Pranahita – Chevella Project PHASE - II

Slides:



Advertisements
Similar presentations
1 PROJECT PROFILE : Lining of TGP Canal from KM to KM (Up to Kurnool – Kadapa Border) etc. 2No. of Packages:6 (2 EPC + 4 Old Packages) 3Agreement.
Advertisements

Alternative Proposal for Polavaram Project M Dharma Rao Chief Engineer (Retd) Vivekananda Seva Samithi (VIKASA) Hyderabad Karimnagar WIN – WIN SOLUTION.
Special officers meeting Dt: Progress plantations S.NoDistrict Pit diggingPlanting* Balance Acres 1Chittoor28,49920,6677,833 2Cuddapah17,18110,2336,948.
Society for Elimination of Rural Poverty Impact Assessment –General profile of Respondents.
PRESENTATION ON MANGLA DAM MADE BY: SYED ALI ZULQADAR. ROLL NO: 37.MAJOR: SES 5 th.
WELCOME PROJECT DIRECTORS, APDs and ACs – DRDA & PRESIDENTS – ZS Society for Elimination of Rural Poverty Review Meeting Feb 2014.
rd International Commission on Irrigation and Drainage, Executive Council Meeting, 7 th Asian Regional Conference And Irrigation Australia 2012.
REVIEW ON NREGS – AP BY Hon’ble Chief Minister Date
SRIPADASAGAR PROJECT (YELLAMPALLY PROJECT)
Photo: David Brazier/IWMI Photo :Tom van Cakenberghe/IWMI Water for a food-secure world K.Palanisami 30/07/ rd International conference.
Social Security Pensions. Objective Coverage of all BPL persons ( White Ration Card holders) under OAP (>=65 Yrs), Weavers, Toddy Tappers (>=50 Yrs),
(POLAVARAM) (Head Works)
Company LOGO Jawahar Knowledge Centers Campus Placement Mission Human Resource Division Institute for Electronic Governance IT&C Department, Government.
TADIPUDI LIFT IRRIGATION SCHEME
ALISAGAR LIFT IRRIGATION SCHEME – 2 years period
E G M M. Reports for PD's Conference on Index Sl. NoReportPage no. 1 District wise over-all training achievement1 2 District wise Placement.
PEDDAGEDDA PROJECT Project cost : Crores Ayacut : Acres
PUSHKARA LIFT IRRIGATION SCHEME (2 years period)
1 Mid Day Meal Scheme Ministry of HRD Government of India PAB-MDM Meeting – Telangana on
HANDRI NIVA SUJALA SRAVANTHI (IRRIGATION SCHEME) (1.98 LAKH ACRES)
M.K. VERMA Chief Engineer ( Civil) BSNL Civil AP Zone, Hyderabad.
GOVERNMENT OF ANDHRA PRADESH
GNSS PROJECT (PHASE-I)
LEFT LINK CHANNEL 540M RIGHT LINK CHANNEL 210 M LEFT HEAD SLUICE RIGHT HEAD SLUICE PROPOSED RIGHT MAIN CANAL 1,20,000 ACRES Km Km LEFT.
VELIGONDA PROJECT 1. Teegalem Canal (48.15 km) 62,000 Ac
PULICHINTALA PROJECT NSP Reservoir Barrage Halia Musi Paleru Munneru
赴国际水稻所访学情况汇报 长江大学农学院 邢丹英 2010 年 6 月. 学习目的 学习时间、地点 学习内容 学习收获 几点体会 汇报提纲.
SUCCESS STORIES GHATGAON PANCHAYAT SAMITI Dist-KEONJHAR.
30Nos. Distributaries under the 3 canals are in progress and are to be completed by 3/2006. Lining works for all 3 Main Canals proposed in package 94,
FOCUS OF AGROMETEOROLOGICAL RESEARCH IN ANGRAU Dr. D. Raji Reddy Principal Scientist (Agrometeorology) Agrometeorology Cell, Agricultural Research Institute.
(Water Availability : 57.50TMC, Ayacut proposed: 2,55,510Acs)
PHASE – I & PHASE - II.
Under execution YELLUR BALANCING RESERVOIR EXISTING SINGOTAM RESERVOIR
PACKAGE 22PACKAGE 23 Total Ayacut under this scheme: 50,250 Ac. KOILSAGAR LIFT IRRIGATION SCHEME, MAHABOOBNAGAR DISTRICT (FLOW DIAGRAM) Approach channel.
Vision "To achieve a poverty free, knowledge driven and thus an economically empowered society"
9 th National Food Security Mission Executive Committee Meeting Department of Agriculture Andhra Pradesh 1 On at 11:00 AM in ICAR Committee.
1 Institute of Energy & Gia Lam Joint Stock Company Development of Krong Pa 2 and implementation issues Dissemination and Training workshop Hanoi December.
ANNUAL ACTION PLAN STATE HORTICULTURE MISSION ANDHRA PRADESH.
1 VENKATANAGARAM PUMPING SCHEME. 2 LOCATION OF THE PROJECT  At Km of Akhanda Godavari Left Bank  Longitude 81°- 35’ – 56” E  Latitude 17°- 8’
DISTRIBUTORIES (D19, D22, D25, D37, D39, D40 TO D55) CONSTRUCTION OF WHOLE DISTRIBUTORY SYSTEM, CM & CD WORKS AND MICRO NETWORK (FIELD CHANNELS) The main.
SRI RAMA SAGAR PROJECT STAGE-II
TELUGU GANGA PROJECT (2 years period)
1 Project Profile : Lifting of 20 tmc of water from foreshore of PJP and Ookachettivagu Project Pondage 2 Administrative Sanction : G. O. Ms. No. 166,
Demerger of Telangana with Andhra Pradesh Water resources management: Issues and solutions 13th August 2013 Biksham Gujja,
SRI RAMATHEERTHAM BALANCING RESERVOIR NAGARJUNASAGAR RESERVOIR KRISHNA RIVER ONGOLE NAGARJUNASAGAR RIGHT MAIN CANAL ONGOLE BRANCH CANAL RAMATHEERTHAM BALNCING.
CHINA TUMBALAM TANK (Existing) DUDDI LI SCHEME DUDDI RESERVOIR (New) BASALA DODDI LI SCHEME MADHAAVARAM LI SCHEME Location : DUDDI (V), Madhavaram Tanda.
52, 060 Ac. Cap TMC Cap TMC 28, 000 Ac. Under Progress.
PRESENTER: K.P.REDDY B.E (Elect), F.I.E S.E (Retd.) APGENCO Associate President, Telangana Retired Engineer's Forum 1.
南水北调东线第一期工程山东段 情况简介. 主要汇报内容 二、南水北调山东段工程总体布置 三、山东段工程项目划分及工程主 要建设内容 一、南水北调东线工程概况 四、前期工作及工程建设进展情况 五、工程总投资.
11th National Food Security Mission Executive Committee Meeting on Department of Agriculture Andhra Pradesh 1.
VELIGALLU PROJECT 1 PROJECT PROFILE: Formation of earth dam, construction of spillway & fabrication and erection of 5 Nos. Radial gates for Veligallu Project.
Presented by Telangana Retired engineers forum 11.
FLOW DIAGRAM OF C.B.R RIGHT CANAL (LINGALA CANAL FROM KM TO KM ) WORKS GROUNDED COMPLETED CHITRAVATHI BALANCING RESERVOIR (Existing) KM 0.00.
TARAKARAMA THIRTHA SAGARAM PROJECT Project Cost : Crores Ayacut: Acres Km. Excavation of RMC including Distributories, Field Channels.
Telangana State Gold Cup Sponsorship proposal package 1.
GOVERNMENT OF TELANGANA Irrigation & CAD Department
AGENDA WATER PROBLEM FLUORIDE ISSUE/PROBLEM
EDUCATION DEPARTMENT, NIRMAL DIST.
All Telangana Database for Marketing
Success story of capsicum
Hyderabad city water supply system
Biksham Gujja and Shiva Kumar Kanike
Presentation on Ken – Betwa Link Project-Phase-II
GOVERNMENT OF TELANGANA in
BRAHMAPUTRA-GODAVARI LINK
PRESENTATION ON KALESHWARAM PROJECT
Review of CADWM Projects Under PMKSY
Велики откриватели и пътешественици


Presentation transcript:

Pranahita – Chevella Project PHASE - II +175.00 20 KM 40 KM

PRANAHITA – CHEVELLA PROJECT PRANAHITHA IS A TRIBUTARY TO RIVER GODAVARI Yield from Pranahitha : 190 TMC Lift height : 65 Mts. (from +110 M to +175M) Length of the pipe line : 20 Km Gravity canal : 40 Km Total length from Pranahita lift point to : 60 Km Yellampally Utilisation : 160 TMC Ayacut : 12 Lakhs Acres Districts Benefited : Adilabad, Karimnagar, Medak, Nizamabad, Nalgonda, and RR Districts. Government issued order in G. O. Rt. No. 623, Dt 15-7-2005 for taking up the investigation and preparation of DPR for lifting of 160 TMC of water from Pranahitha to irrigate 12.00Lakh Acres

PRANAHITA – CHEVELLA PROJECT Name of Work: Preparation of DPR for diverting 160 TMC of water from Pranahitha river to Sripada Sagar Project and identify additional Ayacut of 12.00 lakhs Acres in Adilabad, Karimnagar, Nizamabad, Medak, Nalgonda and Ranga Reddy Districts including drinking water for enroute villages and industrial needs of Hyderabad. Tenders invited. 4 firms participated. Bids opened on 18-8-2005. Bids awarded to M/s WAPCOs