FAA - NASA Workshop on Composite Material Control August 6-8 2002 Embassy Suites - Rosemont Chicago, Il 1.

Slides:



Advertisements
Similar presentations
ANNOUNCEMENTS Please any technical issues to CHANGE OF LOCATION: – Days 1 and 2 will now BOTH be held at the Washington DC.
Advertisements

Ninth Lecture Hour 8:30 – 9:20 pm, Thursday, September 13
Introduction to Strategic Planning Goals, Mission, and Vision Marc Compeau and Mike Wasserman Wednesday, 6/23/04.
PCI Compliance Roundtable Update Presented by the PCI Compliance Task Force.
Enterprise Security A Framework For Tomorrow Christopher P. Buse, CPA, CISA, CISSP Chief Information Security Officer State of Minnesota.
ISO 9001 : 2000.
How to Document A Business Management System
ISHIKAWA DIAGRAM – Tool for quality management Marit Laos IS Project Management
Federal Aviation Administration Commercial Space Transportation Human Space Flight Occupant Safety Telecon Telecon 7 – Medical Guidance for Crew & Spaceflight.
AT- FAA / NASA WORKSHOP ON KEY CHARACTERISTICS FOR COMPOSITE MATERIAL CONTROL Cirrus Design Industry Review August 6 th, /02.
FAA Workshop on Key Characteristics for Advanced Material Control
Review of Workshop Goals and Accomplishments. Workshop Objectives The objectives of this workshop are to: –Review the results and recommendations of this.
1 2 nd FAA Workshop on Composite Material Control September 16-18, 2003 Westin O’Hare Chicago, Il.
FAA Regulatory Policy for Composite Material Control Presented at 8/8/02 FAA/NASA Workshop (Chicago, IL) Introduction – Importance of stabilizing composite.
FAA FAA Advisory Circular Presented at 9/16/03 Workshop (Chicago, IL) Background – Purpose of the advisory circular – Related regulations & guidance materials.
FAA/NASA Workshop on Composite Material Control Mark Freisthler Allen Fawcett Rod Osborne August 2002.
Innovation Leadership Training Day One February 5, 2009.
Building and Sustaining Total Quality Organizations
FAA/NASA Workshop on Key Characteristic's for Composite Material Control Chicago, IL Cytec Engineered Materials August 6th 2002.
Composite Material Control FAA Efforts in 2002 Curtis R. Davies FAA William J. Hughes Technical Center Atlantic City International Airport, NJ 2nd FAA.
FAA/NASA Meeting on Industry Composite Specifications August 2002 FAA Report on Proposed Industry Prepreg Specifications Ric Abbott Abbott Aerospace Composites.
SUCCESSION PLANNING OVERVIEW
Welcome to… Planning for Emergencies – For Small Business –
Session 6: Data Integrity and Inspection of e-Clinical Computerized Systems May 15, 2011 | Beijing, China Kim Nitahara Principal Consultant and CEO META.
Internal Auditing and Outsourcing
IOSH Webinar Roadmapping Workshops Darryl Hopper 2 nd October 2013.
Certificate IV in Project Management Project Management Environment Course Number Qualification Code BSB41507.
D-1 McGraw-Hill/Irwin ©2005 by the McGraw-Hill Companies, Inc. All rights reserved. Module D Internal, Governmental, and Fraud Audits “I predict that audit.
Presented to: By: Date: Federal Aviation Administration WELCOME Runway Condition Determination, Reporting, and Report Dissemination Workshop Presentation.
ISO 9000 and Public Awareness and Information Session 22 February 2006 Owen Glave, MBA-TQM.
Welcome To the Objectives Pillar Workshop Introduction Business need Target Audience - technical and professional staff who support decision maker.
STRATEGIC PLAN Tennessee Department of Education School Team Training Series Opening Session – Literacy June 2014.
MARPA and You Working Together to Make PMA Successful March 31, 2011 Gorham Conference 1 Modification and Replacement Parts Association (MARPA)
Quote for today “Sometimes the questions are complicated and the answers are simple” - ?? ????? “Sometimes the questions are complicated and the answers.
Building Leadership Teams
Welcome & Overview Brian Cason Chief Operating Officer Blue Horseshoe
California Air Resources Board Workshop November 3, th Street, Room 202 1:30 - 3:30 p.m. Aboveground Storage Tank Enhanced Vapor Recovery.
CERTIFICATION In the Electronics Recycling Industry © 2007 IAER Web Site - -
DOT/FAA/AR- 02/109 Guidelines and Recommended Criteria for the Development of a Material Specification For Carbon Fiber/Epoxy Unidirectional Prepregs Overview.
Executive Session Director’s CD-3b Review of the MicroBooNE Project January 18, 2012 Dean Hoffer.
Supply Chain Risk Leadership Council 1 SCRLC August Supply Chain Risk Leadership Council August 2009 Meeting.
2014 Reports to the Minister Markets Team Ken Michael Room, 25 September 2014 Ensuring quality services for a reasonable price 1 Workshop.
Principles of Accreditation Dr. Claude Pressnell TICUA, Nashville, Tennessee.
Overview The Conference is specifically targeted at process engineers, technical managers, and product design engineers in the medical-device industry,
Welcome to Session 3 – Project Management Process Overview
The Balanced Score Card
1 Chapter 3 1.Quality Management, 2.Software Cost Estimation 3.Process Improvement.
Copyright  2005 McGraw-Hill Australia Pty Ltd PPTs t/a Australian Human Resources Management by Jeremy Seward and Tim Dein Slides prepared by Michelle.
Copyright © 2013 by The McGraw-Hill Companies, Inc. All rights reserved.McGraw-Hill/Irwin.
Federal Aviation Administration Commercial Space Transportation Human Space Flight Occupant Safety Telecon Telecon #3 – Types of Requirements and Guidance.
Office of Pipeline Safety Hazardous Liquid Pipeline Integrity Management July , 2002 Houston, Texas Welcome.
The Second Annual Medical Device Regulatory, Reimbursement and Compliance Congress Presented by J. Glenn George Thursday, March 29, 2007 Day II – Track.
Better regulation workshop Economic benchmarking inputs.
December Why Program-for-Results (PforR)? Development Effectiveness and Client Demand – PforR responds to client demand that could not be fully.
DOCUMENTATION ISO/IEC 17025:2005 Documentation.
How Good are you at Managing your Processes? Operational Excellence.
The Project Management Process Groups
Business Continuity Planning 101
Query Health Operations Workgroup Standards & Interoperability (S&I) Framework October 13, :00am – 12:00pm ET.
Stress Corrosion Cracking Technical Workshop Office of Pipeline Safety Research and Special Programs Administration SCC Workshop December 2, 2003 Houston,
Executive Session Director’s Conceptual Design Review of Mu2e Project May 3-5, 2011 Jim Yeck.
1 The Top Ten Tools Every Subcontract Manager Needs Breakout Session # A15 Name: Jim W. Kirlin Date: July 30, 2012 Time: 11:15 a.m. – 12:30 p.m.
Learning Objective Chapter 12 Using Reports and Proposals Copyright © 2001 South-Western College Publishing Co. Objectives O U T L I N E Types of Reports.
ISO 14001:2004 Clause 4.3 Planning. Clause 4.3 Planning Key Requirements of Environmental Management System Certification.
Software Quality Control and Quality Assurance: Introduction
Barriers to TQM Lack of Management Commitment Misunderstanding about TQM Concept Improper planning Lack of employees commitment.
Public Libraries and Access to Justice: Introduction
Importance of Standardization James Hammond, Standards Division
Measuring What Matters
Trending Requirements and Results
Presentation transcript:

FAA - NASA Workshop on Composite Material Control August Embassy Suites - Rosemont Chicago, Il 1

2 Welcome  Thanks you for taking time from your summer activities to support this effort  We appreciate the time each of you has spent on looking at the documents and preparing for the workshop.

3 Balancing Needs  Interested Parties √Customers, Current & Potential - material quality √Testing Labs - standardization of test methods √Regulators - compliance with regulations √Manufacturers - financial returns Standardization Customers Manufacturers Testing Labs Regulatory Agencies

4 Specifications/Standards  Past  Little or no improvement in material performance. Meeting requirements was simply a “badge of the wall.”  Development did not involve all interested parties.  Insufficient return on investment or no business advantage.  Future √Material exceeds interested parties expectations. Meeting requirements means continual improvement. √All interested parties share common values, culture of trust & empowerment. √Customer loyalty, retention of market share gain.

5 Specifications/Standards  Past  Quality Assurance was a post activity event, focused on inspection & test after product was made.  Quality Assurance acted as a regulator to control the supply of material. Sorted good products from bad & authorized release of only good product.  Collection of data.  Future √Quality Control focus on preventing failures during the process. √Quality Control reviews key processes [e.i. Last 3 months of data] to establish if the process/material properties are stable. √Collection of data for a purpose.

6 Vision of Composites Control  Current state of the art –What we can do now –Best Practice  Short term improvements –Two to five years to accomplish –Current investigated new techniques  Long term improvements –Ten years + –Focused research to develop identified and yet to be discovered characteristics and techniques

7 Workshop Objectives  The objectives of this workshop are to: –Review the results and recommendations of this FAA sponsored research on material procurement and material processing specifications. –Assess current industry practice and recommended FAA directions for shared specifications and databases. –Recommend further research activities where current quality assurance methods and techniques do not achieve a desired degree of composite materials reliability.

8 Review the results and recommendations of this FAA sponsored research on material procurement and material processing specifications.  This Afternoon we will review and critique the documents.  Each author will discuss the philosophy and technical details of their document  A team of reviewers will give the workshop a view of the documents from their perspective.  We have selected a diverse group of reviewers to get a broad view of these documents including suppliers, OEMs and regulators.

9 Assess current industry practice and recommended FAA directions for shared specifications and databases.  On Wednesday – We will divide into two groups to allow discussion on each document  Material Procurement Criteria  Material Processing Criteria –These discussions will be summarized at the end of the morning. –We will then as a group review key discussion areas developed in the morning breakout sessions.  Thursday –Develop the comments and criteria into useable actions. We will also discuss extension of these criteria to other processing techniques. –Application of the control principles to new processing techniques.

10 Recommend further research activities where current quality assurance methods and techniques do not achieve a desired degree of composite materials reliability.  On Thursday we will explore the areas of composite control which are not well defined. –Identify current QC techniques that need improvement. –Determination of key characteristics that define an acceptable product. –New techniques and procedures that will give the level of control and repeatability of a metallic material

11 Operating Procedures for the Workshop  Please refrain from interrupting the presentations today. We have provided ample time for discussion. (A full day)  Please wait to be recognized before asking questions or making comments.  We will take a short five to ten minute break each hour.  Each morning and afternoon there will be a refreshment break.  A sponsored lunch is being held tomorrow in this room.

12 Refreshment Breaks  Tuesday Afternoon –3:30 PM  Wednesday –9:30 AM –3:00 PM  Thursday –10:00 AM

13 Tuesday Afternoon  Introduction  Address by FAA Composites NRS Address by FAA Composites NRS Address by FAA Composites NRS  Shared Databases Shared Databases Shared Databases –Steve Ward  Material Procurement Criteria Material Procurement Criteria Material Procurement Criteria –Will McCarvill  Material Processing Criteria Material Processing Criteria Material Processing Criteria –Gregg Bogucki  Industry Reviewers –13 Reviews from cross-section of stakeholders –Rich Moulton, Dan Ruffner, Larry Coulter, Ric Abbott, Molly Stone, Cindy Cole, Mark Chris, John Adelmann, Steve Peake, Sam Tiam, Mike Stuart, Cecil Schneider Dan RuffnerLarry CoulterRic AbbottMolly Stone Cindy ColeMark ChrisJohn AdelmannSteve Peake Mike StuartCecil SchneiderDan RuffnerLarry CoulterRic AbbottMolly Stone Cindy ColeMark ChrisJohn AdelmannSteve Peake Mike StuartCecil Schneider

14 Questionnaires  The following 2 questionnaires are concerned with information requirements for developing material, part fabrication and processing specifications/standards. E - Information Requirements for Creating Material Specifications F - Information Requirement for Creating Part Fabrication & Processing Specifications

15 Wednesday Afternoon Agenda   1:30 Review of Group A&B Discussions   2:45 Economic Issues (E)   3:30 Time Monitoring for Stability& Linkage between Database and Specifications (TM/DL)   4:45 Specification Oversight (Approval&Monitoring)(SO)

16 Thursday Agenda   8:00 – –Current Material Focus- Review of Current State of the Art Identification of Research Needs   8:45 – –Other Product Forms Focus- Review of Current State of the Art Identification of Research Needs   10:30 – –Identification of Needs   10:50 – –Regulatory Policy on Criteria for Material Procurement & Processing   11:30 – –Wrap Up   11:45Adjournment

17 Questionnaires  The following 4 questionnaires are concerned with information requirements for material acceptance into a shared database. A - Testing & Documentation Requirements for Cured Material/Resin Properties B - Testing & Documentation Requirements for Uncured Material Properties C - Information and Recommended Practices for Part Fabrication, Personnel, Processing & Inspection D - Test Coupon Fabrication & Test Conditions

18 Comment Return  John Tomblin –Attn: FAA/NASA Workshop –1845 N. Fairmount –Wichita, KS  Comments to: –Subject: FAA/NASA Workshop