributary Basins Long-Term Plan for Achieving Water Quality Goals LTP and Non-ECP Permit Other activities planned for remainder of FY06 LTP updates/revisions being considered based on: ØStudies’ findings ØRevised CERP Project Schedules ØUpdated basin flow & TP load estimates Revised LTP funding recommendations for FYs 2007-2010 (currently LTP only allocates funds for Non-ECP projects in FYs 2004-2006) Coordinating development of TBELs for Non-ECP permit compliance with FDEP

31 Everglades Protection Area Tributary Basins Long-Term Plan for Achieving Water Quality Goals Everglades Protection Area Tributary Basins Long-Term Plan for Achieving Water Quality Goals Additional Information Chapter 3: Phosphorus Controls for the Basins Tributary to the Everglades Protection Area http://www.sfwmd.gov/sfer/


Download ppt "Everglades Protection Area Tributary Basins Long-Term Plan for Achieving Water Quality Goals Everglades Protection Area Tributary Basins Long-Term Plan."