State Transportation Agency Design-Build Projects Pre-Construction Process Presented By Iqbal Ahmed P.E Friday May 7, 2004.

Slides:



Advertisements
Similar presentations
Request for Proposals (RFP) Vendor Conference Date:September 18, 2002 Time:1:00 P.M. Location: Agency Training Room Illinois EPA 1021 North Grand Avenue.
Advertisements

Gene Shawcroft, P.E. Central Utah Water Conservancy District April 29-30, 2013.
Multi-Stage Bidding.
© 2005 The Finance Project Module II: Developing a Vision and Results Orientation Oregon 21 st Century Community Learning Center Programs October 2011.
Airport Owner’s Guide to Project Delivery Systems Prepared by: The Joint Committee of ACI-NA, ACC and AGC.
Lunchtime Topics Craig Weise Construction Reform Program Director Lisa Conomy Construction Counsel OSU Office of Legal Affairs.
Government Services How to Respond to a Request for Proposal (RFP) 2006.
Procurement.
Survey Design Steps in Conducting a survey.  There are two basic steps for conducting a survey  Design and Planning  Data Collection.
BA271 Week 9 Lecture This term, week 9 falls on the Memorial Day holiday …
Here are the 7 steps in conducting Barrier Analysis:
O'Leary, Z. (2004) The Essential Guide to Doing Research. London: Sage Chapter Seven1 Methodological Design What’s the best way to design my study?
THE APPLICATION OF VALUE ENGINEERING ON PUBLIC CONSTRUCTION PROJECTS IN SAUDI ARABIA BY: Mohammad Ali Husain Al-Sughaiyer Supervised By: Dr. Saadi Assaf.
Project X RD&D Plan Conventional Facilities (Civil Construction) Russ Alber AAC Meeting February 3, 2009.
WRITING A THESIS Karen M. Olsen. Agenda Finding a topic Requirements of a master thesis - Be prepared – take Methodology for master thesis STR402/405!
This Presentation is a Copyrighted Property of Waller S. Poage, AIA, CSI, MAI, CVS – All Rights are Reserved Session CDT 01 – Fundamentals Lesson CDT 1.3.
COMPLIANCE WITH GRANT IMPLEMENTATION PROCEDURES TxDot Grant Fund Project.
Best Practices Related to Research Problem Identification, Scoping, and Programming: A Researcher’s View Martin Pietrucha, Director The Thomas D. Larson.
Dynamic form generation using a normalized database by Ann Bernstein Twin Cities CFUG September 1, 2004.
Main Achievements in Public Procurement in Ministry of Finance of the Republic of Moldova Public Procurement Agency Batumi, 2015.
Dr. PARICHART PALANANTANA RATTANA BUNDIT UNIVERSITY Study the Readiness and Characteristics of e-Learning for Students at Private Universities in Bangkok.
CVE 4070 Construction Engineering Test-2 & Review Prof. Ralph V. Locurcio, PE.
NEW YORK STATE DEPARTMENT OF TRANSPORTATION Superstructure and Bridge Replacements in Region 9 Design-Build Project (PIN , D900020) Broome, Delaware,
Consultants' Competitive Negotiation Act Acquisition of professional architectural, engineering, landscape architectural, or surveying and mapping.
Gold Ray Dam Removal Today Review RFP process and dates Touch on contract / award issues Review a few key issues as you develop your proposals Provide.
Orange County Transportation Authority Keeping Orange County Moving Construction Management Association of America Southern California Chapter May 27,
NEW YORK STATE DEPARTMENT OF TRANSPORTATION Superstructure and Bridge Replacements in Regions 2 & 9 Design-Build Project (PIN , D900022) Herkimer,
Chapter 6: Getting the Marketing Information We Need.
1 August Accomplishments Conducted the 4 th Urban Design Committee meeting, which consisted of a tour of the Metro Orange Line. Conducted one-on-one briefings.
1 Universal Pre-Kindergarten (UPK) Scope of FY08 Evaluation Activities December 11, 2007.
IAEA International Atomic Energy Agency. IAEA Outline Learning Objectives The Mission Report Purpose and objectives What is not needed? Evolution of the.
 Understanding the nature of the problem  Know the goal of the research  What questions do we wish to answer with this research? Understanding the.
College of Environment Design Construction Engineering Technology Assessment of Constructability Practice Among General Contractors in The Eastern Province.
Teacher Incentive Fund (TIF) Evaluation Services Request for Proposal Pre-Proposal Conference March 9, 2011 Steve Webb, IDOA Strategic Sourcing Analyst.
IAEA International Atomic Energy Agency International peer review on evaluation of nuclear power infrastructure A. Cardoso Department of Technical Cooperation.
Cat 2 Non Experimental Research Projects Day Competition 2009.
Planning your Project Managing your 333T project is like managing any professional project.
The Research Process.  There are 8 stages to the research process.  Each stage is important, but some hold more significance than others.
+ Interview with Kindergarten 2 nd Grade Enrichment.
Common Mistakes in Writing Project Report By: COIT Final Year Project Committee.
Smart Schools Bond Act Investment Plan Submission Information and Review Process Presentation to Regional Partners Hosted By: Capital Region BOCES October.
D.d. delivers district department of transportation d.d. delivers FAISAL HAMEED RONALDO T. NICHOLSON. P.E. Innovative Project Delivery Processes Innovative.
Define Research Problem. 2 Management objectives: –To solve current problem facing company –To improve efficiency –To plan for future Current problems.
Evaluation of Budget Process for Information Technology Projects Proposed Final Report February 16, 2006 Joint Legislative Audit & Review Committee Karen.
ECS 3390University of Texas at Dallas1 Activity: Team Paper Click on the audio symbol below to begin.
Title of your Study Your Name Date of your defense.
CVE 4070 Construction Engineering Course Review Prof. Ralph V. Locurcio, PE.
Key Stage 2 SATs Information and Guidance on the Changes and Expectations for 2015/16 Stafford Leys.
CVE 4070 Construction Engineering Course Review & Critique Prof. Ralph V. Locurcio, PE.
Preparation Plan. Objectives Describe the role and importance of a preparation plan. Describe the key contents of a preparation plan. Identify and discuss.
The Design/Build Contract. What Is A Design/Build Contract? Contract that combines design & construction into one agreement The design/build team provides.
County Road Administration Board th Annual Road Design Conference Local Agency Procurement and Selection Process for Professional.
PUBLIC PROCUREMENT ACHIEVEMENTS IN 2013 CHAPTER 1: INCREASING OF THE NUMBER OF PROCEDURES AND CONTRACTING AUTHORITIES CARRYING OUT PROCUREMENT PROCEDURES.
M O N T E N E G R O Negotiating Team for Accession of Montenegro to the European Union Working Group for Chapter 18 – Statistics Bilateral screening: Chapter.
Small Purchase of Professional Service Providers Administrative Rule R
Lenoir County Public Schools New North Carolina Principal Evaluation Process 2008.
How to analyze your data Deciding which approach to use Analysing qualitative data Analysing quantitative data Measuring data.
1 Strategy for mobilizing funds for agricultural census – Tanzania Experience By Lubili Marco Gambamala National Bureau of Statistics 97.7% of smallholder.
Page 1 This is page one. I’m talking about it now….
Presentation by ET Marchak Consulting November 30, :45 pm – 3:00 pm.
STRATEGIC SOURCING SUMMARY
TRAVEL SERVICES Request for Proposal
Phase 2 Tollgate Review Discussion Template
THE WASHINGTON METROPOLITAN AREA TRANSIT AUTHORITY
Phase 2 Tollgate Review Discussion Template
Phase 1 Tollgate Review Discussion Template
PROJECT DELIVERY METHODS
Phase 2 Tollgate Review Discussion Template
Group Assignment and Individual Presentation
Information and Guidance on Expectations
Presentation transcript:

State Transportation Agency Design-Build Projects Pre-Construction Process Presented By Iqbal Ahmed P.E Friday May 7, 2004

Problem :  Pre-Construction Process:  To identify whether the present Pre-Construction Process is effective and adequate for the successful completion of D-B Projects as expected  Scoping  Preliminary Engineering  Procurement  Award of Contract

Objective :  To address the following: 1. What is encouraging the transportation agencies to use D-B Projects? 2. What are the different elements of pre-construction process and how they are related to successful completion of the D-B project 3. How effective and adequate is the present pre-construction process for D-B projects to achieve the desired results?

Methodology:  Research of the available materials and information  Interviews with D-B Project’s Managers locally  May conduct survey at later stage if decided to do so  Will try to answer the questions as mentioned in Objectives

Status of the Report  Until now- Abstract-completed & submitted  Collected some references, submitted 5  Interviewed two Project Managers  Planned to do- research for more references and information  Plan to talk to more PM  The final report will have 5 chapters and will be 40+ pages long.