MODERN VENTURES (Pty)Ltd t/a NORTHERN GATEWAY CITY PORTION 2 OF 36-NQ

Slides:



Advertisements
Similar presentations
July 19, Horizon West Area 28,000 Gross Acres Six (6) Planned Villages / Communities Includes one (1) Town Center ~41,000 Planned Households.
Advertisements

Urban Land Use Industry category Canadas Industries.
Welcome Neighbors! Public Meeting for Proposed Rezoning The area bordered by the Alley above 3 rd Street to the Alley below 3 rd Street, between North.
The Liberty District Workshop Sacred Cowshands off! Significant historic structures Mildred Terry Library The Liberty Theater Places of Worship Ma Rainey.
North-East Columbia Sub-Area Plan May 20 Informational Sharing and Gathering.
Board of County Commissioners November 19, Study Area CR-491 Corridor Planning Study Planning and Development Department.
Twinbrook Sector Plan A New Community in the Technology Corridor
Amateur Sports Development at Bojangles Coliseum & Ovens Auditorium June 5, 2014 Economic Development & Global Competitiveness Committee.
1 An Introduction to Edinburgh Waterfront Alison Kirkwood Majors Waterfront Team Manager City of Edinburgh Council Waterfront Regeneration Seminar 3 9.
Planning Commission Public Hearing October 15, 2009.
City of Fitchburg, WISAA Design Group + Teska +Montgomery NORTH STONER PRAIRIE NEIGHBORHOOD PLAN Steering Committee Workshop: Plan Vision, Principles,
SITE 1 SITE 2 Site 3 Site 4 SITE 5 Selection of Site -fairly level with good quality of soil. - connected by roads -good communication facilities.
Urban Land Use (chapter 21)
 FRLP Proposed Boundary Line Adjustment: Confluence Virginia What life have you if you have not life together? There is no life.
Urban More than 100 people living together in a city or town City Group of more than people can be considered a city Metropolitan Area A large.
1 URBAN PLANNING PROCESS AND MASTER PLANNING Prof. Dr. S. Shabih-ul-Hassan Zaidi B.Sc. CRP (UET, LHR); M.Sc. HSP (AIT, Bangkok); Ph.D. URP (Birmingham.
Meeting I Development Plan Health Stakeholder Group.
Master Plan Update Chapter 213 of the Local Government Code provides that Cities may engage in Comprehensive Planning which may:  include but not be limited.
August 2004 Hickory by Choice Linking Land Use and Air Quality Planning.
Overview Public Private Partnerships (P3) September 30, 2014.
May 24, 2008PalmRidge Park A Mixed-Use Real Estate Property for Sale in McAllen, TX.
Old Corvallis Road Urban Renewal Program An Overview May 4 th, 2009.
FORMULATION OF KWADUKUZA LAND USE SCHEME. CONTENT 1. KWADUKUZA OVERVIEW 2. LUMS BACKGROUND 3. CHALLENGES 4. PROCESS 5. SDF CONTEXT 6. KEY PROPOSALS 7.
Implementing the Freeland Subarea Plan Zoning and Development Regulations Island County Planning & Community Development 2016 Comprehensive Plan Update.
Land Use Study for the Community of Winchester July 9, 2012.
Welcome. Challenges  Overcoming perceptions, some real, that  Gardner is not open for business  We aren’t consistent in the application of our codes.
 Part 2: Community Design: Respect and Care for the Natural Environment Joe Duggan 1.
PREPARATION OF PERSPECTIVE PLAN FOR
Afghanistan National Railway Plan and Way Forward
Urban Sprawl Where Will It End?.
A NEW AMERICAN UNIVERSITY Comprehensive Development Plan Tempe City Council
Official Plan Zoning Bylaw Land Uses
Replace with appropriate image in View > Master. Blatchford Redevelopment.
Comprehensive Plan Advisory Panel September 19, 2007.
 FRLP Proposed Boundary Line Adjustment: Confluence Virginia What life have you if you have not life together? There is no life.
COMMERCIAL BUILDING - SRINAGAR COLONY MAIN ROAD Proposal.
Community Development Department FUTURE LAND USE MAP AMENDMENT SMALL-SCALE LU-MIN & ZONING MAP AMENDMENT RZ-OTH
NOVEMBER 19, 2015 STUDY SESSION R IDGEFIELD J UNCTION S UBAREA P LAN DRAFT NOVEMBER 2015.
Organization Chart of Department of Public Works and Town & Country Planning (DPT) Director - General Internal Audit Unit Deputy Director - General Office.
Railroad Ave eBART Station Area Specific Plan TOD MarketPlace, September 29, 2006 C I T Y O F P I T T S B U R G.
BRIEFING PORTFOLIO COMMITTEE HOUSING Parliament Cape Town 11 June 2003 MMC Clr S.S. Dlamini SEO Mr N. Pillay.
Core Strategy Dublin City Development Plan
EASTSIDE ACTIVITY CENTER DRAFT MASTER PLAN Board of County Commissioners January 22, 2008.
Community Development Department FUTURE LAND USE MAP AMENDMENT LU-MIN & RZ-OTH
URBAN SETTLEMENTS DEVELOPMENT GRANT CITY OF JOHANNESBURG REPORT ON PROGRESS PORTFOLIO COMMITTEE ON HUMAN SETTLEMENTS – 12 SEPTEMBER 2012.
EASTSIDE ACTIVITY CENTER MASTER PLAN PROPOSED COMPREHENSIVE PLAN AMENDMENT CPA Board of County Commissioners Hearing May 13, 2008.
City of Redmond: Northwest Redmond & U.S. Highway 97 Plan - October 11, 2006 What Makes a Great Neighborhood.
ITEM 9B Authorize a Commercial Developer Agreement with Keller Watermere, L.P., for South Village at Watermere, located south of West Southlake Boulevard.
Complete Streets Training Module 4a – Understanding Context.
August 8, :30 p.m-8:00 p.m. City Hall.  Board of Mayor and Commissioners (BOMC)  Avondale Estates Citizens, Property and Business Owners-Including.
Planning & Community Development Department Olivewood Village Project (530, 535 E. Union St., 95, 99, 119 N. Madison Ave. and 585 E. Colorado Blvd.) Predevelopment.
1. Initiator and goals of the project Initiator of the project – the Investment Promotion Agency of Novosibirsk region – a specialized organization for.
TIF 9 (Trinity River Vision) Expansion and Updated Project and Financing Plans Jay Chapa, Director Housing and Economic Development.
South Shoreline Specific Plan & Program EIR Request for Qualifications
planning and zoning committee presentation September 19, 2016
P R O J E C T S I N T R O D U C T I O N
L Zone Delhi.
Directions MUST BE DONE IN PENCIL ( Use the large sheet of butcher paper provided 18 x 24 inches) Label North, East, South, and West on the Map. Size of.
General Plan Adoption Follow-up
Syllabus – Land Management
Development Charge Public Meeting October 23, 2017
January 2016 December 2017 July 2015 June October 2014 Commencement of first contracts and site construction December 2017 Grand openning.
Urban Land Use (chapter 21)
ROOSEVELT CITY GENERAL PLAN 2010
Planning Commission Meeting: August 3, 2016
Urban Form & Structure of Residential Area in Duhok
Urban Land Use (chapter 21)
Official Plan and Zoning By-law Amendment Application
FRLP Proposed Boundary Line Adjustment: Confluence Virginia
Greening of MPSEZ, Naidupeta
Presentation transcript:

MODERN VENTURES (Pty)Ltd t/a NORTHERN GATEWAY CITY PORTION 2 OF 36-NQ FRANCISTOWN - BOTSWANA August 2014

INTRODUCTION Northern Gateway City is a private development in the Greater Francistown area, 3.2km from the city of Francistown approved with consent No. DTRP. 330/211 in May 26th , 2011. It covers a total area of 946.5ha, subdivided into 5287 plots for different land uses and activities including. 4896 residential plots 53 commercial plots 35 industrial plots 34 civic and community plots 31 housing estates and cluster housing plots 3 mixed use plots The Golf Course Open spaces

OVERVIEW OF THE PROJECT BRIEF BACKGROUND The subdivision of portion 2 36-NQ was based on the structure plan for the freehold farms surrounding Francistown, which was approved by the TCPB on 11th October 2010. The proposed Northern Gateway City is a self contained urban development neighborhood providing the following values. Well integrated planned and serviced residential areas Coordinated hierarchical commercial clusters Working areas in office and industrial parks Community services well accessible and within reach Recreational and sporting facilities Hotels and lodges

PROJECT LOCATION Regionally; The site is located about 450km from Gaborone, 470km from Maun and 80km from the Zimbabwean boarder. Administratively the area is located in the North East District. Accessibility The primary accesses to the project area is the Matsiloje road connecting the eastern part of Francistown to the City. Its a Primary road in Bitumen standard crossing the project area from east to west. A by pass road from A1 will also provide north-south accessibility to the Northern Gate way city on its eastern side

Project Area in Greater Francistown Planning Area.

PROPOSED DEVELOPMENTS AND LAND USE

Proposed Land Use Provisions Residential Low cost 500m²- 600m² Medium income 600- 800m² High income 800m²- 1000 m² High income (bigger plots) 1000m²- 1400 m² Housing estates Town houses Commercial Central Commercial Area Local Centers Commercial plots (for various uses within the residential blocks) Office park Offices Petrol Filling Station Hotel Transport interchange (Bus Rank)

Table 2.1: Proposed Land Use Provision Cont’d Industrial Light industrial plots Heavy Industrial Plots Show rooms Ware house Open Space Plots have been provided for both active and passive open space Golf course Civic and Community Amenities Government Offices Places of Public Worship Primary and pre-primary Junior school Senior secondary school Tertiary institution Other civic and community Cemetery Road network and other Infrastructure Provided in accordance with prescribed hierarchical standards

Project Phased Developments Identification of residential areas within the project area is done according to the blocks. This will facilitate phased development of the project area and proper identification of the areas in the long run. Blocks in the project area

Table 2.2 Land Use Allocation Plot Size (m2) Total Plots Average Plot sizes (m2) Total areas (m2) Plots facing Golf Course   600-800 17 800 13,600.00 800-1000 76 1000 76,000.00 Above 1000 81 1450 117,450.00 Total Residential Plots 174 Housing Estate 4 69,300.00 Commercial 2 53,000.00 Total 180 329,350.00

Plots in the Golf area   600-800 82 800 65,600.00 800-1000 860 1000 860,000.00 Above 1000 43 1450 62,350.00 Total Residential Plots 985 Housing 10 216,700.00 Commercial 15 169,000.00 Civic &Com 8 891,000.00 Industrial 3 412,000.00 Total 1021 2,676,650.00

Block A   500-600 339 550 186,450.00 600-800 112 800 89,600.00 800-1000 162 1000 162,000.00 Total Residential Plots 613 Housing 7 192,000.00 Commercial 3 14,900.00 Civic &Com 18,000.00 Total 626 662,950.00

Block B   500-600 217 550 119,350.00 600-800 31 700 21,700.00 800-1000 66 1000 66,000.00 Total Residential Plots 314 Housing 4 66,100.00 Commercial 11 194,300.00 Civic &Com 14 206,800.00 Industrial 42 131,700.00 Total 385 805,950.00

Block C   500-600 420 600 252,000.00 600-800 26 750 19,500.00 Total Residential Plots 446 Housing 2 49,000.00 Commercial 12 312,000.00 Civic &Com 7 121,800.00 Total 467 754,300.00

Block D   600-800 32 750 24,000.00 800-1000 262 1000 262,000.00 Total Residential Plots 294 Commercial 1 9,700.00 Civic &Com 5,000.00 Total 296 300,700.00

Block E   500-600 185 600 111,000.00 600-800 92 750 69,000.00 800-1000 12 1000 12,000.00 Total Residential Plots 289 Civic &Com 2 92,000.00 Total 291 284,000.00

Block F   500-600 206 600 123,600.00 800-1000 19 1000 19,000.00 Total Residential Plots 225 Housing 1 8,000.00 Commercial 7,200.00 Civic &Com 7,000.00 Total 228 164,800.00

Block G   500-600 474 550 260,700.00 600-800 10 750 7,500.00 800-1000 38 1000 38,000.00 Total Residential Plots 522 Housing 2 33,000.00 Civic &Com 3 15,000.00 Total 527 354,200.00

Block H   500-600 592 570 337,440.00 600-800 52 700 36,400.00 800-1000 97 1000 97,000.00 Total Residential Plots 741 Housing 1 11,700.00 Commercial 6 14,200.00 Civic &Com 4 17,600.00 Total 752 514,340.00

Block I   500- 600 160 570 91,200.00 800-1000 103 1000 103,000.00 Total Residential Plots 263 Housing 1 41,000.00 Commercial 2 14,100.00 Total 266 249,300.00 Grand Totals 5039

Projects Progress to date. Designs and Reports Detailed Layout is complete and approved EIA is complete and approved Surveying work is completed on site Infrastructure designs are at an advanced stage of completion, September 14 Site works and Material sources All road servitudes are opened and accessible Site office and stock piling areas identified Quarry established and functional Sand available and sources established Next Step: Construction of roads and all other services expected OCT 14

INFRASTRUCTURE AND UTILITIES Roads Road network has the following hierarchy primary distributors (national) - 61m primary distributor (local) - 30m secondary distributors- 20m tertiary distributors - 18m, and access roads - 15m Servitude -Utilities All roads will carry all other services along the road reserves including. Water Electricity Storm water drains Telephone and Sewer lines

THANK YOU!!